福州特高压变电站是特高压电网进入福建的首站,其500 kV主接线方案对省内500 kV电网结构和安全稳定有重要影响。根据福州特高压工程的建设规划和福建500 kV电网特点,分别从电网结构、潮流分布、短路电流、经济性等方面对福州特高压变电站500 kV主接线方案进行了分析。福州特高压500 kV电气主接线方案未采用三分之二接线数与主变数匹配的常规方案,而采用东、西送电通道分列的方案。分析结果表明,采用的方案结合福建电网实际情况,有效地加强了沿海输电通道,较其他方案对未来电网潮流方式变化有更好的适应性,并且还具有投资节省、施工周期短、运行维护方便等优点。

Abstract

As the first station of UHV power grid in Fujian, the 500 kV main connection scheme of Fuzhou UHV substation affects the steady and security of local power grid. According to the construction schedule of Fuzhou UHV substation and the characters of Fujian 500 kV power grid, this paper analyzed the 500 kV main electrical connection of Fuzhou UHV substation, from the aspects of network structure, power flow distribution, short-circuit current, economical efficiency and so on. Instead of traditional scheme in which the number of transformer matches the number of 3/2 unit, the recommended scheme for 500 kV main connection of Fuzhou UHV substation is setting up east and west transmission channel respectively. The analysis results show that the recommended scheme combines the actual situation of Fujian power grid, and can efficiently enhance the power transmit thoroughfare of coastal area. The recommended scheme has a better adaptability to the change of future power flow distribution than other schemes, also has the advantages of investment saving, short construction period, convenient operation and maintenance, etc.

关键词

特高压 / 变电站 / 电气主接线 / 短路电流 / 电网规划

Key words

UHV / substation / main electrical connection / short circuit current / power grid planning

引用本文

导出引用
林毅,林章岁,蒋朋博. 福州特高压变电站500 kV主接线方案优化[J]. 电力建设. 2014, 35(1): 24-29 https://doi.org/10.3969/j.issn.1000-7229.2014.01.005
LIN Yi, LIN Zhangsui, JIANG Pengbo. Scheme Optimization of 500 kV Main Electrical Connection in Fuzhou UHV Substation[J]. Electric Power Construction. 2014, 35(1): 24-29 https://doi.org/10.3969/j.issn.1000-7229.2014.01.005

参考文献

 

[1][著者不详].国家电网总体规划设计[R]. 2009版.北京:国家电网公司,2010.
[2]王葵,尹成竹,沙智明. 济南特高压变电站500 kV主接线方案[J].电力建设, 2010,31(10): 43-49.
[3]邵松涛,葛斌,周海鹏. 淮南1 000 kV特高压变电站电气主接线研究[J].华东电力, 2011,39(6): 41-45.
[4][著者不详].浙北—福州特高压交流工程可行性研究:福州1 000 kV变电站接入系统设计[R]. 上海:华东电力设计院,2012.
[5]郭相国, 沈珊珊. 南昌特高压工程建设必要性及接入系统研究[J]. 中国电力, 2010,43(8):40-44.
[6]刘建坤, 胡亚山, 赵静波,等. 特高压接入对江苏电网的影响展望[J]. 江苏电机工程, 2010,29(1):1-3.
[7]应林志,王建全. 负荷模型对特高压接入浙江电网暂态稳定分析的影响[J]. 华东电力, 2011, 39(1):121-124.
[8]王昊,王展,陈斌. 苏州1 000 kV特高压变电站500 kV电气主接线方案技术经济分析[J]. 电力建设, 2013,34(4):43-46.
[9]李勇,黄宝莹,鲁宗相,等. 基于电网协调发展的特高压变电站电气主接线设计原则[J]. 电力建设, 2011,31(1):27-33.
[10][著者不详].福建省“十二五”主网架滚动规划报告[R]. 福州:福建省电力有限公司电力经济技术研究院, 2012.
[11]林毅. 福州特高压变电站500 kV电气主接线方案优化论证[R]. 福州:福建省电力有限公司电力经济技术研究院, 2013.

基金

国家电网公司科技项目(521300130CSH)。