特高压变电站设备运维检修费用影响因素度量与分析

周宏宇,薛友,刘祚宇,沈洁,俞敏,文福拴

电力建设 ›› 2018, Vol. 39 ›› Issue (1) : 19.

PDF(3055 KB)
PDF(3055 KB)
电力建设 ›› 2018, Vol. 39 ›› Issue (1) : 19. DOI: 10.3969/j.issn.1000-7229.2018.01.003
电力经济研究 ·栏目主持 文福拴教授·

 特高压变电站设备运维检修费用影响因素度量与分析

  •  周宏宇1,薛友2,刘祚宇2,沈洁3,俞敏4,文福拴2
     
作者信息 +

 Measurement and Analysis of Impacting Factors for Operation and Maintenance Costs in UHV Substations

  •  ZHOU Hongyu1, XUE You2, LIU Zuoyu2, SHEN Jie3, YU Min4, WEN Fushuan2
     
Author information +
文章历史 +

摘要

 摘 要:特高压设备运维检修是电力网络运营管理的一项核心业务,对相关费用影响因素进行识别、度量和分析是对其进行有效管控的基础。在此背景下,首先从检修成本构成和外部环境2个方面分别识别出特高压设备运维检修费用的直接和间接影响因素,并采用空间降维法、十年折旧法、模糊C均值聚类法对部分影响因素进行量化。然后,利用相关分析、占比分析、主成分分析、通径分析对影响因素进行度量和分析。最后,以浙江省某特高压变电站设备运维检修实际工程为例对所提出的方法进行验证,识别出了对运维检修费用具有重要影响的一些因素。 
 

Abstract

 ABSTRACT: The operation and maintenance (O&M) of ultra high voltage (UHV) equipment is a key business issue in management and operation of a power system, identification, measurement and analysis of the factors impacting on O&M costs are essential for controlling the O&M costs effectively. Given this background, the indirect and direct impacting factors on the O&M costs of UHV equipment are first identified from both the compositions of the maintenance costs and the external environment, and parts of impacting factors are quantified by employing the dimension reduction method, decade depreciation method, fuzzy C-means clustering method. Then, these impacting factors are measured and analyzed through the correlation analysis, proportion analysis, principal component analysis, and path analysis. Finally, an actual O&M project of an UHV substation in Zhejiang province is served for demonstrating the presented method, and some important impacting factors on O&M costs are then identified.
 

关键词

  / 特高压 / 运维检修 / 影响因素 / 量化方法 / 主成分分析 / 通径分析

Key words

 ultra high voltage (UHV) / operation and maintenance (O&M) / impacting factors / quantitative analysis method / principal component analysis / path analysis

 

引用本文

导出引用
周宏宇,薛友,刘祚宇,沈洁,俞敏,文福拴.  特高压变电站设备运维检修费用影响因素度量与分析[J]. 电力建设. 2018, 39(1): 19 https://doi.org/10.3969/j.issn.1000-7229.2018.01.003
ZHOU Hongyu, XUE You, LIU Zuoyu, SHEN Jie, YU Min, WEN Fushuan.  Measurement and Analysis of Impacting Factors for Operation and Maintenance Costs in UHV Substations[J]. Electric Power Construction. 2018, 39(1): 19 https://doi.org/10.3969/j.issn.1000-7229.2018.01.003
中图分类号:      TM 72   

参考文献

 [1]刘振亚. 加快建设坚强国家电网促进中国能源可持续发展[J]. 电力建设,2006, 27(10): 1-3. 
[2]卢艳超,郑燕,赵彪. 输变电工程外部环境影响分析[J]. 中国电力, 2012, 45(10): 100-103.
LU Yanchao, ZHENG Yan, ZHAO Biao. The external environment influence analysis of power transmission project based on PEST model [J]. Electric Power, 2012, 45(10): 100-103.
[3]王绵斌,李欢欢,谭忠富,等. 基于支持向量机方法的输电工程造价指标体系[J]. 电力建设, 2014, 35(3): 102-106.
WANG Mianbin, LI Huanhuan, TAN Zhongfu, et al. Index evaluation system of power transmission project cost based on support vector machine method [J]. Electric Power Construction, 2014, 35(3): 102-106.
[4]康久兴,艾利盛,张喜荣,等. 变电站工程造价影响因素分析[J]. 东北电力大学学报,2011, 31(5/6): 131-136.
KANG Jiuxing, AI Lisheng, ZHANG Xirong, et al. Analysis of substation project cost influence factors [J]. Journal of Northeast Dianli University, 2011, 31(5/6): 131-136.
[5]季咏梅,吴东平,彭瀛,等. 变电工程造价影响因素分析:基于SPSS软件主成分分析法[J]. 经营与管理,2014,(2): 125-130.
JI Yongmei, WU Dongping, PENG Ying, et al. Analysis of factors affecting the cost of substation project based on the principal component analysis method of SPSS software [J]. Management and Administration, 2014, (2): 125-130.
[6]王佼. 500kV变电工程造价主要影响因素分析[J]. 工程管理学报,2012, 26(6): 66-69.
WANG Jiao. Key factors for costs of 500kV power transformation projects [J]. Journal of Engineering Management, 2012, 26(6): 66-69.
[7]卢艳超,温卫宁,赵彪,等. 电网工程设备材料价格影响因素分析[J]. 电力建设,2013, 34(4): 74-78.
LU Yanchao, WEN Weining, ZHAO Biao, et al. Analysis on influence factors of power grid equipment and material price [J]. Electric Power Construction, 2013, 34(4): 74-78.
[8]胡晋岚,高晓彬. 输变电工程造价影响因素识别及数据建模分析[J]. 华北电力大学学报(社会科学版),2016(5): 55-59.
HU Jinlan, GAO Xiaobin. Identification and data modeling of transmission and transformation projects’ factors [J]. Journal of North China Electric Power University (Social Sciences), 2016(5): 55-59.
[9]赵振宇,吕乾雷,游纬扬,等. 农村电网35kV输电线路工程造价评价指标模型[J]. 电网技术, 2008, 32(14): 96-100.
ZHAO Zhenyu, LU Qianlei, YOU Weiyang, et al. An evaluation index model of construction cost for 35 kV transmission lines in rural power network [J]. Power System Technology, 2008, 32(14): 96-100.
[10]陈洁,侯凯,高晓彬. 输变电工程造价合理性评价方法研究[J]. 南方电网技术,2016, 10(8): 95-101.
CHEN Jie, HOU Kai, GAO Xiaobin. Research on cost reasonability evaluation method of power transmission and transformation projects [J]. Southern Power System Technology, 2016, 10(8): 95-101.
[11]周晶晶,袁越,李振杰,等. 计及供电可靠性的配电网节点电价计算方法[J]. 电力系统自动化, 2016, 40(7): 42-48.
ZHOU Jingjing, YUAN Yue, LI Zhenjie, et al. Calculation method of nodal price in distribution network considering power supply reliability [J]. Automation of Electric Power Systems, 2016, 40(7): 42-48.
[12]黄仁,胡敏. 综合颜色空间特征和纹理特征的图像检索[J]. 计算机科学, 2014, 41(6A): 118-121.
HUANG Ren, HU Min. Content-based image retrieval using color position and texture fused feature [J]. Computer Science, 2014, 41(6A): 118-121.
[13]俞钟祺,马秀兰. 固定资产折旧方法比较[J]. 数理统计与管理, 2000, 19(1): 46-50.
YU Zhongqi, MA Xiulan. Analysis about the methods of depreciation for assets [J]. Journal of Applied Statistics and Management, 2000, 19(1): 46-50.
[14]王桂兰,周国亮,萨初日拉,等. Spark环境下的并行模糊C均值聚类算法[J]. 计算机应用,2016,36(2): 342-347.
WANG Guilan, ZHOU Guoliang,CHURILA S A, et al. Parallel fuzzy C-means clustering algorithm in Spark [J]. Journal of Computer Applications, 2016, 36(2): 342-347.
[15]刘剑,邰能灵,范春菊,等. 基于暂态电流Pearson相关性的两电平VSC-HVDC直流线路故障判别[J]. 电工技术学报, 2017, 32(3): 74-85.
LIU Jian, TAI Nengling, FAN Chunju, et al. Afault identification for two-level VSC-HVDC DC line based on Pearson correlation of transient current [J]. Transactions of China Electrotechnical Society, 2017, 32(3): 74-85.
[16]王玉梅,董洋洋,刘兴艳. 基于SFB和相关分析法的小电流接地故障选线方法[J]. 电力自动化设备,2011, 31(2): 48-51.
WANG Yumei, DONG Yangyang, LIU Xingyan. Selection of faulty line based on SFB and correlation analysis for small-current neutral grounding system [J]. Electric Power Automation Equipment, 2011, 31(2): 48-51.
[17]刘铭,任艳君,周康渠. 企业零部件采购成本占比分析模型研究及应用[J]. 煤炭技术,2011, 30(11): 278-279.
LIU Ming, REN Yanjun, ZHOU Kangqu. Study and application of enterprise spare parts procurement cost proportion analysis model [J]. Coal Technology, 2011, 30(11): 278-279.
[18]聂宏展,聂耸,乔怡, 等. 基于主成分分析法的输电网规划方案综合决策[J]. 电网技术,2010,34(6): 134-138.
NIE Hongzhan, NIE Song, QIAO Yi, et al. Comprehensive decision-making of alternative transmission network planning based on principal component analysis [J]. Power System Technology, 2010, 34(6): 134-138.
[19]商立群,王守鹏. 改进主成分分析法在火电机组综合评价中的应用[J]. 电网技术, 2014, 38(7): 1928-1933.
SHANG Liqun, WANG Shoupeng. Application of improved principal component analysis in comprehensive assessment on thermal power generation units [J]. Power System Technology, 2014, 38(7): 1928-1933.
[20]章侃,周文玮,文福拴,等. 基于风险价值的输电工程造价评估与风险管控[J]. 电力系统及其自动化学报, 2016, 28(6): 1-6.
ZHANG Kan, ZHOU Wenwei, WEN Fushuan, et al. Evaluation of transmission project cost and risk control with value at risk [J]. Proceedings of the CSU-EPSA, 2016, 28(6): 1-6.
[21]白俊良,梅华威. 改进相似度的模糊聚类算法在光伏阵列短期功率预测中的应用[J]. 电力系统保护与控制,2014, 42(6): 84-90. 
BAI Junliang, MEI Huawei. Improved similarity based fuzzy clustering algorithm and its application in the PV array power short-term forecasting [J]. Power System Protection and Control, 2014, 42(6): 84-90. 
 

基金

 基金项目:国家自然科学基金项目(51477151);国网浙江省电力有限公司经济技术研究院科研项目(SGZJJY00JJJS1600036)

PDF(3055 KB)

Accesses

Citation

Detail

段落导航
相关文章
AI小编