LIU Lianguang, HAN Longyan, JIANG Zhihua, LIU Zifa. Comparation on Wind Power Collection Capacity of Meshed and Radial Grids[J]. ELECTRIC POWER CONSTRUCTION, 2014, 35(8): 43-48.
[1]Lakervi E,Holmes E.J.配电网络规划与设计[M].范明天,张祖平,岳宗斌,译.北京:中国电力出版社,2009.
[2]刘连光,王智冬.大型高压格式网的构建设想与关键技术[J].电网技术,2013,37(4):1064-1068.
[3]Quinonez V G,Ault G W,Anaya-Lara O,et al.Electrical collector system options for large offshore wind farms[J].Renewable Power Generation,2007,1(2):107-114.
[4]Bahirat H J,Mork B A,Hoidalen H k,et al.Comparison of wind farm topologies for offshore application[C]//IEEE Power and Energy Society General Meeting. San Diego CA:IEEE Power & Energy Society,2012:1-5.
[5]孙君洋,朱淼,高强,等.大型海上交流风电场内部拓扑优化设计[J].电网技术,2013,37(7):1978-1982.
[6]靳静,艾芊,奚玲玲,等.海上风电场内部电气接线系统的研究[J].华东电力,2007,35(10):20-23.
[7]Ambra S,Henrik B,Erik K N.Reliability of collection grids for large offshore wind parks[C]//9th International Conference on Probabilistic Methods Applied to Power Systems,Stockholm,Sweden,2006.
[8]王建东,李国杰.海上风电场内部电气系统布局经济性对比[J].电力系统自动化,2009,33(11):99-103.
[9]谭任深,杨苹,贺鹏,等.考虑电气故障和开关配置的海上风电场集电系统可靠性及灵敏度研究[J].电网技术,2013,37(8):2264-2270.
[10]焦再强.大规模风电接入的继电保护问题综述[J].电网技术,2012,36(7):195-201.
[11]李文沅.电力系统风险评估模型、方法与应用[M].北京:科学出版社,2006:30-31.
[12]Johan R,Lina M B.Survey of failure in wind power system with focus on Swedish wind power plants during 1997-2005[J].IEEE Trans on Energy Conversion,2007,22(1):167-173.
[13]Rajesh K,Hu P.Wind power simulation model for reliability evaluation[C]//IEEE CCECE/CCGEI,Saakatoon,2005.
[14] 黄玲玲,符杨,郭晓明.海上风电场集电系统可靠性评估[J].电网技术,2010,34(7):169-174.
[15]于群,曹娜.MATLAB/Simulink电力系统建模与仿真[M].北京:机械工业出版社,2013:215-220.
[16]袁铁江,晁勤,李建林,等.风电并网技术[M].北京:机械工业出版社,2012:175-177.
[17]任永峰,安中全,李静立,等.双馈式风力发电机组柔性并网运行与控制[M].北京:机械工业出版社,2011:64-65.
[18]Holmstrom Ole,Negra Nicola Barberis.Survey of reliability of large offshore wind farms[M].Milan,Italy:European Wind Energy Association,2007:1940-1949.
[19]Underbrink A, Hanson J,Osterholt A,et al.Probabilistic reliability calculations for the grid connection of an offshore wind farm [M].International Conference on Probabilistic Methods Applied Power Systems,2006:1-5.
[20]严干贵,冯晓东,李军徽,等.用于松弛调峰瓶颈的储能系统容量配置方法[J].中国电机工程学报,2012,32(28):27-35.