Electric Power Construction ›› 2016, Vol. 37 ›› Issue (9): 101-.doi: 10.3969/j.issn.1000-7229.2016.09.014

Previous Articles     Next Articles

Comparison and Selection of Power Grid Planning Based on Life Cycle Cost

LIU Liping1,PENG Bo1,GU Xi2,LIU Sheng2,CHEN Cong2,LIAO Zhiwei2   

  1. 1.Department of Planning and Development, China Southern Power Grid Company Limited, Guangzhou 510000, China; 2.School of Electric Power, South China University of Technology, Guangzhou 510640, China
  • Online:2016-09-01

Abstract: The life cycle cost of power grid assets is a key technology in power system planning to control long-term cost and short term investment. Considering the effects of reliability, economic indicators and different replacement cycleson the cost calculation, this paper proposes a cost calculation model base on LCC for transmission network to compare and select the schemes of smart grid planning. Meanwhile, in combined with the theory of power network reliability analysis and LCC theory, this paper proposes the reliability index calculation and quantitative method based on Monte Carlo model, studies the effect of different load types on reliability cost, and then establishes the LCC cost model of power grid planning with considering the replacement of equipment. Finally, this paper verifies the accuracy and effectiveness of the proposed LCC cost calculation model through an appropriately example of comparing and selecting of two planning schemes for an 110 kV substation.

Key words: life cycle cost (LCC), Monte Carlo model, reliability calculation, power grid planning