[1] |
黄彦彰, 周宇昊, 郑文广, 等. 产业园区新型多能联供综合能源服务研究[J]. 发电技术, 2021, 42(6): 734-740.
doi: 10.12096/j.2096-4528.pgt.21099
|
|
HUANG Yanzhang, ZHOU Yuhao, ZHENG Wenguang, et al. Research on new integrated energy system with multi-power combined supply of industrial parks[J]. Power Generation Technology, 2021, 42(6): 734-740.
doi: 10.12096/j.2096-4528.pgt.21099
|
[2] |
王凌云, 徐健哲, 李世春, 等. 考虑电-气-热需求响应和阶梯式碳交易的综合能源系统低碳经济调度[J]. 智慧电力, 2022, 50(9): 45-52.
|
|
WANG Lingyun, XU Jianzhe, LI Shichun, et al. Low carbon economic dispatch of integrated energy system considering electricity-gas-heat demand response and tiered carbon trading[J]. Smart Power, 2022, 50(9): 45-52.
|
[3] |
孙强, 谢典, 聂青云, 等. 含电-热-冷-气负荷的园区综合能源系统经济优化调度研究[J]. 中国电力, 2020, 53(4): 79-88.
|
|
SUN Qiang, XIE Dian, NIE Qingyun, et al. Research on economic optimization scheduling of park integrated energy system with electricity-heat-cool-gas load[J]. Electric Power, 2020, 53(4): 79-88.
|
[4] |
杨莘博, 谭忠富, 林宏宇, 等. 计及合作联盟的园区综合能源系统随机优化及收益分配模型[J]. 电力系统自动化, 2020, 44(19): 36-46.
|
|
YANG Shenbo, TAN Zhongfu, LIN Hongyu, et al. Stochastic optimization and income allocation model for park integrated energy system considering cooperation alliance[J]. Automation of Electric Power Systems, 2020, 44(19): 36-46.
|
[5] |
刘新元, 程雪婷, 薄利明, 等. 考虑源荷协调的含储热光热电站和风电系统的日前-日内调度策略[J]. 中国电力, 2021, 54(8): 144-153.
|
|
LIU Xinyuan, CHENG Xueting, BO Liming, et al. Day-ahead and intra-day scheduling strategy of concentrated solar power station with thermal energy storage and wind farm considering coordination between generation and load[J]. Electric Power, 2021, 54(8): 144-153.
|
[6] |
THORIN E, BRAND H, WEBER C. Long-term optimization of cogeneration systems in a competitive market environment[J]. Applied Energy, 2005, 81(2): 152-169.
doi: 10.1016/j.apenergy.2004.04.012
URL
|
[7] |
ZHOU Y F, HU W, MIN Y, et al. Integrated power and heat dispatch considering available reserve of combined heat and power units[J]. IEEE Transactions on Sustainable Energy, 2019, 10(3): 1300-1310.
doi: 10.1109/TSTE.2018.2865562
URL
|
[8] |
LIU F, BIE Z H, WANG X. Day-ahead dispatch of integrated electricity and natural gas system considering reserve scheduling and renewable uncertainties[J]. IEEE Transactions on Sustainable Energy, 2019, 10(2): 646-658.
doi: 10.1109/TSTE.2018.2843121
URL
|
[9] |
CHEN S, WEI Z N, SUN G Q, et al. Adaptive robust day-ahead dispatch for urban energy systems[J]. IEEE Transactions on Industrial Electronics, 2019, 66(2): 1379-1390.
doi: 10.1109/TIE.2017.2787605
URL
|
[10] |
李志鹏, 王建喜, 周洪伟, 等. 计及多指标间相互影响的园区综合能源系统规划评价方法[J]. 电力建设, 2022, 43(10):98-110.
doi: 10.12204/j.issn.1000-7229.2022.10.010
|
|
LI Zhipeng, WANG Jianxi, ZHOU Hongwei, et al. Evaluation method for park-level integrated energy system planning considering the interaction of multiple indices[J]. Electric Power Construction, 2022, 43 (10):98-110.
