Comparative Analysis of Wait-and-See Model for Economic Dispatch of Wind Power System
LI Jinhua1, ZHU Dunlin1, PAN Yi2
1.Guangxi Key Laboratory of Power System Optimization and Energy Technology (Guangxi University),Nanning 530004, China;2. China Electric Power Research Institute, Beijing 100192, China
Online:2016-06-01
Supported by:
Project supported by National Natural Science Foundation of China(51377027 )
LI Jinhua, ZHU Dunlin, PAN Yi. Comparative Analysis of Wait-and-See Model for Economic Dispatch of Wind Power System[J]. Electric Power Construction, 2016, 37(6): 62-69.
[1]黎静华,桑川川.能源综合系统优化规划与运行框架[J].电力建设,2015,36(8):41-48.
LI Jinghua,SANG Chuanchuan.Discussion on optimal planning and operation framework for integrated energy system[J].Electric Power Construction,2015,36(8):41-48.
[2]杨佳俊,雷宇,龙淼,等.考虑风电和负荷不确定性的机组组合研究[J].电力系统保护与控制,2014,42(3):63-70.
YANG Jiajun,LEI Yu,LONG Miao,et al.Study of unit commitment considering the uncertainty of wind farm and load[J].Power System Protection and Control,2014,42(3):63-70.
[3]张步涵,邵剑,吴小珊,等.基于场景树和机会约束规划的含风电场电力系统机组组合[J].电力系统保护与控制,2013,41(1):127-135.
ZHANG Buhan,SHAO Jian,WU Xiaoshan,et al.Unit commitment with wind farms using scenario tree and chance-constrained programming [J].Power System Protection and Control,2013,41(1):127-135.
[4]于佳,任建文,周明.基于机会约束规划的风-蓄联合动态经济调度[J].电网技术,2013,37(8):2116-2122.
YU Jia,REN Jianwen,ZHOU Ming.A chance-constrained programming based dynamic economic dispatch of wind farm and pumped-storage power station[J].Power System Technology,2013,37(8):2116-2122.
[5]LI J H,WEN J Y,CHENG S J,et al.Minimum energy storage for power system with high wind power penetration using p-efficient point theory [J].Science China Information Sciences,2014,57(12):2475-2486.
[6]LIU X,XU W.Economic load dispatch constrained by wind power availability:A here-and-now approach[J].IEEE Transactions on Sustainable Energy,2010,1(1):2-9.
[7]WANG Q,WANG J,GUAN Y.Wind power bidding based on chance-constrained optimization[C]//IEEE Power and Energy Society General Meeting.San Diego:IEEE,2011:1-2.
[8]LIU X.Economic load dispatch constrained by wind power availability:A wait-and-see approach[J].IEEE Transactions on Smart Grid,2010,1(3):347-355.
[9]徐秋实,邓长虹,赵维兴,等.含风电电力系统的多场景鲁棒调度方法[J].电网技术,2014,38(3):653-661.
XU Qiushi,DENG Changhong,ZHAO Weixing,et al.A multi-scenario robust dispatch method for power grid integrated with wind farms[J].Power System Technology,2014,38(3):653-661.
[10]黎静华,韦化,莫东.含风电场最优潮流的Wait-and-See 模型与最优渐近场景分析[J].中国电机工程学报,2012,32(22):15-23.
LI Jinghua,WEI Hua,MO Dong.A symptotically optimal scenario analysis and wait-and-see model for optimal power flow with wind power[J].Proceedings of the CSEE,2012,32(22):15-23.
[11]谢敏,闫圆圆,刘明波,等.含随机风电的大规模多目标机组组合问题的向量序优化方法[J].电网技术,2015,39(1):215-222.
XIE Ming,YAN Yuanyuan,LIU Mingbo,et al.A vector ordinal optimization method for large-scale multi-objective unit commitment considering stochastic wind power generation[J].Power System Technology,2015,39(1):215-222.
[12]李嘉,何光宇,刘锋,等.考虑风电出力不确定性与半绝对离差风险的机组组合模型[J].电力建设,2014,35(12):46-53.
LI Jia,HE Guangyu,LIU Feng,et al.Unit commitment model considering uncertain wind power and lower semi-absolute deviation risk [J].Electric Power Construction,2014,35(12):46-53.
[13]黎静华,文劲宇,程时杰,等.考虑多风电场出力Copula 相关关系的场景生成方法[J].中国电机工程学报,2013,33(16):30-36.
LI Jinghua,WEN Jinyu,CHENG Shijie,et al.A scene generation method considering copula correlation relationship of multi-wind farms power[J].Proceedings of the CSEE,2013,33(16):30-36.
[14]SURENDER REDDY S,BIJWE P R,ABHYANKAR A R.Real-time economic dispatch considering renewable power generation variability and uncertainty over scheduling period[J].Systems Journal IEEE, 2015,9(4): 1440-1451.
[15]董晓天,严正,冯冬涵,等.计及风电出力惩罚成本的电力系统经济调度[J].电网技术,2012,36(8):76-80.
DONG Xiaotian,YAN Zheng,FENG Donghan,et al.Power system economic dispatch considering penalty cost of wind farm output[J].Power System Technology,2012,36(8):76-80.
[16]VILLANUEVA D,FEIJO A,PAZOS J L.Simulation of correlated wind speed data for economic dispatch evaluation[J].IEEE Transactions on Sustainable Energy,2012,3(1):142-149.
[17]翁振星,石立宝,徐政,等.计及风电成本的电力系统动态经济调度[J].中国电机工程学报,2014,34(4):514-523.
WENG Zhenxing,SHI Libao,XU Zheng,et al.Power system dynamic economic dispatch incorporating wind power cost[J].Proceedings of the CSEE,2014,34(4):514-523.
[18]JABR R,PAL B C.Intermittent wind generation in optimal power flow dispatching[J].Generation,Transmission & Distribution,IET,2009,3(1):66-74.
[19]ZHANG S,SONG Y,HU Z,et al.Robust optimization method based on scenario analysis for unit commitment considering wind uncertainties[C]//IEEE Power and Energy Society General Meeting.San Diego:IEEE,2011:1-7.
[20]WANG J,SHAHIDEHPOUR M,LI Z.Security-constrained unit commitment with volatile wind power generation[J].IEEE Transactions on Power Systems,2008,23(3):1319-1327.
[21]高红均,刘俊勇,刘继春,等.基于坏场景集的含风电机组组合模型[J].电力系统保护与控制,2013,41(10):27-32.
GAO Hongjun,LIU Junyong,LIU Jichun,et al.The unit commitment with wind power based on the bad scenario set[J].Power System Protection and Control,2013,41(10):27-32.
[22]张晓辉,闫柯柯,卢志刚,等.基于场景概率的含风电系统多目标低碳经济调度[J].电网技术,2014,38(7): 1835-1841.
ZHANG Xiaohui,YAN Keke,LU Zhigang,et al.Scenario probability based multi-objective optimized low-carbon economic dispatching for power grid integrated with wind farms[J].Power System Technology,2014,38(7):1835-1841.
[23]LI Jinghua,FANG Jiakun,WEN Jinyu,et al.Optimal trade-off between regulation and wind curtailment in the economic dispatch problem[J].CSEE Journal of Power and Energy Systems.2015,1(4):37-45.
[24]LI Jinghua,LAN Fei, WEI Hua.A scenario optimal reduction method for wind power time series [J].IEEE Transactions on Power Systems, 2016, 31(2):1657-1658.