[1]汤涌. 基于响应的电力系统广域安全稳定控制[J]. 中国电机工程学报,2014,34(21):5041-5050.
TANG Yong. Response-based wide area control for power system security and stability[J]. Proceedings of the CSEE,2014,34(21):5041-5050.
[2]汤涌, 顾卓远. 区域电网远端故障引发互联系统稳定破坏现象探究[J]. 电网技术,2014, 38(1):154-159.
TANG Yong, GU Zhuoyuan. A study on effect of fault occurred in remote end of regional power grid on transient of interconnected power system[J]. Power System Technology,2014,38(1):154-159.
[3]印永华, 郭剑波, 赵建军, 等. 美加"8.14"大停电事故初步分析以及应吸取的教训[J]. 电网技术, 2003, 27(10): 8-11.
YIN Yonghua,GUO Jianbo,ZHAO Jianjun,et al. Preliminary analysis of large scale blackout interconnected North America power grid on August 14 and lessons to be drawn [J]. Power System Technology, 2003, 27(10): 8-11.
[4]ANDERSSON G,DONALEK P,FARMER R, et al. Causes of the 2003 major grid blackouts in North America and Europe, and recommended means to improve system dynamic performance[J]. IEEE Transactions on Power Systems, 2007, 22(3): 1012-1018.
[5]汤涌, 卜广全, 易俊. 印度"7.30"、"7.31"大停电事故分析及启示[J]. 中国电机工程学报, 2012, 32(25): 1-7.
TANG Yong,BU Guangquan,YI Jun.Analysis and lessons of the blackout in Indian power grid on July 30 and 31, 2012[J]. Proceedings of the CSEE, 2012, 32(25): 1-7.
[6]汤涌. 电力系统安全稳定综合防御体系框架[J]. 电网技术, 2012, 36(8): 1-5.
TANG Yong. Framework of comprehensive defense architecture for power system security and stability[J]. Power System Technology, 2012, 36(8): 1-5.
[7]PROASETIJO D, LACHS W R, SUTANTO D. A new load shedding scheme for limiting underfrequency [J]. IEEE Transactions on Power Systems, 1994, 9(3):1371-1381.
[8]高林, 戴义平, 马庆中, 等. 特高压线路解列后区域互联电网一次调频稳定性研究[J]. 电网技术, 2009, 33(20): 27-32.
GAO Lin, DAI Yiping, MA Qingzhong, et al. Research on stability of primary frequency regulation of interconnected power system after trip-out Ultra High Voltage transmission line[J]. Power System Technology, 2009, 33(20): 27-32.
[9]张志强, 徐友平, 袁荣湘, 等. 大型互联区域电网解列后送端电网频率特性及高频切机方案[J].电网技术, 2015,39(1):287-293.
ZHANG Zhiqiang, XU Youping, YUAN Rongxiang, et al. Frequency characteristics of power grid at sending end of split large-scale interconnected regional power grid and corresponding over-frequency generator-tripping scheme[J]. Power System Technology, 2015, 39(1): 287-293.
[10]俞璐, 武群丽, 杨雨昂, 等. 快速解列判据在多通道互联电网中的应用研究[J]. 电力建设, 2014, 35(4): 38-43.
YU Lu, WU Qunli, YANG Yuang, et al. Application research of fast splitting criterion in multi-channel interconnected power system[J]. Electric Power Construction, 2014, 35(4): 38-43.
[11]DELFINO B, MASSUCCO S, MORINI A, et al. Implementation and comparison of different under frequency load-shedding schemes [C]//IEEE PES Summer Meeting, Vancouver, Canada, 2001, 1:307-312.
[12]熊小伏, 周永忠, 周家启. 计及负荷频率特性的低频减载方案研究[J]. 中国电机工程学报, 2005, 25(19): 48-51.
XIONG Xiaofu, ZHOU Yongzhong, ZHOU Jiaqi. Study of under frequency load shedding scheme based on load frequency characteristics[J]. Proceedings of the CSEE, 2005, 25(19): 48-51.
[13]张瑞琪, 闵勇, 侯凯元. 电力系统切机/切负荷紧急控制方案的研究[J]. 电力系统自动化, 2003,27(18):6-12.
ZHANG Ruiqi, MIN Yong, HOU Kaiyuan. A new method for generation shedding and load shedding in power system emergercy control[J]. Automation of Electric Power Systems, 2003,27(18):6-12.
[14]倪向萍, 张雪敏, 梅生伟. 基于复杂网络理论的切机控制策略[J]. 电网技术, 2010, 34(9): 35-41.
NI Xiangping, ZHANG Xuemin, MEI Shengwei. Generator tripping strategy based on complex network theory[J]. Power System Technology,2010, 34(9): 35-41.
[15]王彪, 方万良, 罗煦之. 紧急控制下最优切机切负荷方案的快速算法[J]. 电网技术, 2011, 35(6):82-87.
WANG Biao, FANG Wangliang, LUO Xuzhi. A fast algorithm of optimal generator and load-shedding for emergency control[J]. Power System Technology,2011, 35(6):82-87.
[16]APONTE E E,NELSON J K.Time optimal load shedding for distributed power systems[J].IEEE Transactions on Power Systems,2006,21(1):69-277.
[17]吴晓蓉, 谢开贵, 周家启. 基于电流分解的输电损耗分摊双向追踪方法[J]. 中国电机工程学报, 2005, 25(21): 24-29.
WU Xiaorong, XIE Kaigui, ZHOU Jiaqi. Transmissiong loss allocation method based on current decomposition and bi-directional trace[J]. Proceedings of the CSEE, 2005, 25(21): 24-29.
[18]赵渊, 周家启, 周念成, 等. 发输电系统可靠性评估的启发式就近负荷削减模型[J]. 电网技术, 2005,29(23):34-39.
ZHAO Yuan, ZHOU Jiaqi, ZHOU Niancheng, et al. A heuristic approach to local shedding scheme for reliability assessment of composite generation and transmission system[J]. Power System Technology,2005,29(23):34-39.
[19]贾宏杰, 穆云飞, 余晓丹. 基于直流潮流灵敏度的断面潮流定向控制[J]. 电力系统自动化, 2010, 34(2): 34-38.
JIA Hongjie, MU Yunfei, XU Xiaodan. Directional control method to interface power based on DC power flow and sensitivity[J]. Automation of Electric Power Systems, 2010, 34(2): 34-38.
[20]宋洪磊, 吴俊勇, 郝亮亮. 考虑同调约束的电力系统主动解列断面的搜索方法[J]. 电力系统自动化, 2014, 38(14):49-54.
SONG Honglei, WU Junyong, HAO Liangliang. A searching method for power system controlled islanding surfaces considering coherency constraint[J]. Automation of Electric Power Systems, 2014, 38(14):49-54.
|