PDF(3476 KB)
PDF(3476 KB)
PDF(3476 KB)
考虑计划与非计划停运事件影响的电池储能容量配置优化
Optimization for Battery Energy Storage Configuration Considering the Impact of Planned and Unplanned Outages
【目的】 在电池储能电站实际运行中,周期性检修维护计划停运以及设备突发故障非计划停运都会引起可用容量损失,显著影响电站的经济性。现有电池储能容量配置优化方法未能充分计及这两类事件的影响,为此,提出一种考虑计划与非计划停运事件影响的电池储能容量配置优化方法。【方法】 首先,针对电池储能电站的周期性维护需求,构建基于全生命周期的计划性停运下收益动态评估模型;其次,对电池储能电站一次设备和二次设备的故障展开建模,建立非计划性停运场景下的电池储能电站收益评估方法。然后,综合考虑最大化受两类停运事件影响的综合收益与最小化储能电站综合投资成本,构建储能容量配置多目标优化模型。为自适应平衡优化模型的两个目标函数,设计基于边际改善率的求解算法实现迭代求解。最后,以IEEE 30节点系统和某省区域电网为例进行算例分析,验证所提方法的有效性。【结果】 相比传统配置方法,储能的高可用日占比提升约51.5%,验证了所提容量配置优化方法的合理性和有效性。【结论】 通过同时计及两种事件的影响和多目标优化,在模拟运行中可降低因舱室级维护和故障带来的影响,为运行调度和交易履约提供便利。
[Objective] In the practical operation of battery energy storage stations (BESS), both planned outages caused by periodic maintenance and unplanned outages resulting from sudden equipment failures can lead to available capacity losses, significantly affecting the economic viability of the station. Existing optimization methods for battery energy storage capacity configuration have not adequately considered the impacts of these two types of outage events. To address this gap, this paper proposes an optimization method for battery energy storage capacity configuration that explicitly incorporates planned and unplanned outages. [Methods] First, addressing the periodic maintenance requirements of battery energy storage stations, a life-cycle-based dynamic revenue evaluation model is established for planned outages associated with periodic maintenance. Second, failures of primary and secondary equipment in battery energy storage stations are modeled to assess revenues under unplanned outage scenarios. On this basis, a multi-objective optimization model for energy storage capacity configuration is formulated to maximize aggregate revenues affected by both types of outage events while minimizing the total investment cost. To adaptively balance the two objective functions of the optimization model, an iterative solution algorithm based on marginal improvement rates is designed. Finally, case studies using the IEEE 30-bus system and a provincial regional power grid are conducted to verify the validity of the proposed method. [Results] Compared with traditional allocation methods, the proportion of high-availability days for energy storage is increased by approximately 51.5%, validating the rationality and effectiveness of the proposed capacity allocation optimization method. [Conclusions] By simultaneously considering the impacts of both types of outage events and employing multi-objective optimization, the proposed method can mitigate the effects of cabin-level maintenance and failures during simulated operation, thereby facilitating operational scheduling and transaction fulfillment.
电池储能 / 容量配置优化 / 计划停运事件 / 非计划停运事件 / 可用容量
battery energy storage / capacity configuration optimization / planned outage events / unplanned outage events / available capacity
| [1] |
柴玮. “十五五”电力发展规划方向的思考[J]. 中国电力企业管理, 2025(10): 30-32.
|
| [2] |
余斌, 徐彪, 周挺, 等. 湖南电网侧储能电站运维检修现状分析与解决思路[J]. 湖南电力, 2022, 42(2): 89-93.
介绍了湖南电网侧储能电站基本结构组成、支撑作用和商业模式,梳理了国内电网侧储能电站建设、运维检修情况,从标准规范、电池本体、安全防控、质量管控、应急处置五方面阐述了湖南储能电站建设、运维检修中存在的痛点、难点问题。针对当前存在问题,提出解决思路,以期提升湖南电网侧储能电站运维检修管控水平,保障储能电站安全稳定运行。
This paper introduces the basic structure composition, supporting role and business model of energy storage power station on grid side of Hunan power grid. The construction, operation and maintenance of energy storage power station on grid side of domestic power grid side are summarized. The pain points and difficult problems existing in Hunan energy storage power station construction, operation and maintenance are expounded from five aspects, including standards and specifications, battery body, safety prevention and control, quality control and emergency disposal. In view of the current problems, some solutions are put forward in order to improve the operation and maintenance control level of energy storage power station on grid side in Hunan power grid side, and ensure the safe and stable operation of energy storage power station.
|
| [3] |
电化学储能电站检修规程:GB/T42315—2023[S]. 北京: 中国标准出版社, 2023.
Code of maintenance for electrochemical energy storage station: GB/T 42315—2023[S]. Beijing: Standards Press of China, 2023.
|
| [4] |
黄康桥. 新型储能产业发展问题分析及政策建议研究[J]. 储能科学与技术, 2025, 14(7): 2617-2624.
在“双碳”背景下,新型储能是支撑我国新型电力系统的关键技术和基础装备,也是国际能源竞争的战略新领域。现阶段,我国新型储能产业在技术、市场等层面具有全球领先优势,但产业从研发示范向规模化发展的转型过程中仍面临一系列关键问题,亟需凝聚行业共识以制定针对性解决方案。本文首先从新型储能产业的发展现状入手,从政策、市场、技术3个层面介绍了产业发展情况及特点;其次,系统分析了行业发展面临的问题挑战,指出低质低价竞争已成行业高质量发展的主要阻碍。此外,安全标准、市场机制、数据建设、海外合规等方面仍存在不足,也是行业亟需完善的关键因素;最后,针对上述一系列问题挑战,本研究提出了多条政策建议和解决思路,主要包括安全与性能分级评估、并网实证与强制年检、容量补偿与保险手段、数据分区与行业共享、绿证互认与绿电直供5个维度,对于推动新型储能的高质量发展具有一定参考价值。
Against the backdrop of China's carbon peaking and carbon neutrality goals, new energy storage has become a key infrastructure and technology that supports the building of a new power system. It has gradually emerged as a strategic and competitive industry worldwide. While China's new energy storage industry leads in technology and market, the industry is undergoing a critical transition from the research and demonstration phase to large-scale deployment. In this regard, several key developmental challenges remain. These challenges require collective efforts and solutions. This study first reviewed the development status of the new energy storage industry, focusing on the characteristics and progress of the industry from policy, market, and technology viewpoints. It then analyzed the key challenges to the high-quality development of the industry, highlighting that low-quality, low-price competition has become the main limitation. Additionally, deficiencies in safety standards, market mechanisms, data sharing, and overseas compliance are areas that require further improvement. In light of these challenges, several policy recommendations and solutions are proposed considering the following five aspects: (1) safety and performance rating and evaluation mechanism, (2) grid-connection testing and verification and annual mandatory safety inspection, (3) capacity compensation mechanism and insurance product tailored to energy storage, (4) data management and industry-wide sharing, and (5) mutual recognition globally of green certificates and pilot projects of direct green power supply. These recommendations aim to provide some insights into the high-quality development of the industry. |
| [5] |
卢奇秀. 电化学储能利用水平稳步上升[N]. 中国能源报, 2024-04-01(8).
|
| [6] |
罗魁, 郭剑波, 高飞, 等. 新兴能源基础设施安全风险分析与防控体系[J]. 电网技术, 2024, 48(2): 457-468.
|
| [7] |
郭建鹏, 刘明灿, 李振翔, 等. 适应电能替代需要的储能电站检修周期优化[J]. 广东电力, 2018, 31(7): 24-29.
|
| [8] |
蔡杰, 何立钢, 鄂士平, 等. 多类型灵活资源参与下的主动配电网电化学储能检修优化策略[J]. 电气应用, 2025, 44(1): 32-42.
|
| [9] |
王廷涛, 苗世洪, 张松岩, 等. 基于状态评估的多类型储能系统检修优化策略[J]. 电力自动化设备, 2021, 41(10): 234-243.
|
| [10] |
美国国家可再生能源实验室, 桑迪亚国家实验室, SunSpec Alliance. 光伏与储能系统运行与维护最佳实践(第三版)[R]. 科罗拉多州戈尔登: 美国国家可再生能源实验室, 2018.
National Renewable Energy Laboratory (NREL), Sandia National Laboratories, SunSpec Alliance. Best practices for operation and maintenance of photovoltaic and energy storage systems[R]. Golden, CO: National Renewable Energy Laboratory, 2018.
|
| [11] |
陈萌, 赵谡, 王亚林, 等. 大规模电化学储能系统故障监测与诊断研究综述[J]. 中国电机工程学报, 2024, 44(20): 8086-8102.
|
| [12] |
刘有为, 陈小波, 吴凯. 基于蒙特卡洛法的电化学储能电站可靠性分析[J]. 电网技术, 2024, 48(8): 3299-3306.
|
| [13] |
李斌, 李博睿, 李超, 等. 考虑过充/过放的电化学储能电站建模及故障特性分析[J]. 电力系统自动化, 2024, 48(14): 119-128.
|
| [14] |
杨夯, 黄小庆, 于慎仟, 等. 电化学储能电站主动安全研究[J]. 电力自动化设备, 2023, 43(8): 78-87.
|
| [15] |
李超, 李博睿, 李斌, 等. 功率方向元件在电化学储能电站接入配电网中的适应性分析[J]. 电力系统自动化, 2025, 49(11): 126-135.
|
| [16] |
|
| [17] |
周京华, 翁志鹏, 宋晓通. 兼顾可靠性与经济性的孤岛型光储微电网容量配置方法[J]. 电力系统自动化, 2021, 45(8): 166-174.
|
| [18] |
|
| [19] |
陆瑜, 何兆磊, 李琰, 等. 计及风光不确定性的综合能源系统容量配置双层优化[J]. 电力系统保护与控制, 2025, 53(19): 127-138.
|
| [20] |
庞秀岚, 杨祺, 李晓峰, 等. 满足光伏电站调峰和一次调频功能的混合储能配置方法[J]. 电力科学与技术学报, 2025, 40(5): 173-183.
|
| [21] |
翁兴航, 苏盛. 新型电力系统电网侧电化学储能电站消防安全管理研究综述[J]. 电力科学与技术学报, 2025, 40(5): 155-172.
|
| [22] |
夏鹞轩, 吴丽红, 夏侯元, 等. 基于IPO算法的配电网储能优化配置[J]. 智慧电力, 2025, 53(9): 91-98.
|
| [23] |
严嘉鑫, 范宏, 贾庆山, 等. 计及共享氢储能和虚拟储能的多园区综合能源系统协同规划[J]. 智慧电力, 2025, 53(6): 10-18.
|
| [24] |
巨云涛, 周伟鹏, 于宗民. 考虑移动储能车提升系统供电可靠性的配电网规划方法[J]. 电力系统保护与控制, 2024, 52(17): 128-138.
|
| [25] |
|
| [26] |
李正曦, 周万鹏, 陈来军, 等. 基于合作博弈的新能源场站群分散式共享储能优化配置策略[J]. 智慧电力, 2025, 53(6): 43-49.
|
| [27] |
孙建华, 王佳旭, 杜晓勇, 等. 考虑频率安全约束的高比例风电电力系统储能优化配置策略[J]. 电力科学与技术学报, 2024, 39(5): 151-162.
|
| [28] |
于娜, 吴钰豪, 黄大为, 等. 计及功能性衰减的独立运营模式下电化学储能容量配置研究[J]. 电力系统保护与控制, 2024, 52(17): 62-72.
|
| [29] |
徐爽, 万靖, 崔世常, 等. 不对称信息下新型储能容量租赁市场的博弈均衡分析[J]. 电力系统保护与控制, 2024, 52(13): 13-24.
|
| [30] |
王欣, 谭永怡, 秦斌. 改进MOGOA及其在风储容量优化配置中的应用[J]. 电力科学与技术学报, 2024, 39(2): 159-169.
|
| [31] |
|
| [32] |
|
| [33] |
何明, 柴二亮, 何亮, 等. 基于BMS技术的台区终端电力检修用高安全移动储能电源设计[J]. 自动化与仪器仪表, 2024(8): 333-337.
|
| [34] |
陈静鹏, 张鸿轩, 张勇, 等. 面向区域调频辅助服务市场的南方电网统一调频控制区设计与策略优化[J]. 电网技术, 2022, 46(7): 2657-2664.
|
| [35] |
胡恒, 秦建茹, 李海波, 等. 考虑极限场景的电力系统分布鲁棒低碳经济调度[J]. 电力建设, 2025, 46(4): 160-172.
|
| [36] |
|
| [37] |
California ISO. Curtailed and non-operational generators[EB/OL]. [2025-08-26]. https://www.caiso.com/market-operations/outages/curtailed-and-non-operational-generators.caiso.com.
|
| [38] |
|
| [39] |
电化学储能电站设计规范:GB51048—2014[S]. 北京: 中国计划出版社, 2015.
Design code for electrochemical energy storage station: GB 51048—2014[S]. Beijing: China Planning Press, 2015.
|
利益冲突声明(Conflict of Interests): 所有作者声明不存在利益冲突。
AI小编
/
| 〈 |
|
〉 |