WU Yunna, HU Yong. Selection Framework of Photovoltaic Power Generation Project Investment Plans Based on Fuzzy VIKOR Method[J]. Electric Power Construction, 2016, 37(2): 50-56.
[1]程泽,韩丽洁,李思宇,等.光伏发电功率的智能预测算法[J].电力建设,2014,35(7):34-39.
CHENG Ze,HAN Lijie,LI Siyu,et al.Intelligent forecasting algorithm for photovoltaic power generation [J].Electric Power Construction,2014,35(7):34-39.
[2]杨杰,张琳.工程建设项目投资决策方法分析[J].山东省青年管理干部学院学报,2010(2):104-106.
YANG Jie,ZHANG Lin.Study on the investment decision of the engineering project[J].Journal of Shandong Youth Administrative Cadres College,2010(2):104-106.
[3]ARAGONS-BELTRN P,CHAPARRO-GONZLEZ F,PASTOR-FERRANDO J P,et al.An ANP-based approach for the selection of photovoltaic solar power plant investment projects[J].Renewable and Sustainable Energy Reviews,2010,14(1):249-264.
[4]CHEN H H,KANG H Y,LEE A H I.Strategic selection of suitable projects for hybrid solar-wind power generation systems[J].Renewable and Sustainable Energy Reviews,2010,14(1):413-421.
[5]张东方,杨健.基于层次分析法和熵权法的光伏发电项目投资风险模糊综合评价[J].电气时代,2013(8):40-42.
ZHANG Dongfang,YANG Jian.Fuzzy comprehensive evaluation of investment risk of photovoltaic power generation project based on analytic hierarchy process and entropy weight method [J].Electric Age,2013(8):40-42.
[6]李彦斌,于心怡,王致杰.采用灰色关联度与 TOPSIS 法的光伏发电项目风险评价研究[J].电网技术,2013,37(6):1514-1519.
LI Yanbin,YU Xinyi,WANG Zhijie.Risk assessment on photovoltaic power generation project by grey correlation analysis and TOPSIS method [J].Power System Technology,2013,37(6):1514-1519.
[7]XIAO J,YAO Z,QU J,et al.Research on an optimal site selection model for desert photovoltaic power plants based on analytic hierarchy process and geographic information system[J].Journal of Renewable and Sustainable Energy,2013,5(2):023132.
[8]CARRION J A,ESTRELLA A E,DOLS F A,et al.Environmental decision-support systems for evaluating the carrying capacity of land areas:Optimal site selection for grid-connected photovoltaic power plants[J].Renewable and Sustainable Energy Reviews,2008,12(9): 2358-2380.
[9]乌云娜,杨益晟,冯天天,等.风光互补电站宏观选址研究[J].电网技术,2013,37(2):319-326.
WU Yunna,YANG Yisheng,FENG Tiantian,et al.Macroscopic site selection of wind-solar hybrid power station [J].Power System Technology,2013,37(2):319-326.
[10]ZADEH L A.The concept of a linguistic variable and its application to approximate reasoning—I[J].Information sciences,1975,8(3): 199-249.
[11]OPRICOVIC S,TZENG G H.Compromise solution by MCDM methods:A comparative analysis of VIKOR and TOPSIS [J]. European Journal of Operational Research,2004,156(2):445-455.
[12]聂小红.基于群组的序关系和价值工程的钢铁企业备件供应物流成本研究[J].物流技术,2013,32(12):383-385.
NIE Xiaohong.Study on logistics cost in steel-making enterprise spare parts supply based on intra-cluster order relationship and VE [J].Logistics Technology,2013,32(12):383-385.
[13]KAYA T,KAHRAMAN C.Multicriteria renewable energy planning using an integrated fuzzy VIKOR & AHP methodology:The case of Istanbul[J].Energy,2010,35(6):2517-2527.
[14]邹建平,吴应宇.基于模糊 TOPSIS 方法的区域物流基础设施布局方案评价研究[J].东南大学学报:哲学社会科学版,2011,13(1):33-36.
ZOU Jianping,WU Yingyu.A study of the fuzzy TOPSIS-based regional logistics:an analysis of the regional logistics facilities layout [J].Journal of Southeast University:Philosophy and Social Science,2011,13(1):33-36.
[15]刘鸿雁,阎涛,王光远.基于 AHP 和 VIKOR 算法的评标方法研究[J].技术经济, 2009,28(5):32-34.
LIU Hongyan,YAN Tao,WANG Guangyuan.Study on bidding evaluation method based on AHP and VIKOR algorithm [J].Technology Economics, 2009,28(5):32-34.