考虑源-荷匹配偏差的直流外送系统多时间尺度分层优化调度方法

王鹤, 李泽仁, 于华楠, 边竞, 李石强

电力建设 ›› 2026, Vol. 47 ›› Issue (1) : 63-78.

PDF(2569 KB)
PDF(2569 KB)
电力建设 ›› 2026, Vol. 47 ›› Issue (1) : 63-78. DOI: 10.12204/j.issn.1000-7229.2026.01.006
规划建设

考虑源-荷匹配偏差的直流外送系统多时间尺度分层优化调度方法

作者信息 +

Multi-Time-Scale Hierarchical Optimization Scheduling Method for DC Power Transmission Systems Considering Source-Load Matching Deviation

Author information +
文章历史 +

摘要

【目的】为提高大规模风光跨区跨省消纳的经济性,提出一种考虑源-荷匹配偏差的直流外送系统多时间尺度分层优化调度方法。【方法】提出了考虑源-荷匹配偏差的用户电价修正方法,建立了基于Logistic函数模糊响应机理的负荷需求响应模型,通过动态电价得到响应后的用户负荷和输送电价。在日前时间尺度下,通过送受端联络线输送电价表示不同时段送受端输送、接受电量意愿,并提出了考虑输送意愿成本的日前优化调度模型。在日内时间尺度下,提出一种结合模糊参数与t location-scale分布的风光随机分量描述方法,将其与日前调度结果作为输入,结合直流功率调整策略构建日内跨区跨省分层优化调度模型。【结果】算例验证表明:所提源-荷匹配偏差动态修正用户电价方法可量化供需偏差,并通过Logistic函数模糊响应机理的负荷需求响应模型引导负荷主动追踪新能源发电曲线;考虑输送意愿成本的调度模型能优化区域间风光资源配置,降低火电机组出力波动并提升系统经济性;日内分层优化模型通过动态调整调度方式,在避免局部过度调整的同时使计算时间降低了22.82 s,实现了经济性与运行效率的协同优化。【结论】所提考虑源-荷匹配偏差的直流外送系统多时间尺度分层优化调度方法可显著提升高比例新能源接入直流外送系统的风光消纳能力,在缩短调度计算时长的同时有效降低系统运行经济成本。

Abstract

[Objective] To enhance the economic efficiency of large-scale cross-regional and cross-provincial wind and solar power absorption,a multi-time-scale hierarchical optimization scheduling method for DC power transmission systems considering the source-load matching deviation is proposed. [Methods] A user electricity price correction method considering the source-load matching deviation is proposed. A load demand response model based on the Logistic function fuzzy response mechanism is established. The response-induced user load and transmission electricity price are obtained through dynamic electricity prices. In the day-ahead time scale,the transmission and receiving electricity willingness at the sending and receiving ends at different times is represented by the transmission and receiving electricity prices at the sending and receiving ends through the interconnection line,and a day-ahead optimization scheduling model considering the transmission willingness cost is proposed. In the intraday time scale,a wind and solar random component description method combining fuzzy parameters and t-location-scale distribution is proposed. It is combined with the day-ahead scheduling results as the input,and an intraday cross-regional and cross-provincial hierarchical optimization scheduling model is constructed based on the DC power adjustment strategy. [Conclusions] The case study verifies that the proposed dynamic correction method of user electricity price considering the source-load matching deviation can quantify the supply-demand deviation,and guide the load to actively track the curve of new energy power generation through the load demand response model based on the Logistic function fuzzy response mechanism; the scheduling model considering the transmission willingness cost can optimize the regional wind and solar resource allocation,reduce the output fluctuation of thermal power units and improve the system economic efficiency; the intraday hierarchical optimization model adjusts the scheduling mode dynamically,avoids local excessive adjustment,and improves the calculation efficiency by 22.82 seconds while achieving the coordinated optimization of economic efficiency and operational efficiency. [Conclusions] The proposed multi-time-scale hierarchical optimization scheduling method for DC power transmission systems considering source-load matching deviation can significantly enhance the wind and solar power absorption capacity when high penetrations of new energy are integrated into DC power transmission systems. It can not only shorten the scheduling calculation time but also effectively reduce the operational economic cost of the system.

