[1] Salman K S, Teo A L J. Windmill modeling consideration and factors influencing the stability of a grid-connected wind power-based embedded generator[J]. IEEE Transactions on Power Systems,2003,18(2):793-802.
[2] Nunes M V A, Lopes J A P. Influence of the variable-speed wind generator in transient stability margin of the conventional generators integrated in electrical grids[J]. IEEE Transactions on Energy Conversion, 2004, 19(4):692-701.
[3] Billinton R, Wangdee W. Reliability-based transmission reinforcement planning associated with large-scale wind farms[J]. IEEE Transactions Power Systems Feb, 2007, 22(1):34-41.
[4] 雷亚洲,王伟胜,印永华.一种静态安全约束下确定电力系统风电准入功率极限的优化方法[J].中国电机工程学报,2001,21(6):25-28.
[5] Wiik J, J.O.Gjerde, T.Gjengedal, et al. Steady state power system issue when planning large wind farms[C]. IEEE Power Engineering Society Winter Meeting,New York,2002.
[6] 郑国强,鲍海,陈树勇. 基于近似线性规划的风电场穿透功率极限优化的改进算法[J].中国电机工程学报,2004,24(10):68-71.
[7] Yu H, Chung C Y, Wong K P, et al. A Chance Constrained Transmission Network Expansion Planning Method With Consideration of Load and Wind Farm Uncertainties[J].IEEE Transactions on Power Systems, 2009, 24(3): 1568-1576.
[8] 王芝茗,苏安龙,鲁顺.基于电力平衡的辽宁电网接纳风电能力分析[J].电力系统自动化,2010,34(3):86-90.
[9] 姚金雄,张世强.基于调峰裕度分析的榆林电网风电接纳能力[J].电力建设,2011,32(2):24-28.
[10] 王正明,陆正南.风电项目投资及其运行的经济性分析 [J].可再生能源, 2008,26(6):21-24.
[11] 曾鸣,刘万福,未瑞,等.风力发电可行性评价指标体系及方法研究 [J].华东电力,2008,36(8):85-88.
[12] 陈雷,邢作霞,钟明方,等.分布式风电场规划中的若干效益量化指标分析 [J].沈阳工业大学学报,2007,29(6):637-641,666.
[13] 舒康,梁镇伟.AHP中的指数标度法[J].系统工程理论与实践,1990,10(1):6-8.
[14] 汪浩,马达.层次分析法标度评价与新标度方法[J].系统工程理论与实践,1993,13(5):24-26.
[15] 骆正清,杨善林.层次分析法中几种标度的比较[J].系统工程理论与实践,2004(9):51-59.
[16] 电力规划设计总院.火电工程限额设计参考造价指标[M]. 北京:中国电力出版社,2009:220-221. |