[1]刘振亚.国家电网公司输变电工程通用设计,1000 kV变电站分册[M].北京:中国电力出版社,2014.
[2]国家电网公司. Q/GDW 678—2011 智能变电站一体化监控系统功能规范[S]. 北京:中国电力出版社, 2012.
[3]国家电网公司. Q/GDW 679—2011 智能变电站一体化监控系统建设技术规范[S].北京:中国电力出版社, 2012.
[4]王海柱,蔡泽祥, 邵向潮,等.智能变电站过程层网络关键对象建模与仿真[J].中国电力,2013,46(6):80-84.
Wang Haizhu, Cai Zexiang, Shao Xiangchao, et al. Key object modeling and performance simulation of process level networks in smart substation[J].Electric Power,2013,46(6):80-84.
[5]徐春霞,张艳霞, 葛跃田.智能变电站过程层网络数据流的分析与研究[J].中国电力,2013,46(8):153-159.
Xu Chunxia, Zhang Yanxia, Ge Yuetian. Analysis and study on intelligent substation process level network data stream[J].Electric Power,2013,46(8):153-159.
[6]韩本帅,孙中尉, 崔海鹏,等.智能变电站过程层时间同步方式研究[J].中国电力,2012,45(11):86-90.
Han Benshuai, Sun Zhongwei, Cui Haipeng, et al. Research on time synchronization mode in process level of smart substation[J].Electric Power,2012,45(11):86-90.
[7]国家电网公司. Q/GDW 383—2009 智能变电站技术导则[S].北京:中国电力出版社, 2009.
[8]高翔.智能变电站技术[M]. 北京:中国电力出版社, 2012.
[9]高翔. 数字化变电站应用技术[M]. 北京:中国电力出版社, 2008.
[10]刘振亚.国家电网公司输变电工程通用设计: 110(66) kV~750 kV智能变电站部分[M].北京:中国电力出版社,2011.
[11]国家电网公司. Q/GDW 441—2010 智能变电站继电保护技术规范[S]. 北京:中国电力出版社, 2010.
[12]苏麟,孙纯军,褚农. 智能变电站过程层网络构建方案研究[J].电力系统通信,2010,31(213):10-13.
Su Lin, Sun Chunjun, Chu Nong. Network construction scheme for process level in smart substations[J]. Telecommunications for Electric Power system, 2010,31(213):10-13.
[13]邱智勇,陈健民.500 kV数字化变电站组网方式及 VLAV划分探讨[J]. 电工电能新技术,2009,28(4):60-64.
Qiu Zhiyong, Chen Jianmin. Discussion of 500 kV digital substation network mode and VLAN partition[J]. Advaneed Teehnology of Electrical Engineering and Energy,2009,28(4):60-64.
[14]张志鹏,邵华,汤汉松. 数字化变电站GOOSE网络研究设计[J]. 河北电力技术,2013,32(3):26-29.
Zhang Zhipeng, Shao Hua, Tang Hansong. Design research on digital substation GOOSE network[J]. Heibei Electric Power, 2013, 32(3):26-29.
[15]魏勇,罗思需,施迪,等. 基于IEC61850-9-2及GOOSE共网传输的数字化变电站技术应用与分析[J]. 电力系统保护与控制,2010,38(24):146-152.
Wei Yong, Luo Sixu, Shi Di, et al. Research and application on digital substation based on IEC61850-9-2 and GOO SE com m unication in one network[J]. Power System Protection and Control, 2010,38(24):146-152.
[16]胡道徐,李广华.IEC61850通信冗余实施方案[J].电力系统自动化,2007,31(8):100-103.
Hu Daoxu.Li Guanghua. Application of redundant communication using IEC61850[J].Automation of Electric Power Systems,2007,31(8):100-103.
[17]陈原子,徐习东.基于并行冗余网络的数字化变电站通信网络构架[J]. 电力自动化设备,2011,32(1):105-108.
Chen Yuanzi,Xu Xidong. Communication network structure of digital substation based on parallel redundancy[J]. Electric Power Automation Equipment, 2011,32(1):105-108.
[18]李俊刚,宋小会,狄军锋,等. 基于IEC 62439.3的智能变电站网络冗余研究[J].电力系统自动化,2011,35(10):70-73.
Li Jungang,Song Xiaohui,Di Junfeng,et a1.Research on intelligent substation network redundancy based on 1EC 62439—3[J]. Automation of Electric Power Systems,2011,35(10):70-73.
[19]International Electrotechnical Commission. IEC62439 Industrial communication networks:high availability automation networks. Part 3:parallel redundancy protocol(PRP)and high availability seamless ring(HSR)[S]. IEC,2010.
|