[1]国家发展和改革委员会. 可再生能源发展“十三五”规划[R/OL]. (2016-12-01)[2018-02-01]. http://www.ndrc.gov.cn/fzgggz/fzgh/ghwb/gjjgh/201706/W020170614416770246673.pdf.
[2]中国可再生能源学会风能专业委员会. 2016年中国风电装机容量简报[R/OL]. (2017-02-19)[2018-02-01]. http://www.escn.com.cn/news/show-397308.html.
[3]王锡凡. 电力系统优化规划[M]. 北京:水利电力出版社, 1990: 268-269.
[4]GARVER L L. Transmission network estimation using linear programming[J]. IEEE Transactions on Power Apparatus and Systems, 1970(7): 1688-1697.
[5]洪绍云, 程浩忠, 曾平良, 等. 输电网扩展优化规划研究综述[J]. 电网技术, 2016, 40(10): 3102-3107.
HONG Shaoyun, CHENG Haozhong, ZENG Pingliang, et al. Review of transmission network expansion optimization planning[J]. Power System Technology, 2016, 40(10): 3102-3107.
[6]熊文, 武鹏, 陈可, 等. 区间负荷下的输电网灵活规划方法[J]. 电网技术, 2012, 36(4): 139-143.
XIONG Wen, WU Peng, CHEN Ke, et al. A flexible planning model of transmission network under interval load[J]. Power System Technology, 2012, 36(4): 139-143.
[7]KHODAEI A, SHAHIDEHPOUR M, WU L, et al. Coordination of short-term operation constraints in multi-area expansion planning[J]. IEEE Transactions on Power Systems, 2012, 27(4): 2242-2250.
[8]BARINGO L, CONEJO A J. Correlated wind-power production and electric load scenarios for investment decisions[J]. Applied Energy, 2013, 101: 475-482.
[9]张玥, 王秀丽, 曾平良, 等. 基于Copula理论考虑风电相关性的源网协调规划[J]. 电力系统自动化, 2017, 41(9): 102-108.
ZHANG Yue, WANG Xiuli, ZENG Pingliang, et al. Copula theory based generation and transmission co-planning considering wind power correlation[J]. Automation of Electric Power Systems, 2017, 41(9): 102-108.
[10]BARINGO L, CONEJO A J. Risk-constrained multi-stage wind power investment[J]. IEEE Transactions on Power Systems, 2013, 28(1): 401-411.
[11]洪绍云, 程浩忠, 曾平良, 等. 基于相关场景聚类的发输电联合扩展规划[J]. 电力系统自动化, 2016, 40(22): 71-76, 92.
HONG Shaoyun, CHENG Haozhong, ZENG Pingliang, et al. Coordinated generation and transmission expansion planning with clusters of correlative scenarios[J]. Automation of Electric Power Systems, 2016, 40(22): 71-76, 92.
[12]YU H, CHUNG C Y, WONG K P. Robust transmission network expansion planning method with Taguchis orthogonal array testing[J]. IEEE Transactions on Power Systems, 2011, 26(3): 1573-1580.
[13]JABR R A. Robust transmission network expansion planning with uncertain renewable generation and loads[J]. IEEE Transactions on Power Systems, 2013, 28(4): 4558-4567.
[14]RUIZ C, CONEJO A J. Robust transmission expansion planning[J]. European Journal of Operational Research, 2015, 242(2): 390-401.
[15]CHEN B, WANG J, WANG L, et al. Robust optimization for transmission expansion planning: Minimax cost vs. minimax regret[J]. IEEE Transactions on Power Systems, 2014, 29(6): 3069-3077.
[16]MINGUEZ R, GARCIA-BERTRAND R. Robust transmission network expansion planning in energy systems: Improving computational performance[J]. European Journal of Operational Research, 2016, 248(1): 21-32.
[17]CHEN B, WANG L. Robust transmission planning under uncertain generation investment and retirement[J]. IEEE Transactions on Power Systems, 2016, 31(6): 5144-5152.
[18]GARCIA-BERTRAND R, MINGUEZ R. Dynamic robust transmission expansion planning[J]. IEEE Transactions on Power Systems, 2017, 32(4): 2618-2628.
[19]ZHANG X, CONEJO A J. Robust transmission expansion planning representing long-and short-term uncertainty[J]. IEEE Transactions on Power Systems, 2018, 33(2): 1329-1338.
[20]DEHGHAN S, AMJADY N, CONEJO A J. Reliability-constrained robust power system expansion planning[J]. IEEE Transactions on Power Systems, 2016, 31(3): 2383-2392.
[21]MOREIRA A, POZO D, STREET A, et al. Reliable renewable generation and transmission expansion planning: Co-optimizing systems resources for meeting renewable targets[J]. IEEE Transactions on Power Systems, 2017, 32(4): 3246-3257.
[22]DEHGHAN S, AMJADY N. Robust transmission and energy storage expansion planning in wind farm-integrated power systems considering transmission switching[J]. IEEE Transactions on Sustainable Energy, 2016, 7(2): 765-774.
[23]ROMERO R, MONTICELLI A, GARCIA A, et al. Test systems and mathematical models for transmission network expansion planning[J]. IEE Proceedings-Generation, Transmission and Distribution, 2002, 149(1): 27-36.
[24]ZENG B, ZHAO L. Solving two-stage robust optimization problems using a column-and-constraint generation method[J]. Operations Research Letters, 2013, 41(5): 457-461.
[25]LOFBERG J. YALMIP[EB/OL]. (2017-09-15) [2018-02-01]. https://yalmip.github.io/.
[26]ILOG CPLEX Optimization Studio. The ILOG CPLEX[EB/OL]. (2017-08-31) [2018-02-01]. http://www.ilog.com/produxts/cplex/.
[27]Probability Methods Subcommittee. IEEE reliability test system[J]. IEEE Transactions on Power Apparatus and Systems, 1979, 98(6): 2047-2054.
[28]National Renewable Energy Laboratory (NREL). System advisor model, SAM 2014.1.14: General description [EB/OL]. (2014-02-01)[2018-02-01]. https://www.osti.gov/biblio/1126294/.
|