[1]国网北京市电力公司. “十三五”北京地区配电网规划—分布式电源专项规划[R].2015.
[2]北京市发展与改革委员会.北京市风能资源开发规划研究报告[R].2015.
[3]刘振亚.中国电力与能源[M].北京:中国电力出版社,2012.
[4]国网北京市电力公司.北京电网2015年度运行方式分析报告[R]. 北京: 国网北京市电力公司,2014.
[5]朱凌志,陈宁,韩华玲. 风电消纳关键问题及应对措施分析[J].电力系统自动化, 2011, 35(22): 29-34.
Zhu Linzhi, Chen Ning, Han Hualing. Key problems and solutions of wind power accommodation[J]. Automation of Electric Power Systems, 2011, 35(22): 29-34.
[6]高宗和,滕贤亮,张小白. 适应大规模风电接入的互联电网有功调度与控制方案[J].电力系统自动化, 2010, 34(17): 37-42.
Gao Zonghe, Teng Xianliang, Zhang Xiaobai. Solution of active power dispatch and control scheme for interconnected power grids with large-scale wind power integration[J]. Automation of Electric Power Systems, 2010, 34(17): 37-42.
[7]周姝灿,耿光超,江全元,等. 极端风情况下风电场群电压协调控制策略[J].电力建设, 2015, 36(3): 7-14.
Zhou Shucai, Geng Guangchao, Jiang Quanyuan, et al. Coordinated voltage control strategy for wind farm clusters under extreme wind conditions[J]. Electric Power Construction, 2015, 36(3): 7-14.
[8]迟永宁,刘燕华,王伟胜. 风电接入对电力系统的影响[J].电网技术, 2007, 31(3): 77-81.
Chi Yongning, Liu Yanhua, Wang Weisheng. Study on impact of wind power accommodation[J]. Power System Technology, 2007, 31(3): 77-81.
[9]周双喜,鲁宗相.风力发电与电力系统[M].北京:中国电力出版社,2011.
[10]王佳明,王智冬,李晖,等. 预防大规模风机连锁脱网事故的区域自动电压控制协调控制策略[J].电力建设, 2014, 35(1): 78-83.
Wang Jiaming, Wang Zhidong, Li Hui, et al. Regional AVC coordinated control strategy for large scale cascading trip-off prevention of wind turbines[J]. Electric Power Construction, 2014, 35(1): 78-83.
[11]孟岩峰,胡书举,邓雅,等. 风电功率预测误差分析及预测误差评价方法[J].电力建设, 2013, 34(7): 6-9.
Meng Yanfeng, Hu Shuju, Deng Ya, et al. Analysis and evaluation method of wind power predicted-error[J]. Electric Power Construction, 2013, 34(7): 6-9. |