Monthly
ISSN 1000-7229
CN 11-2583/TM
ELECTRIC POWER CONSTRUCTION ›› 2020, Vol. 41 ›› Issue (12): 49-56.doi: 10.12204/j.issn.1000-7229.2020.12.005
• Economical Operation and Optimal Dispatch • Previous Articles Next Articles
WU Jiahao, ZENG Chengbi, MIAO Hong
Received:
2020-06-23
Online:
2020-12-01
Published:
2020-12-04
Contact:
ZENG Chengbi
Supported by:
CLC Number:
WU Jiahao, ZENG Chengbi, MIAO Hong. Economic Dispatch of Integrated Energy System Based on Chance-Constrained Goal Programming[J]. ELECTRIC POWER CONSTRUCTION, 2020, 41(12): 49-56.
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.cepc.com.cn/EN/10.12204/j.issn.1000-7229.2020.12.005
[1] | 孙宏斌, 郭庆来, 潘昭光. 能源互联网: 理念、架构与前沿展望[J]. 电力系统自动化, 2015,39(19):1-8. |
SUN Hongbin, GUO Qinglai, PAN Zhaoguang. Energy internet: Concept, architecture and frontier outlook[J]. Automation of Electric Power Systems, 2015,39(19):1-8 | |
[2] |
YUAN Y, ZHANG X S, JU P, et al. Determination of economic dispatch of wind farm-battery energy storage system using Genetic Algorithm[J]. International Transactions on Electrical Energy Systems, 2014,24(2):264-280.
doi: 10.1002/etep.1696 URL |
[3] | 王成山, 于波, 肖峻, 等. 平滑可再生能源发电系统输出波动的储能系统容量优化方法[J]. 中国电机工程学报, 2012,32(16):1-8. |
WANG Chengshan, YU Bo, XIAO Jun, et al. Sizing of energy storage systems for output smoothing of renewable energy systems[J]. Proceedings of the CSEE, 2012,32(16):1-8. | |
[4] | 丁明, 吴建锋, 朱承治, 等. 具备荷电状态调节功能的储能系统实时平滑控制策略[J]. 中国电机工程学报, 2013,33(1):22-29. |
DING Ming, WU Jianfeng, ZHU Chengzhi, et al. A real-time smoothing control strategy with SOC adjustment function of storage systems[J]. Proceedings of the CSEE, 2013,33(1):22-29. | |
[5] |
徐群, 吕晓禄, 武乃虎, 等. 考虑电池寿命和过放现象的风电场储能容量优化[J]. 电网技术, 2014,38(6):1505-1511.
doi: 10.13335/j.1000-3673.pst.2014.06.013 URL |
XU Qun, LÜ Xiaolu, WU Naihu, et al. Optimization of energy storage capacity for wind farm considering battery life and over-discharge[J]. Power System Technology, 2014,38(6):1505-1511.
doi: 10.13335/j.1000-3673.pst.2014.06.013 URL |
|
[6] | 雷金勇, 郭祚刚, 陈聪, 等. 考虑不确定性及电/热储能的综合能源系统两阶段规划-运行联合优化方法[J]. 电力自动化设备, 2019,39(8):169-175. |
LEI Jinyong, GUO Zuogang, CHEN Cong, et al. Two-stage planning-operation co-optimization of IES considering uncertainty and electrical/thermal energy storage[J]. Electric Power Automation Equipment, 2019,39(8):169-175. | |
[7] | RASTEGAR M, FOTUHI-FIRUZABAD M, ZAREIPOUR H, et al. A probabilistic energy management scheme for renewable-based residential energy hubs[J]. IEEE Transactions on Smart Grid, 2017,8(5):2217-2227. |
[8] | 张刘冬, 袁宇波, 孙大雁, 等. 基于两阶段鲁棒区间优化的风储联合运行调度模型[J]. 电力自动化设备, 2018,38(12):59-66, 93. |
ZHANG Liudong, YUAN Yubo, SUN Dayan, et al. Joint operation model of wind-storage system based on two-stage robust interval optimization[J]. Electric Power Automation Equipment, 2018,38(12):59-66, 93. | |
[9] |
BAI L Q, LI F X, CUI H T, et al. Interval optimization based operating strategy for gas-electricity integrated energy systems considering demand response and wind uncertainty[J]. Applied Energy, 2016,167:270-279.
doi: 10.1016/j.apenergy.2015.10.119 URL |
[10] |
WEI Z N, CHEN S, SUN G Q, et al. Probabilistic available transfer capability calculation considering static security constraints and uncertainties of electricity-gas integrated energy systems[J]. Applied Energy, 2016,167:305-316.
doi: 10.1016/j.apenergy.2015.10.015 URL |
[11] | 孙国强, 陈霜, 卫志农, 等. 计及相关性的电-气互联系统概率最优潮流[J]. 电力系统自动化, 2015,39(21):11-17. |
SUN Guoqiang, CHEN Shuang, WEI Zhinong, et al. Probabilistic optimal power flow of combined natural gas and electric system considering correlation[J]. Automation of Electric Power Systems, 2015,39(21):11-17. | |
[12] | 张思德, 胡伟, 卫志农, 等. 基于机会约束规划的电-气互联综合能源系统随机最优潮流[J]. 电力自动化设备, 2018,38(9):121-128. |
ZHANG Side, HU Wei, WEI Zhinong, et al. Stochastic optimal power flow of integrated power and gas energy system based on chance-constrained programming[J]. Electric Power Automation Equipment, 2018,38(9):121-128. | |
[13] | 张宇帆, 艾芊, 郝然, 等. 基于机会约束规划的楼宇综合能源系统经济调度[J]. 电网技术, 2019,43(1):108-116. |
ZHANG Yufan, AI Qian, HAO Ran, et al. Economic dispatch of integrated energy system at building level based on chance constrained programming[J]. Power System Technology, 2019,43(1):108-116. | |
[14] | 赵书强, 王扬, 徐岩, 等. 基于机会约束目标规划的高风电接入比例下大规模储能与火电协调调度[J]. 中国电机工程学报, 2016,36(4):969-977. |
ZHAO Shuqiang, WANG Yang, XU Yan, et al. Coordinated dispatch of large scale energy storage system and thermal generation in high wind power penetration level system based on chance constrained goal programming[J]. Proceedings of the CSEE, 2016,36(4):969-977. | |
[15] | 王扬, 赵书强, 徐岩, 等. 基于机会约束目标规划的风火储系统滚动调度[J]. 电网技术, 2017,41(1):187-194. |
WANG Yang, ZHAO Shuqiang, XU Yan, et al. Rolling dispatch of wind/thermal/storage system based on chance constrained goal programming[J]. Power System Technology, 2017,41(1):187-194. | |
[16] | CONTINI B. A stochastic approach to goal programming[J]. Operations Research, 1968,16(3):576-586. |
[17] | 郑乐, 胡伟, 陆秋瑜, 等. 储能系统用于提高风电接入的规划和运行综合优化模型[J]. 中国电机工程学报, 2014,34(16):2533-2543. |
ZHENG Le, HU Wei, LU Qiuyu, et al. Research on planning and operation model for energy storage system to optimize wind power integration[J]. Proceedings of the CSEE, 2014,34(16):2533-2543. | |
[18] | 吴嘉豪, 曾成碧, 苗虹. 计及子区域间能量交换的多区域综合能源系统协调经济调度[J]. 电力建设, 2019,40(11):39-47. |
WU Jiahao, ZENG Chengbi, MIAO Hong. Coordinated economic scheduling for multi-regional integrated energy system considering energy exchange between sub-regions[J]. Electric Power Construction, 2019,40(11):39-47. |
[1] | ZHU Xu, YANG Jun, LI Gaojunjie, DONG Xuzhu, LIU Shouwen. Optimal Dispatching Strategy of Regional Integrated Energy System Considering Virtual Energy Storage System朱旭1,杨军1,李高俊杰1,董旭柱1,刘首文2 [J]. ELECTRIC POWER CONSTRUCTION, 2020, 41(8): 99-110. |
[2] | FU Jianmin, YANG Bin, WANG Xiaojun, SUN Qingkai, ZHANG Yizhi, HE Jinghan, ZHANG Fang. Planning of Integrated Energy System for High-Speed Railway Station Considering Energy Storage of Buildings [J]. Electric Power Construction, 2020, 41(3): 13-22. |
