[1] |
WANG Liang, GAI Zhengyu, JIANG Weiyong, SHI Yuxin, MENG Qingmeng.
Blocking Strategy for ±800 kV Yan-Huai UHVDC System in Island Operation Mode of Delivering Side
[J]. ELECTRIC POWER CONSTRUCTION, 2020, 41(8): 40-47.
|
[2] |
ZHANG Kai, QIU Xiaoyan, LI Linghao, ZHANG Haoyu, ZHAO Youlin, LIU Mengyi.
Energy Storage Configuration Scheme Considering the Effect of Static Voltage Stability in Wind Power Systems
[J]. Electric Power Construction, 2020, 41(7): 110-116.
|
[3] |
SHEN Baoxing1, LIN Lin1, DONG Qian2, TANG Cong3, JIANG Shouqi2, XIN Yechun2.
Coordinated Control Strategy for AC Fault Ride-through of MMC-HVDC Island Power Supply System
[J]. Electric Power Construction, 2020, 41(6): 93-99.
|
[4] |
YANG Yong, SHE Zhenqiu, SONG Shengli, LI Ming,WANG Jialong,FAN Jichao.
Design Optimization of Converter Valve Thyristor for New Generation of ±800 kV/8 GW UHVDC Project
[J]. Electric Power Construction, 2020, 41(6): 114-122.
|
[5] |
GENG Xiaohong, WEN Jun, TAN Meng, HE Dongshan, WANG Sichao, HAN Minxiao.
Impact of High Cable Rate on Harmonic Transfer Characteristics of Transmission Power Grid at HVDC Receiving-End
[J]. Electric Power Construction, 2020, 41(1): 106-113.
|
[6] |
LIANG Xiurui, LIU Daowei, YANG Hongying, LI Weixing, SHAO Guanghui, XU Xingwei, WANG Kefei, LI Zonghan, ZHAO Gaoshang.
Data-Driven Situation Assessment of Power System Static Voltage Stability
[J]. Electric Power Construction, 2020, 41(1): 126-132.
|
[7] |
ZHENG Chuanning, YU Qun, CAO Na, CHEN Jing.
Emergent Coordinated Control Strategy of Regional Interconnected Grid after Tie-Line Fault Outage
[J]. Electric Power Construction, 2019, 40(7): 76-84.
|
[8] |
HE Hailei, ZHANG Yantao, ZHOU Qinyong, SUN Yujiao, ZHANG Libo,ZHONG Jun.
Transient Safety Risk Assessment Method for Super Large-Scale Power Grid Considering Key Scenarios
[J]. Electric Power Construction, 2019, 40(7): 91-100.
|
[9] |
YU Yiping, ZHAO Jian, XIONG Haoqing, CHEN Qian, JU Ping.
Research on Interactive Simulation Method in PSASP for UHVDC Blocking
[J]. Electric Power Construction, 2019, 40(4): 18-25.
|
[10] |
LIU Qipu, TANG Xiaochen, YANG Jia, SUN Guoqiang, WEI Zhinong.
PI Parameters Optimization Based on Improved Whales Optimization Algorithm for Hybrid High Voltage Direct Current System
[J]. Electric Power Construction, 2019, 40(4): 26-33.
|
[11] |
CHEN Ning, QI Lei, CUI Xiang, MA Jiangjiang.
Calculation Method for Line-to-Ground Short-Circuit Currents of VSC-HVDC Grid
[J]. Electric Power Construction, 2019, 40(4): 119-127.
|
[12] |
CHEN Zhao, YUE Bo, YANG Qiming, LIU Siyuan, LI Qi.
Study on Main Circuit Design of ±1 500 kV UHVDC Transmission System
[J]. Electric Power Construction, 2019, 40(4): 128-134.
|
[13] |
NING Wenyuan1, YANG Xiaonan2, LIU Yinglin3, LIU Yanying3, LUO Guomin3,WANG Xiaojun3.
Research on Protection Method Based on Time-Spectrum for Hybrid HVDC Transmission Line
[J]. Electric Power Construction, 2019, 40(10): 126-132.
|
[14] |
HUANG Haitao,WANG Daifeng,ZHU Fengze,WANG Junwei.
Study on the Control Strategy of Frequency Conversion Air Conditioning Considering Thermal Comfort
[J]. Electric Power Construction, 2018, 39(9): 9-17.
|
[15] |
WU Chengjie, FU Chao, FAN Shixiong.
Control Strategy of Low Voltage Ride Through for Grid-connected PV System Based on Modular Multilevel Converter
[J]. Electric Power Construction, 2018, 39(7): 48-56.
|