考虑短时线路动态增容的多区域电网备用优化

刘胤均, 余顺江, 俞鸿飞, 陶文伟, 曾勇杰, 林振智

电力建设 ›› 2026, Vol. 47 ›› Issue (9) : 91-101.

PDF(2772 KB)
PDF(2772 KB)
电力建设 ›› 2026, Vol. 47 ›› Issue (9) : 91-101. DOI: 10.12204/j.issn.1000-7229.2026.09.007
调度运行

考虑短时线路动态增容的多区域电网备用优化

作者信息 +

Optimization of Power Reserve in Multi-Area Power Grid Considering Short-Term Dynamic Line Rating

Author information +
文章历史 +

摘要

【目的】为应对高比例可再生能源接入导致的电力系统源荷波动问题,应保证多区域电网备用的合理配置与有效调用。在此背景下,提出了考虑短时线路动态增容(short-term dynamic line rating,SDLR)的多区域电网备用优化方法。【方法】首先,构建了基于机会约束的全网源荷波动场景,并通过预留区域备用容量来保障各区域的调节能力,实现全网与区域的风险协同。然后,提出了考虑SDLR和需求侧资源的日内备用优化方法,实现线路传输能力的高效利用,以保证备用有效调用。最后,以某省简化的输电网为例进行验证分析。【结果】算例结果表明,通过考虑SDLR,全网备用的实际调用比例由传统静态安全约束下的4.73%提升至20.06%,系统运行风险成本下降了58.30%。【结论】所提方法能减缓线路阻塞,降低失负荷与弃电风险,有效提升了多区域电网的供电可靠性与运行经济性。

Abstract

[Objective] To address source-load fluctuations in systems with high-penetration renewable energy, the rational arrangement and effective dispatch of power reserves should be ensured. Given this background, a multi-area power grid reserve optimization method considering short-term dynamic line rating (SDLR) is proposed. [Methods] Firstly, a network-wide source-load fluctuation scenario based on chance constraints is constructed. By pre-scheduling regional reserve capacity to guarantee the regulation capability of each area, network-wide and regional risk coordination is achieved. Secondly, an intra-day reserve optimization method considering SDLR and demand-side resources is proposed to realize the efficient utilization of line transmission capacity and ensure the effectiveness of reserve dispatch. Finally, the proposed method is verified and analyzed using a simplified provincial transmission network. [Results] The result demonstrate that by integrating SDLR, the actual reserve dispatch ratio increases from 4.73% under traditional static security constraints to 20.06%, and the system operation risk cost is reduced by 58.3%. [Conclusions] The proposed method can mitigate line congestion and reduce the risks of load shedding and renewable energy curtailment, effectively improving the power supply reliability and operational economic efficiency of multi-area power grids.

关键词

备用优化 / 短时线路动态增容 / 源荷波动 / 需求侧资源 / 风险协调 / 机会约束

Key words

reserve optimization / short-term dynamic line rating / source-load fluctuation / demand-side resources / risk coordination / chance constraints

引用本文

导出引用
刘胤均, 余顺江, 俞鸿飞, . 考虑短时线路动态增容的多区域电网备用优化[J]. 电力建设. 2026, 47(9): 91-101 https://doi.org/10.12204/j.issn.1000-7229.2026.09.007
LIU Yinjun, YU Shunjiang, YU Hongfei, et al. Optimization of Power Reserve in Multi-Area Power Grid Considering Short-Term Dynamic Line Rating[J]. Electric Power Construction. 2026, 47(9): 91-101 https://doi.org/10.12204/j.issn.1000-7229.2026.09.007
中图分类号: TM72   

