Monthly
ISSN 1000-7229
CN 11-2583/TM
ELECTRIC POWER CONSTRUCTION ›› 2021, Vol. 42 ›› Issue (10): 101-109.doi: 10.12204/j.issn.1000-7229.2021.10.011
• New Energy Power Generation • Previous Articles Next Articles
QIU Gefei, ZHANG Pengkun(), HE Piao
Received:
2020-12-31
Online:
2021-10-01
Published:
2021-10-09
Contact:
ZHANG Pengkun
E-mail:843353841@qq.com
Supported by:
CLC Number:
QIU Gefei, ZHANG Pengkun, HE Piao. Economic Dispatch of Power System Considering Wind Power Integration[J]. ELECTRIC POWER CONSTRUCTION, 2021, 42(10): 101-109.
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.cepc.com.cn/EN/10.12204/j.issn.1000-7229.2021.10.011
[1] | 刘开俊, 高艺, 宋福龙. 多适应性电网规划风险评估框架设计及应用展望[J]. 电力建设, 2014, 35(12): 1-5. |
LIU Kaijun, GAO Yi, SONG Fulong. Risk assessment framework design on flexibility power grid planning and its application prospect[J]. Electric Power Construction, 2014, 35(12): 1-5. | |
[2] | 黄启文. 规模化风电接入的电力系统经济调度并行算法研究[D]. 广州: 华南理工大学, 2019. |
HUANG Qiwen. Research on parallel algorithm for economic dispatch of power systems with large-scale wind power integration[D]. Guangzhou: South China University of Technology, 2019. | |
[3] | 杨柳青, 林舜江, 刘明波, 等. 考虑风电接入的大型电力系统多目标动态优化调度[J]. 电工技术学报, 2014, 29(10): 286-295. |
YANG Liuqing, LIN Shunjiang, LIU Mingbo, et al. Multi-objective dynamic optimal dispatch for large-scale power systems considering wind power penetration[J]. Transactions of China Electrotechnical Society, 2014, 29(10): 286-295. | |
[4] | 夏澍, 周明, 李庚银. 考虑线路安全校核的含风电电力系统有功和备用协调调度[J]. 中国电机工程学报, 2013, 33(13): 18-26. |
XIA Shu, ZHOU Ming, LI Gengyin. A coordinated active power and reserve dispatch approach for wind power integrated power systems considering line security verification[J]. Proceedings of the CSEE, 2013, 33(13): 18-26. | |
[5] | 邱威, 张建华, 刘念. 含大型风电场的环境经济调度模型与解法[J]. 中国电机工程学报, 2011, 31(19): 8-16. |
QIU Wei, ZHANG Jianhua, LIU Nian. Model and solution for environmental/economic dispatch considering large-scale wind power penetration[J]. Proceedings of the CSEE, 2011, 31(19): 8-16. | |
[6] | 王淑云, 娄素华, 吴耀武, 等. 计及火电机组深度调峰成本的大规模风电并网鲁棒优化调度[J]. 电力系统自动化, 2020, 44(1): 118-125. |
WANG Shuyun, LOU Suhua, WU Yaowu, et al. Robust optimal dispatch of large-scale wind power integration considering deep peak regulation cost of thermal power units[J]. Automation of Electric Power Systems, 2020, 44(1): 118-125. | |
[7] | 王文睿, 瞿凯平, 余涛, 等. 同步优化容许区间与期望发电成本的风电鲁棒估计法[J]. 电力系统自动化, 2020, 44(8): 48-56. |
WANG Wenrui, QU Kaiping, YU Tao, et al. Robust estimation method of wind power with simultaneous optimization of allowable interval and expected generation cost[J]. Automation of Electric Power Systems, 2020, 44(8): 48-56. | |
[8] | 张刘冬, 袁宇波, 孙大雁, 等. 基于两阶段鲁棒区间优化的风储联合运行调度模型[J]. 电力自动化设备, 2018, 38(12): 59-66. |
ZHANG Liudong, YUAN Yubo, SUN Dayan, et al. Joint operation model of wind-storage system based on two-stage robust interval optimization[J]. Electric Power Automation Equipment, 2018, 38(12): 59-66. | |
[9] | 仉梦林, 艾小猛, 文劲宇. 含风电电力系统的主从博弈经济调度[J]. 控制理论与应用, 2018, 35(5): 653-661. |
ZHANG Menglin, AI Xiaomeng, WEN Jinyu. Economic dispatch for power system integrated with wind power using Stackelberg game[J]. Control Theory & Applications, 2018, 35(5): 653-661. | |
