[1]蔡亦竹, 柳璐, 程浩忠, 等. 全寿命周期成本(LCC)技术在电力系统中的应用综述[J]. 电力系统保护与控制, 2011, 39(17): 149-154.
CAI Yizhu, LIU Lu, CHENG Haozhong, et al. Application review of life cycle cost(LCC)technology in power system[J]. Power System Protection and Control, 2011, 39(17): 149-154.
[2]柳璐, 程浩忠, 马则良, 等. 考虑全寿命周期成本的输电网多目标规划[J]. 中国电机工程学报, 2012, 32(22): 46-54.
LIU Lu, CHENG Haozhong, MA Zeliang, et al. Multi-objective transmission expansion planning considering life cycle cost[J]. Proceedings of the CSEE, 2012,32(22): 46-54.
[3]顾洁, 杜渐, 秦杰, 等. 基于全寿命周期成本的变电站设备检修模糊规划模型[J]. 电力系统自动化, 2014, 38(1): 44-50.
GU Jie, DU Jian, QIN Jie, et al. A fuzzy programming model based on life cycle cost for equipment maintenance in substations[J]. Automation of Electric Power Systems, 2014, 38(1): 44-50.
[4]POLITANO D, FROHLICH K. Calculation of stress-dependent life cycle costs of a substation subsystem-demonstrated for controlled energization of unloaded power transformers[J]. IEEE Transactions on Power Delivery, 2006, 21(4): 2032-2038.
[5]郭峰,文凯,李广福. 输电线路全寿命周期成本设计[J]. 电力建设, 2011, 32(2):29-34.
GUO Feng, WEN Kai, LI Guangfu. Design of life costs for power transmission line[J]. Electric Power Construction, 2011, 32(2): 29-34.
[6]屈刚,程浩忠,马则良,等.考虑联络线传输功率的双层分区多目标输电网规划[J].中国电机工程学报, 2009, 29(31): 40-46.
QU Gang, CHENG Haozhong, MA Zeliang, et al. Bi-level multi-objective transmission planning with consideration of tie-line power transfer capability[J]. Proceedings of the CSEE, 2009, 29(31): 40-46.
[7]范宏, 程浩忠, 金华征, 等.考虑经济性可靠性的输电网二层规划模型及混合算法[J]. 中国电机工程学报, 2008, 28(16): 1-7.
FAN Hong, CHENG Haozhong, JIN Huazheng, et al.Transmission network bi-level programming model considering economy and reliability and hybrid algorithm[J]. Proceedings of the CSEE, 2008, 28(16): 1-7.
[8]苏海峰. 配电系统规划全寿命周期管理理论和方法研究[D]. 北京: 华北电力大学, 2012.
SU Haifeng.Research on the life cycle management theory and method in distribution system planning[D]. Beijing: North China Electric Power University, 2012.
[9]KARLSSON D, WALLIN L, OLOVSSON H E, et al. Reliability and life cycle cost estimates of 400 kV substation layouts[J]. IEEE Transactions on Power Delivery, 1997, 12(4): 1486-1492.
[10]HINOW M, MEVISSEN M. Substation maintenance strategy adaptation for life-cycle cost reduction using genetic algorithm[J]. IEEE Transactions on Power Delivery, 2011, 26(1): 197-204.
[11]ZHOU K J, LI H J, HOU X Z. The application of LCC theory on the watthour meter management[C]// 2006 International Conference on Power System Technology. IEEE, 2006:1-8.
[12]范林涛. 考虑全寿命周期成本的配电网多目标规划研究[D]. 北京: 华北电力大学, 2014.
FAN Lintao. Research on multi-objective distribution network planning considering life cycle cost[D]. Beijing: North China Electric Power University, 2014.
[13]方斯顿, 程浩忠, 徐国栋, 等. 基于非参数核密度估计的扩展准蒙特卡洛随机潮流方法[J]. 电力系统自动化, 2015, 39(7): 21-27.
FANG Sidun, CHENG Haozhong, XU Guodong, et al. An extended quasi Monte Carlo probabilistic load flow method based on non-parametric kernel density estimation[J]. Automation of Electric Power Systems, 2015, 39(7): 21-27.
[14]王凯军,孙飞飞,兰洲, 等. 全寿命周期成本管理在实际电力网络规划中的应用[J]. 电力建设,2016, 37(4):43-49.
WANG Kaijun, SUN Feifei, LAN Zhou, et al. Application of life cycle cost management in network planning of actual power system[J]. Electric Power Construction, 2016, 37(4): 43-49.
[15]李蕊, 李跃, 苏剑, 等. 配电网重要电力用户停电损失及应急策略[J]. 电网技术, 2011, 35(10): 170-176.
LI Rui, LI Yue, SU Jian, et al.Power supply interruption cost of important power consumers in distribution network and its emergency management[J].Power System Technology, 2011, 35(10): 170-176.
[16]言大伟,韦钢, 胡吟, 等. 可靠性与经济性相协调的微电网能量优化[J]. 电力系统自动化, 2012, 36(8): 18-23,51.
YAN Dawei, WEI Gang, HU Yin, et al. Microgrid energy optimization with coordination of reliability and economy[J]. Automation of Electric Power Systems, 2012, 36(8): 18-23,51.
|