参考文献

[1]
华昊辰, 张洲赫, 邹奕群, 等. 新型电力系统需求侧灵活性资源低碳协同优化研究综述[J]. 电力建设, 2025, 46(6): 60-75.
Hua Haochen, Zhang Zhouhe, Zou Yiqun, et al. Review of low-carbon co-optimization research on demand-side flexibility resources for new power systems[J]. Electric Power Construction, 2025, 46(6): 60-75.
[2]
李东东, 申润祺, 杨帆, 等. 基于信息间隙决策理论的多区域电网源-储-荷灵活优化运行策略[J]. 电力系统保护与控制, 2025, 53(19): 39-51.
Li Dongdong, Shen Runqi, Yang Fan, et al. Flexible optimal operation strategy for source-storage-load in multi-regional power grids based on information gap decision theory[J]. Power System Protection and Control, 2025, 53(19): 39-51.
[3]
Wang Y C, Lu F, Gu C H, et al. Multi-objective optimization for customer flexibility management to mitigate consecutive days of power supply shortages[J]. IEEE Transactions on Power Systems, 2025, 40(4): 3306-3319.
[4]
马瑞, 王维皓, 彭泽朴, 等. 多类型极端天气场景下配电网的脆弱点与易感点识别[J]. 电力建设, 2025, 46(12): 82-95.
Ma Rui, Wang Weihao, Peng Zepu, et al. Identification of vulnerable and susceptible points in distribution networks under multiple types of extreme weather scenarios[J]. Electric Power Construction, 2025, 46(12): 82-95.
[5]
张旭, 陈云龙, 王仪贤, 等. 基于潮流断面修正的含风电电网无功-电压分区方法[J]. 电力自动化设备, 2019, 39(10): 48-54.
Zhang Xu, Chen Yunlong, Wang Yixian, et al. Reactive power-voltage partitioning of power grid with wind power based on correction of power flow section[J]. Electric Power Automation Equipment, 2019, 39(10): 48-54.
[6]
Zhang H B, Ye J C, Hu X W, et al. Bidirectional carbon emission flow analysis for the high-penetration renewable energy systems with distributed energy resources[J]. Energy Conversion and Economics, 2025, 6(4): 213-224.
[7]
师文杰, 李华强, 陈毅鹏, 等. 需求侧多主体基于纳什谈判的电能-灵活性资源日前交易机制[J]. 电力建设, 2025, 46(9): 174-189.
Shi Wenjie, Li Huaqiang, Chen Yipeng, et al. Day-ahead trading mechanism of multi-subject electricity-flexible resources on demand-side based on Nash negotiation[J]. Electric Power Construction, 2025, 46(9): 174-189.
[8]
黄靖, 罗浩, 郭昊文, 等. 计及储能寿命损耗的渔排多微网系统多场景双层优化策略[J]. 太阳能学报, 2026, 47(1): 765-773.
Huang Jing, Luo Hao, Guo Haowen, et al. Fishing raft multi-microgrid system considering energy storage life degradation multi-scenario two-layer optimization strategy[J]. Acta Energiae Solaris Sinica, 2026, 47(1): 765-773.
[9]
程礼临, 罗子杰, 李群, 等. 融合模糊神经网络预决策的有源配电网实时随机调度方法[J]. 电力系统自动化, 2025, 49(19): 75-85.
Cheng Lilin, Luo Zijie, Li Qun, et al. Real-time stochastic dispatch method for active distribution network using fuzzy neural network pre-decision[J]. Automation of Electric Power Systems, 2025, 49(19): 75-85.
[10]
张磊, 娄世元, 叶婧, 等. 计及电氢输运耦合的海上风电场检修-运行协同鲁棒优化策略[J]. 电力自动化设备, 2025, 45(12): 218-227.
Zhang Lei, Lou Shiyuan, Ye Jing, et al. Maintenance-operation collaborative robust optimization strategy for offshore wind farms considering electricity-hydrogen transport coupling[J]. Electric Power Automation Equipment, 2025, 45(12): 218-227.
[11]
赵书强, 赵蓬飞, 李志伟, 等. 基于相关机会目标规划的电力系统备用优化研究[J]. 太阳能学报, 2025, 46(1): 540-546.
Zhao Shuqiang, Zhao Pengfei, Li Zhiwei, et al. Reserve optimization of power system based on dependent-chance goal programming[J]. Acta Energiae Solaris Sinica, 2025, 46(1): 540-546.
[12]
高志海, 桑丙玉, 孙鑫, 等. 考虑全局-局部风险协调控制的多区域电力系统日前-日内两阶段优化调度[J]. 电网技术, 2025, 49(8): 3094-3103.
Gao Zhihai, Sang Bingyu, Sun Xin, et al. Optimal dispatching of multi-region power system in day-ahead and intra-day stages considering global-regional power supply risk coordinated control[J]. Power System Technology, 2025, 49(8): 3094-3103.
[13]
Wang Y C, Xue Y S, Xie D L, et al. Stochastic optimization of medium-and short-term reserve arrangement for preventive and emergency control under typhoon disaster[J]. Journal of Modern Power Systems and Clean Energy, 2024, 13(1): 190-201.
[14]
乔海洋, 冯亮, 边敦新, 等. 基于分布鲁棒优化的极端高温日电源旋转备用配置[J/OL]. 电网技术, 2025-04-23. https://doi.org/10.13335/j.1000-3673.pst.2025.0191.
Qiao Haiyang, Feng Liang, Bian Dunxin, et al. Spinning reserve allocation for power sources on extreme high-temperature days based on distributionally robust optimization[J/OL]. Power System Technology, 2025-04-23. https://doi.org/10.13335/j.1000-3673.pst.2025.0191.
[15]
崔伟, 李武璟, 牛拴保, 等. 自然灾害下高风险多重故障集快速生成方法[J]. 电力自动化设备, 2021, 41(4): 197-203.