[10] | 符杨, 陈铤, 李振坤, 等. 考虑弃风限制的电网鲁棒安全经济调度[J]. 中国电机工程学报, 2017, 37(S1): 47-54. |
FU Yang, CHEN Ting, LI Zhenkun, et al. Robust security economic dispatch considering wind power curtailment[J]. Proceedings of the CSEE, 2017, 37(S1): 47-54. | |
[11] | 周步祥, 黄家南, 黄振刚, 等. 基于改进TLBO算法的电力系统区间经济调度[J]. 电力建设, 2018, 39(9): 105-111. |
ZHOU Buxiang, HUANG Jianan, HUANG Zhengang, et al. Interval economic power system dispatch based on improved TLBO algorithm[J]. Electric Power Construction, 2018, 39(9): 105-111. | |
[12] | 拓守恒, 雍龙泉, 邓方安. “教与学”优化算法研究综述[J]. 计算机应用研究, 2013, 30(7): 1933-1938. |
TUO Shouheng, YONG Longquan, DENG Fangan}. Survey of teaching-learning-based optimization algorithms[J]. Application Research of Computers, 2013, 30(7): 1933-1938. | |
[13] | 邱骁奇, 胡志坚. 基于改进教与学优化算法的配电网重构[J]. 电力系统保护与控制, 2016, 44(12): 42-49. |
QIU Xiaoqi, HU Zhijian. Reconfiguration of distribution network based on improved teaching-learning-based optimization algorithm[J]. Power System Protection and Control, 2016, 44(12): 42-49. | |
[14] |
YANG D F, JIANG C, CAI G W, et al. Optimal sizing of a wind/solar/battery/diesel hybrid microgrid based on typical scenarios considering meteorological variability[J]. IET Renewable Power Generation, 2019, 13(9): 1446-1455.
doi: 10.1049/iet-rpg.2018.5944 URL |
[15] | TALBI E G. A taxonomy of metaheuristics for Bi-level optimization[M]// Metaheuristics for Bi-level Optimization. Berlin, Heidelberg: Springer Berlin Heidelberg, 2013: 1-39. |
[16] | 沈伟, 吴文传, 张伯明, 等. 消纳大规模风电的在线滚动调度策略与模型[J]. 电力系统自动化, 2011, 35(22): 136-140. |
SHEN Wei, WU Wenchuan, ZHANG Boming, et al. An on-line rolling generation dispatch method and model for accommodating large-scale wind power[J]. Automation of Electric Power Systems, 2011, 35(22): 136-140. | |
[17] | 李志刚, 吴文传, 张伯明. 消纳大规模风电的鲁棒区间经济调度 (一)调度模式与数学模型[J]. 电力系统自动化, 2014, 38(20): 33-39. |
LI Zhigang, WU Wenchuan, ZHANG Boming. A robust interval economic dispatch method accommodating large-scale wind power generation part one dispatch scheme and mathematical model[J]. Automation of Electric Power Systems, 2014, 38(20): 33-39. | |
[18] | 李志刚, 吴文传, 张伯明. 消纳大规模风电的鲁棒区间经济调度 (二)不确定集合构建与保守度调节[J]. 电力系统自动化, 2014, 38(21): 32-38. |
LI Zhigang, WU Wenchuan, ZHANG Boming. A robust interval economic dispatch method accommodating large-scale wind power generation part two uncertainty set modeling and conservativeness adjustment[J]. Automation of Electric Power Systems, 2014, 38(21): 32-38. | |
[19] | 陈建华, 吴文传, 张伯明, 等. 安全性与经济性协调的鲁棒区间风电调度方法[J]. 中国电机工程学报, 2014, 34(7): 1033-1040. |
CHEN Jianhua, WU Wenchuan, ZHANG Boming, et al. A robust interval wind power dispatch method considering the tradeoff between security and economy[J]. Proceedings of the CSEE, 2014, 34(7): 1033-1040. | |
[20] |
BEN-TAL A, NEMIROVSKI A. Robust solutions of Linear Programming problems contaminated with uncertain data[J]. Mathematical Programming, 2000, 88(3): 411-424.
doi: 10.1007/PL00011380 URL |
[21] |
BASU M. Dynamic economic emission dispatch using nondominated sorting genetic algorithm-II[J]. International Journal of Electrical Power & Energy Systems, 2008, 30(2): 140-149.
