快速甩负荷功能对于维持电网及大型火电厂稳定运行具有重要的意义,布连电厂660 MW超超临界机组快速甩负荷(fast cut back,FCB)试验时,通过合理调整磨煤机跳闸次序及时间间隔,以及合理控制一、二次风和引风,能够维持良好的炉膛负压及锅炉的正常燃烧。探讨了对高、低压旁路的控制方式,以及汽温、汽压、凝汽器及除氧器水位等重要参数的控制策略,结果显示,各主要参数波动幅度小并能够迅速稳定,验证了控制策略的合理性和逻辑功能设计的完善性,为超超临界机组快速甩负荷试验提供经验借鉴。
Abstract
The function of fast-cut back (FCB) is very important to maintain the stable of power grid and large thermal power plant. In the FCB test of 660 MW ultra-supercritical units in BuLian Power Plant, the normal combustion of boiler and the good furnace pressure could been maintained very well through the reasonable adjustment of coal mill trip order and intervals, as well as the coordination control of primary air, secondary air and induced air. The control method of HP and LP bypass, steam temperature and pressure, water level of condenser and deaerator were also discussed. The results show that the main parameters are fluctuated slightly and can be quickly stabilized. The rationality of control strategy and the integrity of logic function design are verified, which can provide references for the FCB test of ultra-supercritical units.
关键词
动力机械工程 /
超超临界机组 /
快速甩负荷(FCB) /
控制策略
Key words
power and mechanical engineering /
ultra supercritical /
fastcut back (FCB) /
control strategy
郭萌,何亚刚,顾玉春,俞基安,苏乾.
660 MW超超临界机组快速甩负荷控制策略及试验[J]. 电力建设. 2014, 35(9): 97-102 https://doi.org/10.3969/j.issn.1000-7229.2014.09.018
GUO Meng, HE Yagang, GU Yuchun, YU Ji’an, SU Qian.
Control Strategy and Experimental Study of FCB in 660 MW Ultra-Supercritical Units[J]. Electric Power Construction. 2014, 35(9): 97-102 https://doi.org/10.3969/j.issn.1000-7229.2014.09.018
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
参考文献
[1]冯伟忠.900 MW超临界机组FCB试验[J].中国电力,2005,38(2):74-77.
[2]唐军,曲高君.伊朗ARAK电站4×325 MW机组的小岛运行经验[J].动力工程,2006,26(2):238-240.
[3]张跃华,丁晓白,张鲁凡,等.河津电厂350 MW机组FCB性能试验分析[J].电力建设,2002,23(7):9-11.
[4]冯伟忠.1 000 MW超超临界机组FCB试验[J].中国电力,2008,41(10):62-66.
[5]冯伟忠.大机组实现快速甩负荷的现实性和技术分析[J].动力工程,2008,28(4):532-536.
[6]陈浩.600 MW超临界机组FCB处理经验[J].热力发电,2006,35(6):62-64.
[7]吴永存,朱介南.宁海电厂1 000 MW机组RB与FCB控制策略的设计和应用[J].电力建设,2011,21(1):59-63.
[8]王学根,腾卫明,舒畅.通过控制系统改造实现国产600 MW超临界机组FCB功能[J].中国电力,2009,42(10):73-76.
[9]郭萌.国电建投布连电厂一号机组FCB试验报告[R].西安:西北电力建设调试施工研究所,2013.
[10]DL/T 711—1999 汽轮机调节控制系统试验导则[S].
[11]朱介南, 吴永存,罗韶辉,等.1 000 MW机组停机不停炉功能的设计和应用[J].中国电力,2010,43(8):18-21.