[1]欧阳昌裕.规划超前实现2020年非化石能源15%[J].中国电力企业管理,2010(25):16-18.
Ouyang Changyu. Advance Planning to achieve the Non-fossil energy 15% Objective [J]. China Power Enterprise Management, 2010(25): 16-18.
[2]程路,蒋莉萍,白建华,等.实现2020年15%非化石能源目标路径研究[J].中国能源,2010,32(8):9-12.
Cheng Lu, Jiang Liping, Bai Jianhua, et al. Research of the Path to realize the 15% Non-fossil Energy Objective in 2020[J]. Energy of China, 2010, 32(8): 9-12.
[3]张运洲,白建华,程路.中国非化石能源发展目标及其实现路径[M].北京:中国电力出版社,2013.
Zhang Yunzhou, Bai Jianhua, Cheng Lu. Non-fossil energy development objective and realizing route in China[M]. Beijing: China Electric Power Press, 2013.
[4]程路,白建华,贾德香.核电对2020年非化石能源15%目标及电力系统的影响[J].能源技术经济,2011,23(7):10-13.
Cheng Lu, Bai Jianhua, Jia Dexiang. Influence of nuclear power on the 15% non-fossil energy target for 2020 and power system[J]. Energy Technology and Economics, 2011, 23(7): 10-13.
[5]王志轩.论电力适度超前发展[J].中国电力企业管理,2010(16):16-23.
Wang Zhixuan. The appropriate advance development of power industry[J]. China Power Enterprise Management, 2010(16): 16-23.
[6]国家统计局.2014年国民经济和社会发展统计公报[R].北京:国家统计局,2015.
[7]赵庆波,张正陵,白建华,等.基于特高压输电技术的电力规划理论创新及实践[J].中国电机工程学报,2014,34(16):2523-2531.
Zhao Qingbo, Zhang Zhengling, Bai Jianhua, et al. Theory innovation and practice of electric power system planning based on ultra high voltage transmission technology[J]. Proceedings of the CSEE, 2014, 34(16): 2523-2531.
[8]国网能源研究院.十三五完成15%非化石能源发展目标重大举措研究[R].北京:国网能源研究院,2015.
[9]国家发改委.能源发展“十二五”规划[R].北京:国家发改委,2013.
[10]王仲颖,任东明,高虎,等.中国非化石能源之路[M].北京:中国经济出版社,2012.[11]国家能源局.可再生能源发展“十二五”规划[R].北京:国家能源局,2012.
[12]栗然,申雪,钟超,等.考虑环境效益的分布式电源多目标规划[J].电网技术,2014,38(6):1471-1478.
Li Ran, Shen Xue, Zhong Chao, et al. Multi-objective planning of distributed generation considering environmental benefit[J]. Power System Technology , 2014, 38(6): 1471-1478.
[13]张建平,朱忠烈,柳璐,等.大规模风电接入的输电系统价值规划方法[J].电力系统自动化,2014,38(19):47-51.
Zhang Jianping, Zhu Zhonglie, Liu Lu, et al. Transmission network value planning considering large-scale wind power integration[J]. Automation of Electric Power System , 2014, 38(19): 47-51.
[14]彭波,陈旭,徐乾耀,等.面向新能源消纳的电网规划方法初探[J].电网技术,2013,37(12):3386-3391.
Peng Bo, Chen Xu, Xu Qianyao, et al. Preliminary research on power grid planning method aiming at accommodating new energy[J]. Power System Technology , 2013, 37(12): 3386-3391.
[15]谈天夫,高山,李海峰,等.基于等效间隔-频率分布的含风电场电力系统随机生产模拟[J].电工技术学报,2014,29(12):148-157.
Tan Tianfu, Gao Shan, Li Haifeng, et al. Power system probabilistic production simulation based on equivalent interval frequency distribution including wind farms[J]. Transactions of China Electrotechnical Society, 2014, 29(12): 148-157.
[16]吴耀武,邴焕帅,娄素华.含风电场的电力系统中考虑调峰压力平衡的机组检修规划模型[J].电网技术,2012,36(11):94-100.
Wu Yaowu, Bing Huanshuai, Lou Suhua. A unit maintenance scheduling model considering peak regulation pressure balance for power system containing wind farms[J]. Power System Technology , 2012, 36(11): 94-100.
[17]田琦,赵争鸣,韩晓艳.光伏电池模型的参数灵敏度分析和参数提取方法[J].电力自动化设备,2013,33(5):119-124.
Tian Qi, Zhao Zhengming, Han Xiaoyan. Sensitivity analysis and parameter extraction of photovoltaic cell model[J]. Electric Power Automation Equipment, 2013, 33(5): 119-124.
[18]高慧敏,章坚民,江力.基于二阶网损无功灵敏度矩阵的配电网无功补偿选点[J].电网技术,2014,38(7):1979-1983.
Gao Huimin, Zhang Jianmin, Jiang Li. Optimal location of reactive power compensation for distribution network based on second order loss-reactive power sensitivity matrix[J]. Power System Technology, 2014, 38(7): 1979-1983. |