• CSCD核心库收录期刊
  • 中文核心期刊
  • 中国科技核心期刊

ELECTRIC POWER CONSTRUCTION ›› 2021, Vol. 42 ›› Issue (1): 96-104.doi: 10.12204/j.issn.1000-7229.2021.01.011

• Smart Grid • Previous Articles     Next Articles

Capacity Configuration and Coordinated Operation Strategy in the Multi-station Integration Scenario

MA Huimeng, LI Xiangjun, JIA Xuecui   

  1. State Key Laboratory of Control and Operation of Renewable Energy and Storage Systems (China Electric Power Research Institute), Beijing 100192, China
  • Received:2020-05-18 Online:2021-01-01 Published:2021-01-07
  • Supported by:
    research program “Key Technology of ‘Three Stations in One’for Substation, Charging and Discharging (Energy Storage) Station and Data Center”of State Grid Corporation of China.

Abstract:

In the scene of multi-station (electric vehicle charging station, 5G communication base station, data center, distributed photovoltaic power station, energy storage station) integration, in order to solve the problem of size optimization and coordinated operation under the constraints of site conditions, functional integration, business requirements, etc. Firstly, the resource demand of each station and the possible functional fusion points among stations are analyzed. And on the basis of this, in order to improve the utilization rate of spare space in the existing substation, we take every station as configuration objects. The configuration principle of each station is defined. And a scheme of functional integration among stations is proposed. Then, to support the function integration scheme, the optimal capacity configuration model and the coordinated control strategy among stations are established. Finally, YALMIP/CPLEX is used to solve the optimization model, and the effectiveness of configuration method and coordinated control strategy have been verified by a typical example.

Key words: multi-station integration, substation, data center, energy storage system, coordinated operation

CLC Number: