Timing Planning for Investment of Wind Farm Clusters According to  Copula-UCVaR Risk Measurement

GAO Jianwei 1,2, LANG Yutong 1,2, GAO Fangjie 1,2, GUO Guiyu 1,2,LIANG Pengcheng 1,2   

  1. 1. School of Economics and Management,North China Electric Power University,Beijing 102206, China; 2. Beijing Key Laboratory of New Energy and Low-Carbon Development (North China Electric Power University),  Beijing 102206, China
  • Online:2020-08-07 Published:2020-08-07
  • Supported by:
    This work is supported by Natural Science Foundation of Beijing Municipality (No. 9202017),Natural Science Foundation of China (No.71671064),National Office for Philosophy and Social Sciences (No.19AGL027),and Fundamental Research Funds for the Central Universities (No.2018ZD14).

Abstract: Considering both economic value and adequacy risk of peak load regulation for the coordination of wind farm clusters and conventional units, this paper proposes an invrestment timing decision method for wind farms clusters. Firstly, we establish an economic value assessment model with option theory to measure the economic value of wind farm clusters investment. Secondly, in order to study the influence of wind speed correlation on peaking adequacy risk, and consider risk preference of investors, by using the Copula function to describe the correlation of wind speed, a UCVaR index based on modified value function in prospect theory is proposed. Then we construct a bi-level programming model that integrates investment economy and peaking adequacy risk. The Monte Carlo simulation and genetic algorithm are used to solve the model. Finally, the example gives the optimal timing scheme in six scenarios. The calculation results show that the correlation of wind speed, the investors risk preference, and the selection of risk index have considerable influence on the timing planning for investment of wind farm clusters. 

Key words: wind farm clusters, investment timing, peak load regulation, risk measurement , Copula