Distribution Planning Model in Active Distribution Network Considering Fuzziness and Randomness
FAN Zhicheng, ZHU Junpeng, WU Han, YUAN Yue
College of Energy and Electrical Engineering, Hohai University, Nanjing 211100, China
Online:2019-02-01
About author:范志成(1993),男,通信作者,硕士研究生,主要研究方向为主动配电网电源规划;
朱俊澎(1990),男,讲师,主要研究方向为主动配电网规划、运行与控制;
吴涵(1993),男,博士研究生,主要研究方向为主动配电网运行与规划;
袁越(1966),男,博士,教授,博士生导师,主要方向为电力系统运行与分析、可再生能源发电系统等。
Supported by:
This work is supported by Natural Science Foundation of Jiangsu Province (No. BK20180507) and Fundamental Research Funds for the Central Universities (No. 2018B02014).
FAN Zhicheng, ZHU Junpeng, WU Han, YUAN Yue. Distribution Planning Model in Active Distribution Network Considering Fuzziness and Randomness[J]. Electric Power Construction, 2019, 40(2): 37-44.
[1]MUOZ-DELGADO G, CONTRERAS J, ARROYO J M. Multistage generation and network expansion planning in distribution systems considering uncertainty and reliability[J]. IEEE Transactions on Power Systems, 2016, 31(5): 3715-3728.
[2]ROMERO R, ROCHA C,MANTOVANI M, et al. Analysis of heuristic algorithms for the transportation model in static and multistage planning in network expansion systems[J]. IET Proceedings - Generation, Transmission and Distribution, 2003, 150(5): 521-526.
[3]张沈习, 袁加妍, 程浩忠,等. 主动配电网中考虑需求侧管理和网络重构的分布式电源规划方法[J]. 中国电机工程学报, 2016,36(s1):1-9.
ZHANG Shenxi, YUAN Jiayan, CHENG Zhonghao, et al. Optimal distributed generation planning in active distribution network considering demand side management and network reconfiguration [J]. Proceedings of the CSEE, 2016,36(s1):1-9.
[4]张宁, 胡兆光, 周渝慧, 等. 计及随机模糊双重不确定性的源网荷协同规划模型[J]. 电力系统自动化, 2016, 40(1): 39-44.
ZHANG Ning, HU Zhaoguang, ZHOU Yuhui, et al. Source-grid-load coordinated planning model considering ranfomness and fuzziness[J]. Automation of Electric Power Systems, 2016, 40(1): 39-44.
[5]张彼德, 何頔, 张强,等. 含分布式电源的配电网双层扩展规划[J]. 电力系统保护与控制, 2016, 44(2):80-85.
ZHANG Bide, HE Di, ZHANG Qiang, et al. Double distribution network expansion planning including distributed power[J]. Power System Protection and Control, 2016, 44(2):80-85.
[6]邢海军, 程浩忠, 杨镜非,等. 考虑多种主动管理策略的配电网扩展规划[J]. 电力系统自动化, 2016, 40(23): 70-76.
XING Haijun, CHENG Haozhong, YANG Jingfei, et al. Distribution network expansion planning considering multiple active management strategies[J]. Automation of Electric Power Systems, 2016, 40(23): 70-76.
[7]李秀磊, 耿光飞, 季玉琦, 等. 主动配电网中储能和需求侧响应的联合优化规划[J]. 电网技术, 2016, 40(12): 3803-3810.
LI Xiulei, GENG Guangfei, JI Yuqi, et al. Integrated optimal planning of energy storage and demand side response in active power distribution network[J]. Power System Technology, 2016, 40(12): 3803-3810.
[8]宋福龙, 吴洲洋, 张艳,等. 大规模风电下基于模糊场景聚类的网-储协调规划方法[J]. 电力自动化设备, 2018, 38(2):74-80.
SONG Fulong, WU Zhouyang, ZHANG Yan, et al. Fuzzy scene clustering based grid-energy storage coordinated planning method with large-scale wind power[J]. Electric Power Automation Equipment, 2018, 38(2):74-80.
[9]薛禹胜, 雷兴, 薛峰, 等. 关于风电不确定性对电力系统影响的评述[J]. 中国电机工程学报, 2014, 34(29):5029-5040.