doi: 10.1016/j.ijepes.2007.06.009 URL |
[1] | TENG Jiachen, LIU Yang, WU Jiayu, WANG Lei, ZHANG Jie. Two-Stage Adjustable Robust Economic Dispatch Based on mRMR-XGboost-IDM Model [J]. ELECTRIC POWER CONSTRUCTION, 2022, 43(9): 140-150. |
[2] | LIANG Dong, GUO Yuwei, WANG Xiaoxue, LIU Qi, WANG Shouxiang. Two-Stage Robust Optimization for Flexible Interconnected Distribution Systems Considering Energy Storages and Dynamic Reconfiguration [J]. ELECTRIC POWER CONSTRUCTION, 2022, 43(9): 94-103. |
[3] | OUYANG Han, LÜ Lin, LIU Junyong, GAO Hongjun. Stochastic Robust Economic Dispatch of Combined Heat and Power Microgrid Considering Renewable Energy Uncertainty [J]. ELECTRIC POWER CONSTRUCTION, 2022, 43(1): 19-28. |
[4] | CAI Jie, ZHAO Haipeng, GUAN Qinyue, GUO Ting, ZHANG Di, MIAO Shihong. An Optimal Energy Flow Calculation Method for Integrated Electricity-Gas System Applying Parametric Linear Programming [J]. ELECTRIC POWER CONSTRUCTION, 2022, 43(1): 29-37. |
[5] | WANG Zhinan, ZHANG Yuhua, HUANG Ke, WANG Cong. Robust Optimal Scheduling Model of Virtual Power Plant Combined Heat and Power Considering Multiple Flexible Loads [J]. ELECTRIC POWER CONSTRUCTION, 2021, 42(7): 1-10. |
[6] | CHEN Tao, LIU Yang, LI Wenfeng, XU Lixiong, MA Teng. Adaptive Microgrid Price-Making Strategy and Economic Dispatching Method Based on Blockchain Technology [J]. ELECTRIC POWER CONSTRUCTION, 2021, 42(6): 17-28. |
[7] | CAI Xiuwen, CHEN Maoxin, CHEN Gang, FANG Yichen, ZHANG Shenxi, CHENG Haozhong. Calculation Method for Maximum Allowable Access Capacity of Distributed PV in Active Distribution Network Considering Active Management and Demand-Side Management [J]. ELECTRIC POWER CONSTRUCTION, 2021, 42(5): 38-47. |
[8] | HUA Guanghui, LI Chen, ZHANG Yong, LI Dan, LIU Chuang, WANG Cheng. Robust Optimization of Building Microgrid Considering the Uncertainty of the Aggregated Power of Thermostatically Controlled Loads [J]. ELECTRIC POWER CONSTRUCTION, 2021, 42(4): 59-68. |
[9] | ZHANG Yuwei, XIAO Jinxing, YANG Jun, XU Bingyan, LI Rui, LI Yonghui. Data-Driven Robust Economic Dispatch for Distribution Network and Multiple Micro-grids Considering Correlativity of Wind and Solar Output [J]. ELECTRIC POWER CONSTRUCTION, 2021, 42(10): 40-50. |
[10] | CHEN Xiaodong, MA Yue, CHEN Xianbang, LIU Yang. Data-Driven Adjustable Robust Optimization of Day-ahead Economic Dispatch of Integrated Energy System with Combined Cool, Heat and Power System [J]. ELECTRIC POWER CONSTRUCTION, 2021, 42(1): 28-40. |
[11] | WANG Hanlin, LIU Yang, XU Lixiong, CHEN Xianbang, TAN Siwei. Research on Hierarchical Coordinated Optimization Model of Multi-microgrid System Considering Wind Power Consumption [J]. ELECTRIC POWER CONSTRUCTION, 2020, 41(8): 87-98. |
[12] | SHANG Huiyu, LIN Hongji, LI Zhonghui, ZHAO Hongwei, CHEN Minghui, YANG Zeng, WEN Fushuan. Robust Optimal Scheduling of Mobile Emergency Power Sources Considering Uncertainties [J]. ELECTRIC POWER CONSTRUCTION, 2020, 41(8): 111-119. |
[13] | LIAO Hongtu, HUANG Yihong, SHI Yizhi, CHEN Jian. A Bi-Level Two-Stage Robust Optimal Operation Strategy for AC and DC Distribution Network with Photovoltaic and Energy Storage [J]. Electric Power Construction, 2020, 41(3): 110-118. |
[14] | WANG Xi, XU Hao, WANG Haiyan, CHEN Bo, WANG Changhao, LIU Yang. Day-ahead Economic Dispatch of Integrated Energy System Considering Uncertainties of Wind Power and Electric Vehicles [J]. ELECTRIC POWER CONSTRUCTION, 2020, 41(12): 82-91. |
[15] | ZHAO Huiru, LU Hao, LI Zijin, WANG Xuejie, LI Bingkang. Two-Stage Robust Optimization of CCHP Microgrid with Consideration of Wind Power and PV Uncertainty andStorage System [J]. ELECTRIC POWER CONSTRUCTION, 2020, 41(11): 116-125. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||
Copyright @ ELECTRIC POWER CONSTRUCTION Editorial Office
Address: Tower A225, SGCC, Future Science & Technology Park,Beijing, China Postcode:102209 Telephone:010-66602697
Technical support: Beijing Magtech Co.ltd support@magtech.com.cn