[3] | WANG Xi, XU Hao, WANG Haiyan, CHEN Bo, WANG Changhao, LIU Yang. Day-ahead Economic Dispatch of Integrated Energy System Considering Uncertainties of Wind Power and Electric Vehicles [J]. ELECTRIC POWER CONSTRUCTION, 2020, 41(12): 82-91. |
[4] | ZHU Yunjie, QIN Wenping, YU Hao, YAO Hongmin, YIN Qilin, HAN Xiaoqing. Strategy Based on Neural Network for Microgrid Participating in Real-Time Optimal Scheduling of Upper Grid [J]. ELECTRIC POWER CONSTRUCTION, 2020, 41(10): 9-11. |
[5] | ZHANG Yongxin, SHEN Hong, WEN Jun. Storage Control of Integrated Energy System for Integrated Demand Response [J]. Electric Power Construction, 2019, 40(9): 43-51. |
[6] | WAGN Yali, LIU Hong, ZHAO Juan, GUO Yue, ZHANG Chenghao, HAN Changzhan, LIU Mengyi. Distribution Network Economic Dispatch Based on Network Reconfiguration and Power-heat Combined Demand Response [J]. Electric Power Construction, 2019, 40(4): 90-97. |
[7] | JIANG Lichao, LIU Yang, SHEN Xiaodong, YANG Junfeng, LI Min, ZHANG Hongtu, WANG Changhao. Monthly Combination Model of Thermal Power Units Considering Wind Power Absorption and Electricity Contract Decomposition [J]. Electric Power Construction, 2019, 40(12): 30-37. |
[8] | WU Jiahao,ZENG Chengbi,MIAO Hong. Coordinated Economic Scheduling for Multi-Regional Integrated Energy System Considering Energy Exchange Between Sub-Regions [J]. Electric Power Construction, 2019, 40(11): 39-47. |
[9] | ZHOU Buxiang, HUANG Jianan, HUANG Zhengang, ZHANG Baifu, ZHANG Ye. Interval Economic Power System Dispatch Based on Improved TLBO Algorithm [J]. Electric Power Construction, 2018, 39(9): 105-111. |
[10] | GONG Jianfeng, CAO Yuchen, QU Gaoqiang, LIU Hong, JIN Panlong. Research on Day-ahead Power and Heat Combined Dispatch of Microgrid Based on Global Optimization and Multi-agent Game [J]. Electric Power Construction, 2018, 39(12): 22-30. |
[11] | SHUAI Hang, AI Xiaomeng, ZHANG Mengling, YANG Libin, LI Pai, LE Lingling, FANG Jiakun, WEN Jinyu. Economic Dispatch of the Integrated Gas and Power System Based on ADP under Demand Response [J]. Electric Power Construction, 2018, 39(11): 1-9. |
[12] |
LIU Ran, ZHAO Hongshan.
An Environmental/Economic Dispatch Model for Conventional Power Plants and Virtual Power Plants Considering Pollutant Emission Constraint
|
[13] |
XIE Min, DU Yuxin, CHENG Peijun, HU Xintong, LIU Mingbo.
Membrane Computing Method for Power System Dynamic Economic Dispatch Optimization Problem
|
[14] |
YI Chen,REN Jianwen,QI Jianwen.
Fuzzy Optimal Dispatch of Wind Power Consumption Considering Demand Response
|
[15] |
SUN Ke, HE De, LI Chunxiao, DONG Shufeng, XU Hang, HE Zhongxiao.
Multi-Energy Cooperative Optimization Model of Factory IES Considering Multi-Model of Ice Storage
[J]. Electric Power Construction, 2017, 38(12): 12-.
|
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||
Copyright @ ELECTRIC POWER CONSTRUCTION Editorial Office
Address: Tower A225, SGCC, Future Science & Technology Park,Beijing, China Postcode:102209 Telephone:010-66602697
Technical support: Beijing Magtech Co.ltd support@magtech.com.cn