关键词

源-荷匹配偏差 / 多时间尺度 / 分层优化 / 直流功率调整 / 跨省调度模型

Key words

source-load matching deviation / multi-time-scale / hierarchical optimization / DC power adjustment / cross-provincial scheduling model

引用本文

导出引用
王鹤, 李泽仁, 于华楠, . 考虑源-荷匹配偏差的直流外送系统多时间尺度分层优化调度方法[J]. 电力建设. 2026, 47(1): 63-78 https://doi.org/10.12204/j.issn.1000-7229.2026.01.006
WANG He, LI Zeren, YU Hua’nan, et al. Multi-Time-Scale Hierarchical Optimization Scheduling Method for DC Power Transmission Systems Considering Source-Load Matching Deviation[J]. Electric Power Construction. 2026, 47(1): 63-78 https://doi.org/10.12204/j.issn.1000-7229.2026.01.006
中图分类号: TM73   

参考文献

[1]
安之, 邢栋, 贾鸿屹, 等. 考虑直流外送匹配受端负荷和频率安全约束的梯级水光蓄系统中长期优化调度[J]. 电力建设, 2025, 46(9): 144-158.
AN Zhi, XING Dong, JIA Hongyi, et al. Mid-long term optimal scheduling of cascade hydro-photovoltaic-storage system considering matching DC transmission with receiving-end load and frequency safety constraints[J]. Electric Power Construction, 2025, 46(9): 144-158.
[2]
张振宇, 王文倬, 王智伟, 等. 跨区直流外送模式对新能源消纳的影响分析及应用[J]. 电力系统自动化, 2019, 43(11): 174-180.
ZHANG Zhenyu, WANG Wenzhuo, WANG Zhiwei, et al. Impact analysis and application of cross-region HVDC delivery mode in renewable energy accommodation[J]. Automation of Electric Power Systems, 2019, 43(11): 174-180.
[3]
YI B W, XU J H, FAN Y. Inter-regional power grid planning up to 2030 in China considering renewable energy development and regional pollutant control: a multi-region bottom-up optimization model[J]. Applied Energy, 2016, 184: 641-658.
[4]
FENG Z K, NIU W J, CHENG C T. Optimal allocation of hydropower and hybrid electricity injected from inter-regional transmission lines among multiple receiving-end power grids in China[J]. Energy, 2018, 162: 444-452.
[5]
李欣, 汪菁菁, 赵张飞, 等. 计及直流等效储能效应的“风-光-水-储”一体化调度[J]. 电力系统及其自动化学报, 2025, 37(9): 82-90.
LI Xin, WANG Jingjing, ZHAO Zhangfei, et al. Integrated dispatching of wind-PV-hydro-storage considering equivalent energy storage effect of UHVDC transmission[J]. Proceedings of the CSU-EPSA, 2025, 37(9): 82-90.
[6]
陈艳波, 王德帅, 田昊欣, 等. 基于源荷储协调运行的电网可用输电能力优化方法[J]. 电力系统保护与控制, 2024, 52(23): 119-134.
CHEN Yanbo, WANG Deshuai, TIAN Haoxin, et al. An optimal method for the available transfer capability of a power grid based on coordinated operation of source-load-storage[J]. Power System Protection and Control, 2024, 52(23): 119-134.
[7]
YANG Z, WANG H Y, LIAO W L, et al. Protection challenges and solutions for AC systems with renewable energy sources: a review[J]. Protection and Control of Modern Power Systems, 2025, 10(1): 18-39.
[8]
史昭娣, 朱宁, 李政, 等. 计及源-荷匹配的多区域多类型新能源系统优化规划方法[J]. 电力工程技术, 2024, 43(4): 67-76.
SHI Zhaodi, ZHU Ning, LI Zheng, et al. Optimization planning method of multi-region and multi-type renewable energy generation considering source-load matching[J]. Electric Power Engineering Technology, 2024, 43(4): 67-76.
[9]
ZHAO J Q, ZHANG Y K, LIU Z W, et al. Distributed multi-objective day-ahead generation and HVDC transmission joint scheduling for two-area HVDC-linked power grids[J]. International Journal of Electrical Power & Energy Systems, 2022, 134: 107445.
[10]
YU D, GAO S, HAN H T, et al. Intraday two-stage hierarchical optimal scheduling model for multiarea AC/DC systems with wind power integration[J]. Applied Energy, 2024, 364: 123079.
[11]
CHEN X, LOU S H, LIANG Y J, et al. Optimal scheduling of a regional power system aiming at accommodating clean energy[J]. Sustainability, 2021, 13(4): 2169.
The regional power system is an essential mechanism to solve the unbalanced distribution of resources and achieve more efficient resource allocation. In this paper, an optimal scheduling model of the regional power system is developed, to maximize social welfare and minimize clean energy electricity curtailment. This model can realize the optimal allocation of power generation resources and the maximum accommodation of multiple types of clean energy, by minimizing the sum of the electricity purchase cost and the dynamic penalty cost of clean energy. Meanwhile, it considers the modeling of the key AC/DC hybrid tie-line in the regional power grid. To this end, the modeling methods of power transmitted by AC/DC tie-line, the net loss of the tie-line, the stair-like operation of the DC tie-line power, the operation constraints of the DC tie-line are proposed. Then a simulation example study is conducted to verify the effectiveness of the model, which proves that the regional power system can stimulate the resource optimization potential better than the provincial power system.
[12]
王斌, 夏叶, 夏清, 等. 直流跨区互联电网发输电计划模型与方法[J]. 电力系统自动化, 2016, 40(3): 8-13, 26.
WANG Bin, XIA Ye, XIA Qing, et al. Model and methods of generation and transmission scheduling of inter-regional power grid via HVDC tie-line[J]. Automation of Electric Power Systems, 2016, 40(3): 8-13, 26.
[13]
徐帆, 丁恰, 韩红卫, 等. 促进跨区新能源消纳的直流联络线功率优化模型及分析[J]. 电力系统自动化, 2017, 41(18): 152-159.
XU Fan, DING Qia, HAN Hongwei, et al. Power optimization model and analysis of HVDC tie-line for promoting integration of inter-regional renewable energy accommodation[J]. Automation of Electric Power Systems, 2017, 41(18): 152-159.
[14]
WU Y, WANYAN X X, SU X Y, et al. A safety check method to maximize the effective reserve by optimizing the power of the tie-line in the power market[J]. Frontiers in Energy Research, 2023, 11: 1162122.
To ensure the stability of the electricity spot market and the safety of the provincial and regional power systems, a safety check method is proposed to maximize the effective reserve resources in the power system by optimizing the power of each tie-line. This safety check method accurately models the tie-line equipment and the effective reserve resources and is coupled with each constraint of the electricity spot market clearing model to form a safety check algorithm to optimize the power of tie-line power. The model involved in this paper is a linear model, which has a clear implementation method in practical dispatching applications. Through this method, the power configuration scheme of each tie-line to meet the electricity spot market constraints can be obtained, and the safety check results have the executability of the power market. The rationality and feasibility of the safety check algorithm results are verified by simulating the provincial-scale electricity spot market. According to the simulation results, this method can release effective reserve resources and provide more guarantees for the safe operation of the power grid. In addition, this method can save up to 4.9% of the total operation cost of the power system and improve the dispatching economy of the power system. This method is of great significance to ensure the safe operation of the power system and the day-ahead market and real-time market scheduling in the actual power spot system. In addition, this method also has great guiding significance for the analysis of the actual reserve situation of the power market after the event.
[15]
沙韵, 周明, 杨宏基, 等. 考虑光热电站和直流联络线灵活性的高比例新能源互联系统优化运行[J]. 电网技术, 2020, 44(9): 3306-3313.
SHA Yun, ZHOU Ming, YANG Hongji, et al. Interconnected power system optimal operation with renewable generation considering flexibility of concentrating solar power plants & HVDC tie-line[J]. Power System Technology, 2020, 44(9): 3306-3313.
[16]
易忠山, 李凤婷, 尹纯亚, 等. 直流闭锁下的多馈出直流外送系统无功分布与暂态过电压计算方法[J]. 电网与清洁能源, 2024, 40(12): 10-17.
YI Zhongshan, LI Fengting, YIN Chunya, et al. Reactive power distribution and transient overvoltage calculation method for the multi-outfeed DC system under DC blocking[J]. Power System and Clean Energy, 2024, 40(12): 10-17.
[17]
许丹, 梁访, 黄国栋, 等. 考虑多级调度的跨省区大电网安全约束经济调度模型[J]. 电力系统自动化, 2019, 43(22): 94-100.
XU Dan, LIANG Fang, HUANG Guodong, et al. Security constrained economic dispatch model of inter-provincial power grid considering multi-level dispatch[J]. Automation of Electric Power Systems, 2019, 43(22): 94-100.
[18]
HOU J M, YU W J, XU Z H, et al. Multi-time scale optimization scheduling of microgrid considering source and load uncertainty[J]. Electric Power Systems Research, 2023, 216: 109037.
[19]
钟海旺, 夏清, 丁茂生, 等. 以直流联络线运行方式优化提升新能源消纳能力的新模式[J]. 电力系统自动化, 2015, 39(3): 36-42.
ZHONG Haiwang, XIA Qing, DING Maosheng, et al. A new mode of HVDC tie-line operation optimization for maximizing renewable energy accommodation[J]. Automation of Electric Power Systems, 2015, 39(3): 36-42.
[20]
李春山, 任普春, 吴姜. 扎鲁特直流对吉林省风电消纳影响研究[J]. 东北电力大学学报, 2018, 38(6): 1-8.
LI Chunshan, REN Puchun, WU Jiang. The study on the impact of wind power consumption in Jilin Province from Zhalute DC[J]. Journal of Northeast Electric Power University, 2018, 38(6): 1-8.
[21]
李晖, 刘栋, 秦继朔, 等. 考虑风光出力不确定性的新能源基地直流外送随机规划方法研究[J]. 电网技术, 2024, 48(7): 2795-2803.
LI Hui, LIU Dong, QIN Jishuo, et al. Stochastic planning method for UHVDC transmission of renewable energy power base considering wind and photovoltaic output uncertainties[J]. Power System Technology, 2024, 48(7): 2795-2803.
[22]
吕凯, 唐昊, 王珂, 等. 计及源荷双侧不确定性的跨区互联电网源网荷协同调度[J]. 电力系统自动化, 2019, 43(22): 38-45, 150.
LYU Kai, TANG Hao, WANG Ke, et al. Coordinated dispatching of source-grid-load for inter-regional power grid considering uncertainties of both source and load sides[J]. Automation of Electric Power Systems, 2019, 43(22): 38-45, 150.
[23]
HUANG Z W, LIU L, LIU J C. Multi-time-scale coordinated optimum scheduling technique for a multi-source complementary power-generating system with uncertainty in the source-load[J]. Energies, 2023, 16(7): 3020.
An optimal dispatching strategy for a multi-source complementary power generation system taking source–load uncertainty into account is proposed, in order to address the effects of large-scale intermittent renewable energy consumption and power load instability on power grid dispatching. The uncertainty problem is first converted into common situations for study, such as load power forecasting and solar and wind power. The backward scenario reduction and Latin hypercube sampling techniques are used to create these common situations. Based on this, a multi-timescale coordinated optimum scheduling control method for a multi-source complementary power generation system taking the demand response into account is presented, and the optimal operation of a wind–PV–thermal-pumped storage hybrid system is examined. The time-of-use power price optimizes the electrical load in the day-ahead pricing mode, and the two types of demand response loads are selected in the day-ahead scheduling. Second, the lowest system operating cost and the minimal day-ahead and intra-day adjustment of each source are established as the optimization targets in the day-ahead and intra-day phases of the multi-timescale coordinated scheduling model of the multi-source complementary system. The example study demonstrates that the scheduling strategy may increase the amount of renewable energy consumed, minimize load fluctuations, increase system stability, and further reduce operating expenses, proving the viability and efficiency of the suggested strategy.
