[1]国家电网公司.城市电力网规划设计导则[Z].2006.
[2]赵俊光,王主丁.电网规划中对变电容载比的探讨[J].电力建设,2008,29(6):12-14.
Zhao Junguang, Wang Zhuding. Discussion on the change of the load ratio of the capacitor in power network planning[J]. Electric Power Construction, 2008, 29(6):12-14.
[3]李永伟.容载比在电网规划中的重要性[J].沿海企业与科技,2009(3):32-33,31.
Li Yongwei. The importance of capacity load ratio in power system planning[J]. Coastal Enterprises and Science & Technology, 2009(3):32-33,31.
[4]李欣然,刘友强,朱湘友,等.地区中压配电网容载比的研究[J]继电器,2006,34(7):47-50.
Li Xinran, Liu Youqiang, Zhu Xiangyou, et al. Study on capacity load ratio of medium voltage distribution network[J]. Relay,2006,34(7):47-50.
[5]陈浩,张焰,俞国勤,等.多电压等级配电网最优容载比的计算方法[J].电气应用,2011(1):25-29.
Chen Hao, Zhang Yan, Yu Guoqin, et al. Multi voltage distribution network optimum capacity loadratio calculation method[J]. Electrotechnical Application, 2011(1):25-29.
[6]肖峻,贡晓旭,王成山. 配电网最大供电能力与N-1安全校验的对比验证[J].电力系统自动化,2012,36(18):86-90
Xiao Jun, Gong Xiaoxu, Wang Chenshan. Comparative research between TSC and N-1 security verification for distribution networks[J].Automation of Electric Power Systems.2012, 36(18):86-90.
[7]肖峻,谷文卓,王成山,等.基于馈线互联关系的配电系统供电能力计算方法[J].电力系统自动化, 2013, 35(17):72-77.
Xiao Jun, Gu Wenzhuo, Wang Chengshan, et al.An evaluation method for power supply capability of distribution system based on analyzing interconnections of feeder[J]. Automation of Electric Power Systems, 2013,35(17):72-77.
[8]肖峻,谷文卓,郭晓丹,等.配电系统供电能力模型[J].电力系统自动化,2011,35(24):47-52.
Xiao Jun, Gu Wenzhuo, Guo Xiaodan, et al.Total supply capability model for distribution systems[J].Automation of Electric Power Systems, 2011, 35(24):47-52.
[9]肖峻,祖国强,贺琪博,等.馈线联络对配电网最大供电能力的作用机理[J].电力系统自动化,2015,39(8):38-44.
Xiao Jun, Zu Guoqiang, He Qibo, et al. Mechanism of the maximum power supply capacity of the feeder[J].Automation of Electric Power Systems, 2015,39(8):38-44.
[10]肖峻,张婷,张跃,等.基于最大供电能力的配电网规划理念与方法[J].中国电机工程学报,2013,33(10):106-113.
Xiao Jun, Zhang Ting, Zhang Yue, et al. Concept and method of distribution network planning based on maximum power supply capacity[J]. Proceedings of the CSEE,2013,33(10):106-113.
[11]Luo F Z, Wang C S, Xiao J, et al. Rapid evaluation method for power supply capability of urban distribution system based on N-1 contingency analysis of main-transformers[J]. International Journal of Electrical Power and Energy System, 2010, 32(10): 1063-1068.
[12]葛少云,韩俊,刘洪,等.基于供电能力的主变站间联络结构优化[J].电网技术,2012,36(8):131-135.
Ge Shaoyun, Han Jun, Liu Hong, et al. Optimization of contact structure among main transformer stations in regional power network based on power supply capability[J]. Power System Technology, 2012,36(8):131-135.
[13]葛少云,何文涛,刘洪,等.中压配电系统供电模型综合评价[J].电力系统保护与控制,2012,40(13):104-109.
Ge Shaoyun, Han Jun, Liu Hong, et al. Comprehensive evaluation of power supply model for medium voltage distribution system[J]. Power System Protection and control, 2012,40(13):104-109.
[14]陈庭记,程浩忠,何明,等.城市中压配电网接线模式研究[J].电网技术,2000,36(9):131-135.
Cheng Tingji, Cheng Haozhong, He Ming, et al. Research on the connection mode of urban middle voltage distribution network [J]. Power System Technology, 2000,36(9):131-135.
[15]黑龙江齐齐哈尔电业局.齐齐哈尔市城区10 kV配电网“十一五”发展规划及2020年远景目标展望[Z].2007: 26-30.
[16]王凯军,肖峻,葛少云,等.杭州滨江区10 kV配电网规划中的接线模式与转供能力分析[J].中国电力, 2005,38(2):64-69.
Wang Kaijun, Xiao Jun, Ge Shaoyun, et al. Connection mode and transfer capability analysis of 10 kV distribution network planning in Binjiang District, Hangzhou[J]. Electric Power,2005,38(2):64-69.
[17]刘宇,赵咏梅.德阳城区10 kV配电网规划研究[J].华中电力,2009,22(4):40-43.
Liu Yu, Zhao Yongmei. Research on 10 kV distribution network planning in Deyang [J].Central China Electric Power,2009,22(4):40-43. |