doi: 10.12204/j.issn.1000-7229.2022.10.010
|
[11] |
郭尊, 李庚银, 周明, 等. 考虑网络约束和源荷不确定性的区域综合能源系统两阶段鲁棒优化调度[J]. 电网技术, 2019, 43(9): 3090-3100.
|
|
GUO Zun, LI Gengyin, ZHOU Ming, et al. Two-stage robust optimal scheduling of regional integrated energy system considering network constraints and uncertainties in source and load[J]. Power System Technology, 2019, 43(9): 3090-3100.
|
[12] |
李笑竹, 王维庆. 区域综合能源系统两阶段鲁棒博弈优化调度[J]. 浙江大学学报(工学版), 2021, 55(1): 177-188.
|
|
LI Xiaozhu, WANG Weiqing. Bi-level robust game optimal scheduling of regional comprehensive energy system[J]. Journal of Zhejiang University (Engineering Science), 2021, 55(1): 177-188.
|
[13] |
税月, 刘俊勇, 高红均, 等. 考虑风电不确定性的电气能源系统两阶段分布鲁棒协同调度[J]. 电力系统自动化, 2018, 42(13): 43-50.
|
|
SHUI Yue, LIU Junyong, GAO Hongjun, et al. Two-stage distributed robust cooperative dispatch for integrated electricity and natural gas energy systems considering uncertainty of wind power[J]. Automation of Electric Power Systems, 2018, 42(13): 43-50.
|
[14] |
倪伟, 吕林, 向月, 等. 基于机会约束规划的能源集线器系统气电购置优化建模[J]. 电网技术, 2018, 42(8): 2477-2487.
|
|
NI Wei, LÜ Lin, XIANG Yue, et al. Optimal gas-electricity purchase model for energy hub system based on chance-constrained programming[J]. Power System Technology, 2018, 42(8): 2477-2487.
|
[15] |
吴刚, 刘俊勇, 向月, 等. 计及中长期合同电量分解和风电不确定性的电-气综合能源系统日前优化调度[J]. 电力自动化设备, 2019, 39(8): 246-253.
|
|
WU Gang, LIU Junyong, XIANG Yue, et al. Day-ahead optimal scheduling of integrated electricity and natural gas system with medium-and long-term electricity contract decomposition and wind power uncertainties[J]. Electric Power Automation Equipment, 2019, 39(8): 246-253.
|
[16] |
蒋万枭, 刘继春, 韩晓言, 等. 离网条件下考虑短时间尺度的水光蓄多能互补发电系统备用容量确定方法[J]. 电网技术, 2020, 44(7): 2492-2502.
|
|
JIANG Wanxiao, LIU Jichun, HAN Xiaoyan, et al. Reserve optimization for offline multi-energy complementary generation system in short time scale[J]. Power System Technology, 2020, 44(7): 2492-2502.
|
[17] |
WU G, XIANG Y, LIU J Y, et al. Decentralized day-ahead scheduling of multi-area integrated electricity and natural gas systems considering reserve optimization[J]. Energy, 2020, 198: 117271.
doi: 10.1016/j.energy.2020.117271
URL
|
[18] |
康重庆, 夏清, 徐玮. 电力系统不确定性分析[M]. 北京: 科学出版社, 2011.
|
[19] |
李志伟, 赵书强, 刘金山. 基于相关机会目标规划的电力系统优化调度研究[J]. 中国电机工程学报, 2019, 39(10): 2803-2816.
|
|
LI Zhiwei, ZHAO Shuqiang, LIU Jinshan. Optimal scheduling of power system based on dependent-chance goal programming[J]. Proceedings of the CSEE, 2019, 39(10): 2803-2816.
|
[20] |
李志伟, 赵书强, 李东旭, 等. 基于改进ε-约束与采样确定性转化的电力系统日前调度机会约束模型快速求解技术[J]. 中国电机工程学报, 2018, 38(16): 4679-4691.
|
|
LI Zhiwei, ZHAO Shuqiang, LI Dongxu, et al. Fast solving of day-ahead power system scheduling chance-constrained model based on improved ε-constrained and deterministic transform by sampling[J]. Proceedings of the CSEE, 2018, 38(16): 4679-4691.
|