[1]朱凌志,陈宁,韩华玲.风电消纳关键问题及应对措施分析[J].电力系统自动化,2012,35(22):29-34.
Zhu Linzhi, Chen Ning, Han Hualing. Key problem and solutions of wind power accommodation[J]. Automation of Electric Power System, 2012, 35(22): 29-34.
[2]张运洲,白建华,辛颂旭.我国风电开发及消纳相关重大问题研究[J].能源技术经济,2010,22(1):1-6.
Zhang Yunzhou, Bai Jianhua, Xin Songxu. Study on the key issues concerning development and consumption of wind power in China [J]. Energy Technology and Economics, 22(1): 1-6.
[3]张丽英,叶廷路,辛耀中,等.大规模风电接入电网的相关问题及措施[J].中国电机工程学报,2010,30(25):1-9.
Zhang Liying, Ye Tinglu, Xin Yaozhong, et al. Problems and measures of power grid accommodating large scale wind power[J]. Proceedings of CSEE, 2010, 30(25):1-9.
[4]魏晓霞.我国大规模风电接入电网面临的挑战[J].中国能源,2010,32(2):19-21.
Wei Xiaoxia. Challenges of large wind power integrated into the grid[J]. Energy of China, 2010, 32(2):19-21.
[5]张宁,周天睿,段长刚,等.大规模风电场接入对电力系统调峰的影响[J].电网技术,2010,34(1):152-158.
Zhang Ning, Zhou Tianrui, Duan Changgang, et al. Impact of large-scale wind farm connecting with power grid on peak load regulation demand[J]. Power System, 2010, 34(1):152-158.
[6]白建华,辛颂旭,贾德香,等.中国风电开发消纳及输送相关重大问题研究[J].电网与清洁能源,2010,26(1):14-17.
Bai Jianhua, Xin Songxu, Jia Dexiang, et al. Study of major questions of wind power digestion and transmission in China[J].Power System and Clean Energy,2010,26(1):14-17.
[7]贾德香,白建华.风电基地电力外送方式分析[J].能源技术经济,2011,23(10):7-9.
Jia Dexiang, Bai Jianhua. Research on the transmission mode of wind power bases[J]. Energy Technology and Economics, 2011, 23(10): 7-9.
[8]杨柳, 吴鸿亮, 门锟. 南方电网节能与经济运行评价方法[J]. 电力系统自动化,2014,38(17):31-37,86.
Yang Liu, Wu Hongliang, Men Kun. An energy saving and economy operation evaluation method for China Southern Power Grid[J]. Automation of Electric Power System, 2014, 38(17): 31-37, 86.
[9]康重庆,夏清,相年德,等. 随机生产模拟的序列化分析.中国电机工程学报,2002, 22(9):8-12.
Kang Chongqing, Xia Qing, Xiang Niande, et al. Sequence-based analysis of probabilistic production cost simulation[J]. Proceedings of CSEE, 2002, 22(9):8-12.
[10]Zhang N, Kang C, Xia Q, et al. Modeling conditional forecast error for wind power in generation scheduling[J]. IEEE Trans on Power Systems, 2014, 29(3): 1316-1324.
[11]Zhang N, Kang C, Duang C, et al. Simulation methodology of multiple wind farms operation considering wind speed correlation [J]. International Journal of Power and Energy Systems, 2010, 30(4): 264-173.
[12]Zhang N, Kang C, Xu Q, et al. Modeling and simulating the spatio-temporal correlations of clustered wind power using copula [J]. Journal of Electrical Engineering & Technology, 2013, 8(6):1615-1625. |