XUE Yusheng, LEI Xing, XUE Feng, et al. A review on impacts of wind power uncertainties on power systems[J]. Proceedings of the CSEE, 2014, 34(29):5029-5040.
[10]高红均, 刘俊勇, 魏震波, 等. 主动配电网分层鲁棒规划模型及其求解方法[J]. 中国电机工程学报, 2017, 37(5): 1389-1400.
GAO Hongjun, LIU Junyong, WEI Zhenbo, et al. A bi-level robust planning model of active distribution network and its solution method[J]. Proceedings of the CSEE, 2017, 37(5): 1389-1400.
[11]王淳, 高元海. 采用最优模糊C均值聚类和改进化学反应算法的配电网络动态重构[J]. 中国电机工程学报, 2014, 34(10):1682-1691.
WANG Chung, GAO Yuanhai. Dynamic reconfiguration of distribution network based on optimal fuzzy C-means clustering and improved chemical reaction optimization[J]. Proceedings of the CSEE, 2014, 34(10):1682-1691.
[12]王群, 董文略, 杨莉. 基于Wasserstein距离和改进K-medoids聚类的风电/光伏经典场景集生成算法[J]. 中国电机工程学报, 2015, 35(11): 2654-2661.
WANG Qun, DONG Wenlue, YANG Li. A wind power/photovoltaic typical scenario set generation algorithm based on wasserstein distance metric and revised K-medoids cluster[J]. Proceedings of the CSEE, 2015, 35(11): 2654-2661.
[13]张沈习, 程浩忠, 邢海军, 等. 配电网中考虑不确定性的分布式电源规划研究综述[J]. 电力自动化设备, 2016, 36(8): 1-9.
ZHANG Shenxi, CHENG Haozhong, XING Haijun, et al. Review of DG planning considering uncertainties for distribution network[J]. Electric Power Automation Equipment, 2016, 36(8): 1-9.
[14]刘宝碇. 不确定规划及应用[M]. 北京:清华大学出版社, 2003.
[15]马瑞, 张强, 吴瑕, 等. 日风速随机模糊不确定模型[J]. 中国电机工程学报, 2015, 35(24): 6351-6358.
MA Rui, ZHANG Qiang, WU Xia, et al. Random fuzzy uncertain model for daily wind speed[J]. Proceedings of the CSEE, 2015, 35(24): 6351-6358.
[16]LIU B. Theory and practice of uncertain programming[M]. Berlin: Springer, 2009.
[17]江岳文, 陈冲, 温步瀛. 含风电场的电力系统机组组合问题随机模拟粒子群算法[J]. 电工技术学报, 2009, 24(6): 129-137.
JIANG Yuewen, CHEN Chong, WEN Buying. Particle swarm research of stochastic simulation for unit commitment in wind farms integrated power system[J]. Transactions of China Electrotechnical Society, 2009, 24(6): 129-137.
[18]薛金花, 叶季蕾, 陶琼, 等. 采用全寿命周期成本模型的用户侧电池储能经济可行性研究[J]. 电网技术, 2016, 40(8): 2471-2476.
XUE Jinhua, YE Jilei, TAO Qiong, et al. Economic feasibility of user-side battery energy storage based on whole-life-cycle cost model[J]. Power System Technology, 2016, 40(8): 2471-2476.
[19]ZHU J, GU W, LOU G, et al. Learning automata-based methodology for optimal allocation of renewable distributed generation considering network reconfiguration[J]. IEEE Access, 2017, 5(99):14275-14288.
[20]GAMS Development Corporation. GAMS, the solvers’ manual[EB/OL]. [2013-12-23](2018-07-01). http:// www.gams.com/solvers/.
[21]苏海锋, 张建华, 梁志瑞,等. 基于LCC和改进粒子群算法的配电网多阶段网架规划优化[J]. 中国电机工程学报, 2013, 33(4): 118-125.
SU Haifeng, ZHANG Jianhua, LIANG Zhirui, et al. Multi-stage planning optimization for power distribution network based on LCC and improved PSO[J]. Proceedings of the CSEE, 2013, 33(4): 118-125.
[22]NICKABADI A, EBADZADEH M M, SAFABAKHSH R. A novel particle swarm optimization algorithm with adaptive inertia weight[J]. Applied Soft Computing, 2011, 11(4):3658-3670.