Cui Wei, Li Wujing, Niu Shuanbao, et al. Rapid generation method of high risk multiple fault set under natural disaster[J]. Electric Power Automation Equipment, 2021, 41(4): 197-203.
[16]
陈鸿鑫, 惠恒宇, 包铭磊, 等. 考虑动态分区可靠性约束的新能源电力系统备用优化模型[J]. 电力系统自动化, 2024, 48(23): 65-75.
Chen Hongxin, Hui Hengyu, Bao Minglei, et al. Optimization model for reserve of power system with renewable energy considering reliability constraints of dynamic partitioning[J]. Automation of Electric Power Systems, 2024, 48(23): 65-75.
[17]
文旭, 周全, 刘晟, 等. 计及输电线路弹性传输容量的省内-省间可交付备用优化决策方法[J]. 电网技术, 2026, 50(2): 672-682.
Wen Xu, Zhou Quan, Liu Sheng, et al. Intra-and inter-provincial deliverable operating reserve dispatch considering flexible capacity of transmission lines[J]. Power System Technology, 2026, 50(2): 672-682.
[18]
崔晖, 王雪林, 李文星, 等. 基于ADMM方法的国-网-省多层级协同调度研究[J]. 电网技术, 2026, 50(2): 588-599.
Cui Hui, Wang Xuelin, Li Wenxing, et al. Hierarchical coordination in national-regional-provincial power dispatch: an ADMM approach[J]. Power System Technology, 2026, 50(2): 588-599.
[19]
侯宇, 王伟, 韦徵, 等. 输电线路动态增容技术研究及应用[J]. 电力系统自动化, 2021, 45(17): 189-198.
Hou Yu, Wang Wei, Wei Zheng, et al. Research and application of dynamic rating technology of transmission lines[J]. Automation of Electric Power Systems, 2021, 45(17): 189-198.
[20]
Zhang Y M, Zhang Y C, Xue X Z, et al. Affinely adjustable robust optimal scheduling of a power system considering the flexibility of supply and demand[J]. Energy Conversion and Economics, 2025, 6(3): 170-186.
[21]
张怡, 张锋, 李有春, 等. 基于智慧输电线路的动态增容辅助决策系统[J]. 电力系统保护与控制, 2021, 49(4): 160-168.
Zhang Yi, Zhang Feng, Li Youchun, et al. Assistant decision system to improve transmission capacity based on a smart transmission line[J]. Power System Protection and Control, 2021, 49(4): 160-168.
[22]
胡惊涛, 吕飞春, 张文涛, 等. 基于条件风险价值的综合能源系统日前-日内两阶段调度模型[J]. 电力需求侧管理, 2023, 25(2): 43-49.
Hu Jingtao, Feichun, Zhang Wentao, et al. A conditional value-at-risk based two stage day-ahead dispatch model for integrated energy systems[J]. Power Demand Side Management, 2023, 25(2): 43-49.
[23]
Chen J, Wu P F, Chen W, et al. Two-layer coordinated operation of multi-energy system considering carbon-oriented collaborative pricing mechanism via two-stage stochastic programming approach[J]. Applied Energy, 2026, 406: 127298.
[24]
Zhou J L, Ran J, Ren J Y, et al. Digital intelligence-driven synergistic optimization of capacity configuration for wind-solar-hydrogen multi-energy systems integrated with shared energy storage[J]. Energy, 2025, 341: 139497.
[25]
于雨彤, 王灿, 李勇, 等. 高比例光伏接入的配电网多层级反向重过载风险评估[J]. 高电压技术, 2024, 50(10): 4540-4549.
Yu Yutong, Wang Can, Li Yong, et al. Multi-level reverse heavy overload risk assessment for distribution system with high percentage of photovoltaic access[J]. High Voltage Engineering, 2024, 50(10): 4540-4549.
[26]
Nick M, Alizadeh-Mousavi O, Cherkaoui R, et al. Security constrained unit commitment with dynamic thermal line rating[J]. IEEE Transactions on Power Systems, 2016, 31(3): 2014-2025.
[27]
Ma Y J, Wang H F, Yu W Y, et al. User-side cloud energy storage configuration and operation optimization considering time-of-use pricing and state-of-charge management[J]. Energy Conversion and Economics, 2025, 6(2): 65-82.
[28]
殷自力, 陈宇星. 基于功率传输转移分布因子的简化电网潮流计算方法[J]. 电力系统保护与控制, 2016, 44(17): 25-30.
Yin Zili, Chen Yuxing. A power flow computation method for reduction grid based on power transfer distribution factor[J]. Power System Protection and Control, 2016, 44(17): 25-30.
[29]
孟高军, 钱聪聪, 于琳琳, 等. 基于抽蓄协调的新能源纳入电力系统备用方法[J]. 太阳能学报, 2024, 45(10): 162-170.
Meng Gaojun, Qian Congcong, Yu Linlin, et al. Standby method of integrating new energy into power systems based on pumped storage coordination[J]. Acta Energiae Solaris Sinica, 2024, 45(10): 162-170.
[30]
Li H, Yu H Y, Liu Z J, et al. Long-term scenario generation of renewable energy generation using attention-based conditional generative adversarial networks[J]. Energy Conversion and Economics, 2024, 5(1): 15-27.

作者贡献声明(Authors' Contributions):

刘胤均进行了研究设计,完成了数据分析,并进行了论文撰写;余顺江、林振智对论文的整体框架进行了指导和审核;俞鸿飞、陶文伟、曾勇杰参与了论文修订;林振智提出了研究思路。所有作者均阅读并同意了论文终稿内容。

利益冲突声明(Conflict of Interests):

所有作者声明不存在利益冲突。

基金

智能电网国家科技重大专项(2030)(2026ZD0809800)

编辑: 孙静琳