高压直流换流变压器有载分接开关控制优化

郭贤珊1, 李凤祁2, 阮思烨1, 张俊1, 刘心旸2   

  1. 1.国家电网有限公司,北京市 100031
    2.国家电网有限公司直流技术中心,北京市100052
  • 收稿日期:2020-07-22 出版日期:2021-02-01 发布日期:2021-02-09
  • 通讯作者: 刘心旸
  • 作者简介:郭贤珊(1972),男,硕士,教授级高级工程师,主要从事特高压直流工程建设和生产管理方面的工作;|李凤祁(1972),男,硕士,高级工程师,主要从事高压直流输电系统控制保护方面的研究工作;|阮思烨(1982),男,博士,高级工程师,主要从事直流输电系统保护方面的研究工作;|张俊(1987),男,学士,高级工程师,主要从事直流输电系统运维检修管理方面的工作。
  • 基金资助:
    国家电网公司科技项目(SGCC[2020]49355A)

Optimization on Control Strategy of Tap Changer in HVDC Converter Transformer

GUO Xianshan1, LI Fengqi2, RUAN Siye1, ZHANG Jun1, LIU Xinyang2   

  1. 1. State Grid Corporation of China, Beijing 100031, China
    2. DC Technology Center of State Grid Corporation of China, Beijing 100052, China
  • Received:2020-07-22 Online:2021-02-01 Published:2021-02-09
  • Contact: LIU Xinyang
  • Supported by:
    Science and Technology Program of SGCC(SGCC[2020]49355A)

摘要:

换流变压器有载分接开关是高压直流输电系统实现电压、功率调节功能的重要设备。针对近年来换流变压器有载分接开关在档位调节过程中相继发生爆炸起火等严重故障,有必要研究避免有载分接开关不必要动作的措施,降低分接开关故障风险。梳理并分析了不同类型直流换流站的有载分接开关控制策略,揭示了部分在运换流站档位频繁调节的原因;在此基础上,从运行方式、控制参数及控制策略三方面开展研究,提出三类降低动作次数的措施,并基于实时数字仿真平台搭建仿真模型,对各类措施在降低有载分接开关动作次数方面的效果进行了仿真比较。最后,通过工程调试及运行情况进一步验证了这些措施的可行性,并对各类措施的优缺点及适用条件进行了讨论。

关键词: 高压直流输电系统, 有载分接开关, 频繁调节, 控制策略, 实时数字仿真(RTDS)

Abstract:

The on-load tap changer is important equipment to realize voltage and power regulation in HVDC system. In recent years, several serious faults arose during on-load tap changer adjustment process. To reduce the risk of tap changer failure, it is necessary to study the measures to avoid unnecessary adjustment of the tap changer. The control strategies of on-load tap changer of different types of HVDC converter stations are analyzed in this paper, and the reasons for the unnecessary continual adjustment of tap changer in some stations are revealed. On that basis, research on the optimizing of the operation mode, control parameters and control strategy is carried out, and three kinds of measures to reduce the adjustment times of the on-load tap changers are presented. Simulation models are set up to compare the effect of these measures. Finally, the feasibility of these measures is further verified by both simulation and site operation experience, the relative merits and application conditions for the suggested measures are also discussed.

Key words: HVDC system, on-load tap changer, continual adjustment, control strategy, real time digital simulation (RTDS)