• CSCD核心库收录期刊
  • 中文核心期刊
  • 中国科技核心期刊

电力建设 ›› 2021, Vol. 42 ›› Issue (12): 9-20.doi: 10.12204/j.issn.1000-7229.2021.12.002

• 综合多元能源及信息技术的能源互联网规划与运行·栏目主持 刘洋副教授、韩富佳博士· • 上一篇    下一篇

计及需求响应不确定性的园区综合能源系统日前经济优化调度

林文智1(), 杨苹1,2(), 陈芯羽1(), 左冠林1()   

  1. 1.华南理工大学电力学院,广州市 510640
    2.广东省绿色能源技术重点实验室(华南理工大学),广州市 510630
  • 收稿日期:2021-06-01 出版日期:2021-12-01 发布日期:2021-11-26
  • 通讯作者: 林文智 E-mail:931490882@qq.com;eppyang@scut.edu.cn;645822589@qq.com;473952955@qq.com
  • 作者简介:杨苹(1967),女,博士,教授,博士生导师,主要研究方向为可再生能源并网和微电网技术,E-mail: eppyang@scut.edu.cn;
    陈芯羽(1997),女,硕士研究生,主要研究方向为综合能源系统经济优化调度,E-mail: 645822589@qq.com;
    左冠林(1997),男,硕士研究生,主要研究方向为新能源并网发电与微网技术、综合能源系统,E-mail: 473952955@qq.com
  • 基金资助:
    南方电网数字电网研究院有限公司科技项目(YTYZW20010)

Day-ahead Optimal Economic Dispatch of Park Integrated Energy System Considering Uncertainty of Demand Response

LIN Wenzhi1(), YANG Ping1,2(), CHEN Xinyu1(), ZUO Guanlin1()   

  1. 1. School of Electric Power Engineering, South China University of Technology, Guangzhou 510640, China
    2. Guangdong Key Laboratory of Clean Energy Technology (South China University of Technology), Guangzhou 510630, China
  • Received:2021-06-01 Online:2021-12-01 Published:2021-11-26
  • Contact: LIN Wenzhi E-mail:931490882@qq.com;eppyang@scut.edu.cn;645822589@qq.com;473952955@qq.com
  • Supported by:
    Research Project of Digital Grid Research Institute,China Southern Power Grid(YTYZW20010)

摘要:

园区综合能源系统(park integrated energy system,PIES)通过多能互补可显著提升其运行经济性,然而园区可控资源响应的不确定性会给日前调度策略的制定带来挑战,为此提出了一种考虑综合需求响应及其不确定性的园区综合能源系统日前经济优化调度策略。文章首先运用三角模糊数描述光伏、负荷预测功率以及柔性负荷响应量的不确定性,建立计及不确定性的日前调度模型;然后以系统总运行成本最小为目标,对系统供需两侧可控资源进行协同优化,并根据模糊规划理论,将模糊期望约束和模糊机会约束等效转换为确定性约束形式便于求解;最后通过算例验证了所提策略通过综合需求响应可有效降低系统运行成本,并分析了模糊机会约束置信水平对系统运行成本的影响。

关键词: 园区综合能源系统(PIES), 日前优化调度, 综合需求响应, 不确定性, 模糊规划理论

Abstract:

The park integrated energy system can significantly improve its operation economy through multi-energy complementary. However, the uncertainty of the controllable resource response will bring challenges to the formulation of the day-ahead dispatching strategy. Thus, a day-ahead optimal economic dispatching strategy considering the integrated demand response and its uncertainty is proposed for the park integrated energy system. Firstly, the uncertainty of photovoltaic and load forecast power and the uncertainty of flexible load response are described by triangular fuzzy number, and a day-ahead dispatching model considering uncertainty is established. Then, in order to minimize the total operation cost of the system, the controllable resources of the supply and demand sides of the system are optimized. According to the fuzzy scheduling theory, fuzzy expectation constraints and fuzzy chance constraints are equivalently converted into their certainty forms for easy solution. Finally, the case analysis shows that the proposed strategy can further reduce the operating cost through integrated demand response; and the impact of fuzzy chance constraint confidence level on the system operating cost is analyzed.

Key words: park integrated energy system (PIES), day-ahead optimal dispatch, integrated demand response, uncertainty, fuzzy scheduling theory

中图分类号: