[1]刘连光,赵万里,王智冬,等. 大电网建设经济性评价内容与评价指标的研究[J]. 电力建设,2013,34(8):22-26.
Liu Lianguang,Zhao Wanli,Wang Zhidong,et al. Research on economic evaluation contents and indices for large power grid construction[J].Electric Power Construction,2013,34(8):22-26.
[2]王彬, 何光宇, 梅生伟,等. 智能电网评估指标体系的构建方法[J].电力系统自动化,2011,35(23):1-5.
Wang Bin,He Guangyu,Mei Shengwei,et al.Construction method of smart grids assessment index system[J].Automation of Electric Power Systems,2011,35(23):1-5.
[3]孙强,葛旭波,刘林,等.国内外智能电网评价体系对比分析[J].电力系统及其自动化学报,2011,23(6):105-110.
Sun Qiang, Ge Xubo, Liu Lin,et al. Review of smart grid comprehensive assessment systems[J]. Proceedings of the CSU-EPSA,2011,23(6):105-110.
[4]杨海涛,吴国旸,陈西颖,等. 用于间歇性电源高渗透电网规划的安全性评估方法[J].电力系统自动化,2012,36(24):14-19.
Yang Haitao, Wu Guoyang, Chen Xiying,et al.A security assessment method for power grid planning under high penetration of variable generation[J].Automation of Electric Power Systems,2012,36(24):14-19.
[5]吴国旸,宋新立,汤涌,等. 电力系统动态仿真中的安全稳定控制系统建模[J].电力系统自动化,2012,36(3):71-75.
Wu Guoyang, Song Xinli, Tang Yong, et al. Modeling of security and stability control system for power system dynamic simulation[J].Automation of Electric Power Systems,2012,36(3):71-75.
[6]周玮,孙辉,顾宏,等. 计及风险备用约束的含风电场电力系统动态经济调度[J].中国电机工程学报,2012,32(1):47-56.
Zhou Wei, Sun Hui, Gu Hong, et al.Dynamic economic dispatch of wind integrated power systems based on risk reseve constrains[J].Proceeding of the CSEE,2012,32(1):47-56.
[7]刘铠滢,蔡述涛,张尧,等. 基于风险评判的电网规划方法[J].中国电机工程学报,2007,27(22):69-73.
Liu Kaiying, Cai Shutao, Zhang Yao. The Power network planning method based on risk[J].Proceeding of the CSEE,2007,27(22):69-73.
[8]李卫星,李志民,郭志忠,等.考虑经济性收益最大的可用输电能力计算[J].电力系统自动化,2004,28(20):7-11.
Li Weixing, Li Zhimin, Guo Zhizhong, et al.Available transfer capability calculation based on maximizing system benefit[J].Automation of Electric Power Systems,2004,28(20):7-11.
[9]牛辉,程浩忠,张焰,等.电网扩展规划的可靠性和经济性研究综述[J].电力系统自动化,2000,24(1):51-56.
Niu Hui, Cheng Haozhong, Zhang Yan,et al.Review of relaibility and economy problems in transmission expansion planning[J].Automation of Electric Power Systems,2000,24(1):51-56.
[10]舒印彪,张文亮,周孝信,等. 特高压同步电网安全性评估[J].中国电机工程学报,2007,27(34):1-6.
Shu Yinbiao, Zhang Wenliang, Zhou Xiaoxin, et al.Security evaluation of uhv synchronized power grid[J].Proceeding of the CSEE,2007,27(34):1-6.
[11]McCalley J D,Agrawal B L,Vittal V et al.A risk-based security index for determining operating limits in stability-limited electric power system[J]. IEEE Transaction on Power System,1997, 12(3):1210-1219.
[12]Wan H,McCalley J D,Vittal V et al.Risk based voltage security assessment[J]. IEEE Transaction on Power System, 2000,15(4):1247-1254.
[13]赵阳,李华强,王伊渺,等. 基于复杂网络理论和条件概率的灾难性事故风险评估方法[J].电网技术,2013,37(11):3190-3195.
Zhao Yang, Li Huaqiang, Wang Yimiao, et al.A complex network theory and conditional probability based risk assessment method for disastrous accidents[J].Power Systme Technology,2013,37(11):3190-3195.
[14]王智冬.大电网发展规划适应性的评价指标与方法研究[D]. 北京:华北电力大学,2014.
Wang Zhidong. Research on adaptability evaluation indices and methods of large power grid planning[D]. Beijing:North China Electric Power University,2013.
[15]孟仲伟,鲁宗相,宋靖雁.中美电网的小世界拓扑模型比较分析[J].电力系统自动化,2004,28(15):21-24.
Meng Zhongwei,Lu Zongxiang,Song Jingyan.Comparison analysis of the small-world topological model of chinese and american power grids[J].Automation of Electric Power Systems,2004,28(15):21-24.
[16]刘建良, 周杰娜, 杨华. 基于双人博弈且参数估计下的发电商报价策略研究[J]. 中国电机工程学报, 2007, 27(19): 62-67.
Liu Jianliang, Zhou Jiena, Yang Hua. Research on generating entities bidding strategies based on double-person gaming and parameters estimation[J]. Proceedings of the CSEE, 2007, 27(19): 62-67.
[17]王成山, 吉兴全. 输电网投资规划的Nash均衡分析(二):混合策略Nash均衡的分析[J]. 电力系统自动化, 2002, 26(20): 1-6.
Wang Chengshan, Ji Xingquan. Nash equilibrium in the game of transmission expansion(part two):mixed strategy nash equilibrium[J]. Automation of Electric Power Systems, 2002, 26(20): 1-6. |