• CSCD核心库收录期刊
  • 中文核心期刊
  • 中国科技核心期刊

电力建设 ›› 2020, Vol. 41 ›› Issue (10): 63-70.doi: 10.12204/j.issn.1000-7229.2020.10.007

• 论文 • 上一篇    下一篇

面向有源配电网运行经济性的智能储能软开关规划

王俊丰1, 孔令生1, 范心明1, 彭元泉1, 陈昊2, 宋关羽2   

  1. 1.广东电网有限责任公司佛山供电局,广东省佛山市528000
    2.智能电网教育部重点实验室(天津大学),天津市 300072
  • 收稿日期:2020-03-22 出版日期:2020-10-01 发布日期:2020-09-30
  • 通讯作者: 宋关羽
  • 作者简介:王俊丰(1979)男,硕士,高级工程师,主要研究方向为配网运行管理;|孔令生(1978)男,硕士,高级工程师,主要研究方向为电网规划、配电网设计及运行技术;|范心明(1978)男,博士,高级工程师,主要研究方向为柔性输配电技术;|彭元泉(1982)男,硕士,高级工程师,主要研究方向为配电网运行技术;|陈昊(1994)男,硕士研究生,主要研究方向为智能配电网运行优化与规划;
  • 基金资助:
    广东电网有限责任公司科技项目(GDKJXM20180049)

Optimal Planning for Soft Open Point Integrated with ESS to Improve the Economy of Active Distribution Network

WANG Junfeng1, KONG Lingsheng1, FAN Xinming1, PENG Yuanquan1, CHEN Hao2, SONG Guanyu2   

  1. 1. Foshan Power Supply Bureau, Guangdong Power Grid Co., Ltd., Foshan 528000, Guangdong Province, China
    2. Key Laboratory of Smart Grid of Ministry of Education, Tianjin University, Tianjin 300072, China
  • Received:2020-03-22 Online:2020-10-01 Published:2020-09-30
  • Contact: SONG Guanyu

摘要:

在可再生分布式电源大量接入的背景下,结合智能软开关(soft open point, SOP)的功率调节能力和储能系统(energy storage system, ESS)的电能储存特性,智能储能软开关(SOP integrated with ESS, ESOP)可以从时间与空间2个维度优化有源配电网潮流分布,提升运行经济性。考虑到智能储能软开关物理结构复杂、投资成本较高,因此,在规划阶段应选择合理的换流器与储能电池容量配置方案以提升有源配电网综合效益。首先介绍了智能储能软开关的物理结构与数学模型;其次,以有源配电网年综合费用最小为规划目标,考虑智能储能软开关运行约束以及有源配电网运行约束,建立了提升有源配电网运行经济性的智能储能软开关规划模型;最后采用二阶锥规划算法对上述规划模型进行求解,并以改进的IEEE 33节点测试算例验证了所提规划模型的有效性。结果表明,提出的智能储能软开关规划方法能够有效降低有源配电网综合成本,提升有源配电网的运行经济性。

关键词: 有源配电网, 智能储能软开关, 优化配置, 运行经济性

Abstract:

With the increasing penetration of renewable distributed generators (DGs), combined with the power regulation capabilities of soft open point (SOP) and the characteristics of energy storage system (ESS), SOP integrated with ESS (ESOP) can adjust the power flow and enhance the economy of active distribution networks (ADNs) in spatial and temporal aspects. Considering the complex physical structure and high investment cost of ESOP, reasonable capacity configuration of inverter and energy storage battery should be selected in the planning stage to enhance the comprehensive benefits of the ADNs. Firstly, the structure and mathematical model of ESOP are elaborated in this paper. Secondly, to establish the ESOP planning model of ADNs, the minimum comprehensive cost of the network is taken as the object and the operation constraints of ESOP and ADNs are considered. Finally, the second-order cone-programming algorithm is used to solve the proposed model, and the effectiveness of the proposed planning model is verified by a modified IEEE 33-node test system. The results show that the proposed ESOP planning model can effectively reduce the comprehensive cost and improve the economy of ADNs.

Key words: active distribution network, soft open point integrated with energy storage system, optimal configuration, operation economy

中图分类号: