[1]程林,刘琛,康重庆,等.主动配电网关键技术分析与展望[J].电力建设,2015, 36(1):26-32.
CHEN Lin, LIU Chen, KANG Chongqing,et al.Analysis of development of key technologies in active distribution network[J]. Electric Power Construction, 2015, 36(1):26-32.
[2]丁明,石雪梅.新能源接入对主动配电网的影响[J]. 电力建设,2015, 36(1):76-84.
DING Ming,SHI Xuemei. Effect of new energy paralleling to the active distributed networks[J]. Electric Power Construction, 2015, 36(1):76-84.
[3]张钦,王锡凡,付敏,等.需求响应视角下的智能电网[J]. 电力系统自动化,2009,33(17):49-55.
ZHANG Qin, WANG Xifan, FU Min, et al. Smart grid from the perspective of demand response[J]. Automation of Electric Power Systems, 2009,33(17):49-55.
[4]王蓓蓓,李扬,高赐威. 智能电网框架下的需求侧管理展望与思考[J]. 电力系统自动化,2009,33(20):17-22.
WANG Beibei, LI Yang, GAO Ciwei. Demand side management outlook under smart grid infrastructure[J]. Automation of Electric Power Systems, 2009,33(20):17-22.
[5]盛万兴,史常凯,孙军平,等. 智能用电中自动需求响应的特征及研究框架[J]. 电力系统自动化,2013,37(23):1-7.
SHENG Wanxing, SHI Changkai, SUN Junping, et al. Characteristics and research framework of automated demand response in smart utilization[J]. Automation of Electric Power Systems, 2013,37(23):1-7.
[6]田世明,王蓓蓓,张晶. 智能电网条件下的需求响应关键技术[J]. 中国电机工程学报,2014,34(22): 3576-3589.
TIAN Shiming, WANG Beibei, ZHANG Jing. Key technologies for demand response in smart grid[J]. Proceedings of the CSEE, 2014,34(22): 3576-3589.
[7]汤奕,鲁针针,伏祥运. 居民主动负荷促进分布式电源消纳的需求响应策略[J]. 电力系统自动化,2015,39(24):49-55.
TANG Yi, LU Zhenzhen, FU Xiangyun. Demand response strategies for promoting consumption of distributed power generation with residential active loads[J]. Automation of Electric Power Systems, 2015,39(24):49-55.
[8]杨晶晶,林勇,褚明华,等. 基于用电效用概念的可中断负荷调度模型及其削峰优化算法[J]. 电力建设,2016, 37(7):119-125.
YANG Jingjing, LIN Yong, CHU Minghua, et al. Interruptible load dispatch model and its peak load shifting optimization algorithm based on electrical appliance utility[J]. Electric Power Construction, 2016, 37(7):119-125.
[9]SAFDARIAN A, FOTUHI-FIRUZABAD M, LEHTONEN M. Integration of price-based demand response in DisCos short-term decision model[J]. IEEE Transactions on Smart Grid, 2014, 5(5): 2235-2245.
[10]YOON J H, BALDICK R, NOVOSELAC A. Dynamic demand response controller based on real-time retail price for residential buildings[J]. IEEE Transactions on Smart Grid, 2014, 5(1): 121-129.
[11]CORRADI O, OCHSENFELD H, MADSEN H, et al. Controlling electricity consumption by forecasting its response to varying prices[J]. IEEE Transactions on Power Systems, 2013, 28(1): 421-429.
[12]XU Z, DIAO R, LU S, et al. Modeling of electric water heaters for demand response: a baseline PDE model[J]. IEEE Transactions on Smart Grid, 2014, 5(5): 2203-2210.
[13]ZHANG W, LIAN J, CHANG C Y, et al. Aggregated modeling and control of air conditioning loads for demand response[J]. IEEE Transactions on Power Systems, 2013, 28(4): 4655-4664.
[14]黄海新,邓丽,文峰,等.基于实时电价的用户用电响应行为研究[J].电力建设,2016, 37(2):63-68.
HUANG Haixin,DENG Li, WEN Feng, et al.Customer response behavior based on real-time pricing[J]. Electric Power Construction, 2016, 37(2):63-68.
[15]阮文骏,王蓓蓓,李扬,等. 峰谷分时电价下的用户响应行为研究[J]. 电网技术, 2012, 36(7):86-93.
RUAN Wenjun, WANG Beibei, LI Yang, et al. Customer response behavior in time-of-use price[J]. Power System Technology, 2012, 36(7):86-93.
[16]刘继东,韩学山,韩伟吉,等. 分时电价下用户响应行为的模型与算法[J]. 电网技术,2013,37(10):2973-2978.
LIU Jidong, HAN Xueshan, HAN Weiji, et al.Model and algorithm of customers’ responsive behavior under time-of-use price[J]. Power System Technology, 2013, 37(10):2973-2978.
[17]ISLEIFSSON F R. Use of local dynamic electricity prices for indirect control of DER power units[C]//Proceedings of 22nd International Conference and Exhibition on Electricity Distribution (CIRED 2013). Stockholm, Sweden: IET, 2013: 1-4.
[18]孙宇军,李扬,王蓓蓓,等. 计及不确定性需求响应的日前调度计划模型[J]. 电网技术. 2014, 38(10):2708-2714.
SUN Yujun, LI Yang, WANG Beibei, et al. A day-ahead scheduling model considering demand response and its uncertainty[J]. Power System Technology, 2014, 38(10):2708-2714.
[19]胡福年. 电力市场环境下峰谷分时电价理论建模与影响分析[D].南京:南京理工大学,2007.
HU Funian. Study on modeling and analysis of the peak-valley TOU power price in electricity market[D]. Nanjing: Nanjing University of Science and Technology,2007.
[20]郜璘. 基于用户响应的峰谷分时电价决策优化模型的应用研究[D].合肥:合肥工业大学,2010.
GAO Lin. The application study of time-of-use decision price optimizing model based on customer’s response[D]. Hefei: Hefei University of Technology, 2010.
[21]LI X, ZIELKEG K. One-year deferral method for estimating avoided transmission and distribution costs[J].IEEE Transaction on Power Systems, 2005, 20(3):1408-1413.
[22]熊虎,向铁元,陈红坤,等.含大规模间歇式电源的模糊机会约束机组组合研究[J].中国电机工程学报,2013,33(13):36-44.
XIONG Hu,XIANG Tieyuan,CHEN Hongkun,et al. Research of fuzzy chance constrained unit commitment containing large-scale intermittent power[J]. Proceedings of the CSEE, 2013, 33(13):36-44.
[23]刘宝碇,赵瑞清,王刚.不确定规划及应用[M].北京:清华大学出版社,2008:178-198.
LIU Baoding,ZHAO Ruiqing,WANG Gang.Uncertainty programming with applications[M].Beijing:Tsinghua University Press,2008:178-198.
[24]黄平.粒子群算法改进及其在电力系统的应用[D].广州:华南理工大学,2012.
HUANG Ping.Improved particle swarm algorithm and its application in power system[D].Guangzhou: South China University of Technology,2012.
|