[24]
谭晶, 何川, 陈保瑞, 等. 考虑水光蓄互补和直流外送的电力系统分布鲁棒优化调度方法[J]. 中国电机工程学报, 2024, 44(15): 5947-5960.
TAN Jing, HE Chuan, CHEN Baorui, et al. Distributionally robust optimal scheduling method of power system considering hydropower-photovoltaic-pumped storage complementarity and DC transmission[J]. Proceedings of the CSEE, 2024, 44(15): 5947-5960.
[25]
崔杨, 李崇钢, 赵钰婷, 等. 考虑风-光-光热联合直流外送的源-网-荷多时段优化调度方法[J]. 中国电机工程学报, 2022, 42(2): 559-573.
CUI Yang, LI Chonggang, ZHAO Yuting, et al. Source-grid-load multi-time interval optimization scheduling method considering wind-photovoltaic-photothermal combined DC transmission[J]. Proceedings of the CSEE, 2022, 42(2): 559-573.
[26]
李国庆, 李欣彤, 边竞, 等. 计及光伏-负荷预测不确定性的直流跨省互联电网双级调度策略[J]. 中国电机工程学报, 2021, 41(14): 4763-4776.
LI Guoqing, LI Xintong, BIAN Jing, et al. Two level scheduling strategy for inter-provincial DC power grid considering the uncertainty of PV-load prediction[J]. Proceedings of the CSEE, 2021, 41(14): 4763-4776.
[27]
王会超, 秦昊, 周昶, 等. 计及新能源预测不确定性的跨区域日前-日内调度模型[J]. 电力系统自动化, 2019, 43(19): 60-67.
WANG Huichao, QIN Hao, ZHOU Chang, et al. Cross-regional day-ahead to intra-day scheduling model considering forecasting uncertainty of renewable energy[J]. Automation of Electric Power Systems, 2019, 43(19): 60-67.
[28]
WANG L F, HUA W, YANG Y, et al. Multi-time interval optimization scheduling method for inter-connected power systems considering operation risk and flexible adjustment of HVDC tie-lines[C]// 2022 IEEE/IAS Industrial and Commercial Power System Asia (I&CPS Asia). IEEE, 2022: 1453-1458.
[29]
张智晟, 于道林. 考虑需求响应综合影响因素的RBF-NN短期负荷预测模型[J]. 中国电机工程学报, 2018, 38(6): 1631-1638, 1899.
ZHANG Zhisheng, YU Daolin. RBF-NN based short-term load forecasting model considering comprehensive factors affecting demand response[J]. Proceedings of the CSEE, 2018, 38(6): 1631-1638, 1899.
[30]
杨世博, 孙亮, 陈立东, 等. 计及分时电价的含冷热电联供型微网的配电网系统协调优化调度[J]. 电力自动化设备, 2021, 41(4): 15-23.
YANG Shibo, SUN Liang, CHEN Lidong, et al. Coordinated optimal scheduling of distribution network with CCHP-based microgird considering time-of-use electricity price[J]. Electric Power Automation Equipment, 2021, 41(4): 15-23.
[31]
赵亮, 黎嘉明, 艾小猛, 等. 光伏出力随机性分量的提取和统计特性分析[J]. 电力系统自动化, 2017, 41(1): 48-56.
ZHAO Liang, LI Jiaming, AI Xiaomeng, et al. Analysis on random component extraction and statistical characteristics of photovoltaic power[J]. Automation of Electric Power Systems, 2017, 41(1): 48-56.
[32]
林卫星, 文劲宇, 艾小猛, 等. 风电功率波动特性的概率分布研究[J]. 中国电机工程学报, 2012, 32(1): 38-46, 20.
LIN Weixing, WEN Jinyu, AI Xiaomeng, et al. Probability density function of wind power variations[J]. Proceedings of the CSEE, 2012, 32(1): 38-46, 20.
[33]
艾欣, 刘晓, 孙翠英. 含风电场电力系统机组组合的模糊机会约束决策模型[J]. 电网技术, 2011, 35(12): 202-207.
AI Xin, LIU Xiao, SUN Cuiying. A fuzzy chance constrained decision model for unit commitment of power grid containing large-scale wind farm[J]. Power System Technology, 2011, 35(12): 202-207.
[34]
PRUCKNER M, AWAD A, GERMAN R. A study on the impact of packet loss and latency on real-time demand response in smart grid[C]// 2012 IEEE Globecom Workshops. IEEE, 2012: 1486-1490.
[35]
王振浩, 康佳, 裴哲义, 等. 基于多权重混合分布模型的光伏出力波动特性研究[J]. 太阳能学报, 2020, 41(6): 278-287.
WANG Zhenhao, KANG Jia, PEI Zheyi, et al. Study on fluctuation characteristics of PV power output based on multi-weight mixed distribution model[J]. Acta Energiae Solaris Sinica, 2020, 41(6): 278-287.

基金

国家自然科学基金项目(52177074)

编辑: 景贺峰
PDF(2569 KB)

Accesses

Citation

Detail

段落导航
相关文章
AI小编
你好!我是《电力建设》AI小编,有什么可以帮您的吗?

/