[1] |
国家能源局. 我国可再生能源发电累计装机容量突破10亿千瓦[EB/OL].[2022-02-06]. http://www.nea.gov.cn/2021-11/20/c_1310323021.htm.
|
[2] |
张高, 薛松, 范孟华, 等. 面向我国电力市场的需求响应市场化交易机制设计[J]. 电力建设, 2021, 42(4): 132-140.
doi: 10.12204/j.issn.1000-7229.2021.04.015
|
|
ZHANG Gao, XUE Song, FAN Menghua, et al. Design of demand-response market mechanism in accordance with China power market[J]. Electric Power Construction, 2021, 42(4): 132-140.
doi: 10.12204/j.issn.1000-7229.2021.04.015
|
[3] |
和萍, 宫智杰, 靳浩然, 等. 高比例可再生能源电力系统调峰问题综述[J]. 电力建设, 2022, 43(11): 108-121.
doi: 10.12204/j.issn.1000-7229.2022.11.011
|
|
HE Ping, GONG Zhijie, JIN Haoran, et al. Review of peak-shaving problem of electric power system with high proportion of renewable energy[J]. Electric Power Construction, 2022, 43(11): 108-121.
doi: 10.12204/j.issn.1000-7229.2022.11.011
|
[4] |
薛晨, 任景, 张小东, 等. 含虚拟储能的新能源高渗透电网深度调峰备用决策模型[J]. 中国电力, 2019, 52(11): 35-43.
|
|
XUE Chen, REN Jing, ZHANG Xiaodong, et al. A reserve decision model for high-proportional renew energy integrated power grid based on deep peak-shaving and virtual storage[J]. Electric Power, 2019, 52(11): 35-43.
|
[5] |
邓婷婷, 娄素华, 田旭, 等. 计及需求响应与火电深度调峰的含风电系统优化调度[J]. 电力系统自动化, 2019, 43(15): 34-41.
|
|
DENG Tingting, LOU Suhua, TIAN Xu, et al. Optimal dispatch of power system integrated with wind power considering demand response and deep peak regulation of thermal power units[J]. Automation of Electric Power Systems, 2019, 43(15): 34-41.
|
[6] |
李嘉龙, 陈雨果, 刘思捷, 等. 考虑深度调峰的电力日前市场机制设计[J]. 电力系统自动化, 2019, 43(4): 9-15.
|
|
LI Jialong, CHEN Yuguo, LIU Sijie, et al. Mechanism design of day-ahead market considering deep peak regulation[J]. Automation of Electric Power Systems, 2019, 43(4): 9-15.
|
[7] |
段秦刚, 陈永椿, 王一, 等. 电力现货市场下激励型需求响应交易机制及出清模型[J]. 电力建设, 2021, 42(6): 145-156.
doi: 10.12204/j.issn.1000-7229.2021.06.015
|
|
DUAN Qingang, CHEN Yongchun, WANG Yi, et al. Trading mechanism and clearing model of incentive demand response in electricity spot market[J]. Electric Power Construction, 2021, 42(6): 145-156.
doi: 10.12204/j.issn.1000-7229.2021.06.015
|
[8] |
周竞, 耿建, 唐律, 等. 可调节负荷资源参与电力辅助服务市场规则分析与思考[J]. 电力自动化设备, 2022, 42(7): 120-127.
|
|
ZHOU Jing, GENG Jian, TANG Lü, et al. Rule analysis and cogitation for adjustable load resources participating in ancillary service market[J]. Electric Power Automation Equipment, 2022, 42(7): 120-127.
|
[9] |
马晓伟, 薛晨, 任景, 等. 西北省间调峰辅助服务市场机制设计与实践[J]. 中国电力, 2021, 54(6): 2-11.
|
|
MA Xiaowei, XUE Chen, REN Jing, et al. Design and practice of inter-provincial peak regulation auxiliary service market mechanism for northwest China power grid[J]. Electric Power, 2021, 54(6): 2-11.
|
[10] |
王鹏, 任冲, 李信, 等. 西北电网调峰市场与电能量市场耦合运作模式探讨[J]. 南方电网技术, 2021, 15(2): 64-73.
|
|
WANG Peng, REN Chong, LI Xin, et al. Discussion on coupling operation mode of peaking market and electric energy market in northwest power grid[J]. Southern Power System Technology, 2021, 15(2): 64-73.
|
[11] |
邹鹏, 丁强, 任远, 等. 山西省融合调峰辅助服务的电力现货市场建设路径演化探析[J]. 电网技术, 2022, 46(4): 1279-1288.
|
|
ZOU Peng, DING Qiang, REN Yuan, et al. Analysis on construction path evolution of electricity spot market integrating load and renewables following ancillary services in Shanxi Province[J]. Power System Technology, 2022, 46(4): 1279-1288.
|
[12] |
陈哲. 含高比例风电的电力系统备用优化与分布式调度研究[D]. 杭州: 浙江大学, 2021.
|
|
CHEN Zhe. Reserve optimization and distributed dispatch for power systems with a high share of wind power[D]. Hangzhou: Zhejiang University, 2021.
|
[13] |
胡俊杰, 李阳, 吴界辰, 等. 基于配网节点电价的产消者日前优化调度[J]. 电网技术, 2019, 43(8): 2770-2780.
|
|
HU Junjie, LI Yang, WU Jiechen, et al. A day-ahead optimization scheduling method for prosumer based on iterative distribution locational marginal price[J]. Power System Technology, 2019, 43(8): 2770-2780.
|
[14] |
TANG Z, LIU Y K, WU L, et al. Reserve model of energy storage in day-ahead joint energy and reserve markets: a stochastic UC solution[J]. IEEE Transactions on Smart Grid, 2021, 12(1): 372-382.
doi: 10.1109/TSG.2020.3009114
URL
|
[15] |
TANG Z, LIU J, ZENG P L, et al. A multi-timescale operation model for hybrid energy storage system in electricity markets[J]. International Journal of Electrical Power & Energy Systems, 2022, 138: 107907.
doi: 10.1016/j.ijepes.2021.107907
URL
|
[16] |
GUO G, HACKEBEIL G, RYAN S M, et al. Integration of progressive hedging and dual decomposition in stochastic integer programs[J]. Operations Research Letters, 2015, 43(3): 311-316.
doi: 10.1016/j.orl.2015.03.008
URL
|
[17] |
LIU H Z, SHEN X W, GUO Q L, et al. Application of modified progressive hedging for stochastic unit commitment in electricity-gas coupled systems[J]. CSEE Journal of Power and Energy Systems, 2021, 7(4): 840-849.
|
[18] |
MARÍN-CANO C C, SIERRA-AGUILAR J E, LÓPEZ-LEZAMA J M, et al. A novel strategy to reduce computational burden of the stochastic security constrained unit commitment problem[J]. Energies, 2020, 13(15): 3777.
doi: 10.3390/en13153777
URL
|
[19] |
WU L, SHAHIDEHPOUR M, LI T. Cost of reliability analysis based on stochastic unit commitment[J]. IEEE Transactions on Power Systems, 2008, 23(3): 1364-1374.
doi: 10.1109/TPWRS.2008.922231
URL
|
[20] |
LIU T J, LIU Y B, LIU J Y, et al. A Bayesian learning based scheme for online dynamic security assessment and preventive control[J]. IEEE Transactions on Power Systems, 2020, 35(5): 4088-4099.
doi: 10.1109/TPWRS.2020.2983477
URL
|
[21] |
TANG Z, LIU Y B, LIU J Y, et al. Multi-stage sizing approach for development of utility-scale BESS considering dynamic growth of distributed photovoltaic connection[J]. Journal of Modern Power Systems and Clean Energy, 2016, 4(4): 554-565.
doi: 10.1007/s40565-016-0242-3
URL
|