电力建设 ›› 2013, Vol. 34 ›› Issue (10): 102-106.doi: 10.3969/j.issn.1000-7229.2013.10.020

• 运行与管理 • 上一篇    下一篇

基于高耗能企业参与电网内风电消纳的主动调峰技术

马林东1,葛智平1,张世才1,郭涛1,张顺1,石耀武1,徐锦刚2   

  1. 1.甘肃省电力公司电力科学研究院,兰州市 730050;2.江西省电力公司培训中心,南昌市 330032
  • 出版日期:2013-10-01
  • 作者简介:马林东(1980),男,工学硕士,工程师,主要从事热工自动化、智能电网、火电机组DCS制系统等研究工作,E-mail:mald_lz@126.com; 葛智平(1970),男,工学本科,高级工程师,主要从事热工自动化、风电消纳等研究工作,E-mail:gezhiping@126.com; 张世才(1965), 男,工学本科,工程师,主要从事热工自动化、PLC、智能配用电等研究工作,E-mail:zhangsc@163.com; 郭涛(1974), 男,工学本科,高级工程师,主要从事热工自动化、火电机组深度调峰等研究工作,E-mail:gtao-2011@163.com; 张顺(1984), 男,工学本科,工程师,主要从事热工自动化等研究工作,E-mail:zhangshun-11@163.com; 石耀武(1963), 男,工学本科,高级工程师,主要从事热工自动化、技术监督等研究工作,E-mail:shiyaowu@163.com; 徐锦刚(1984), 男,工学本科,高级工程师,主要从事模糊控制、自适应控制等研究工作,E-mail:sese-xjg@163.com。
  • 基金资助:

    甘肃省电力公司科技项目(2012101024)。

Active Peaking Technology based on High Energy-Consumption Enterprise Participating in Wind Power Accomodation in Power Grid

MA Lindong1, GE Zhiping1, ZHANG Shicai1, GUO Tao1, ZHANG Shun1, SHI Yaowu1,XU Jingang2   

  1. 1. Electric Power Research Institute of Gansu Electric Power Company, Lanzhou 730050, China; 2.Jiangxi Electric Power Corporation Training Center, Nanchang 330032, China
  • Online:2013-10-01

摘要:

随着甘肃风电规模的不断扩大,风电具有的反调峰特性使得电网整体调峰压力日趋严重,为了使电网安全稳定运行,不得不切除部分并网风电机组,造成很大的设备浪费。为此,提出了高耗能企业主动参与风电消纳及电网调峰模式,研究了综合考虑风电价格约束和电网调峰约束下高耗能企业内部转移负荷和增加负荷,利用优化预测函数控制寻优算法求解风电出力波动数值。在Matlab平台下以实际风电数据和高耗能企业可转移负荷为依据进行仿真,结果表明,该调峰技术能够明显平滑风电出力,与传统的调峰模式相比较,高耗能企业主动参与调峰不仅提高风电省内消纳能力,而且能够缓解电网调峰压力,同时在相关电价政策的支持下,高耗能企业可节约用电成本。

关键词: 风电消纳, 电网调峰, 负荷特性, 需求侧管理模式

Abstract:

With the development of wind power scale in Gansu, the feature of anti-peaking of wind power makes the peak regulation of power grid more and more serious. So for the safe and stable operation of power system, part of grid-connected wind turbines have to be removed, which may cause great waste of equipment. In view of the above situation, high energy-consumption enterprises were suggested to actively participate in the wind power consumption and the peak regulation mode of power grid was proposed. Then, the internal transfer load and increasing load in high energy-consumption enterprises were studied with considering the constraints of wind power’s price and peak regulation, and the fluctuations of wind power output were calculated with using optimal prediction function to control optimization algorithm. Finally, simulation research was carried out in Matlab platform, according to the actual wind data and the transfer load of high energy-consuming enterprises. These results show that the wind power output can be smooth. Compared with the traditional peak regulation mode, the active participation in peak regulation of high energy-consumption enterprises can not only improve the wind power consumption capacity in province, but also relieve the pressure of peak regulation of power grid. Meanwhile it can save the electricity cost of high energy-consumption enterprises, in the support of relevant electricity price policy.

Key words: wind power accomodation, peak regulation of power grid, load characteristics, demand side management