基于适应度指标的输电网发展方案选取方法

陈为化1,刘连光1,陈艳伟2   

  1. 1. 新能源电力系统国家重点实验室(华北电力大学),北京市 102206;2.国网山西省电力公司太原供电公司,太原市 030012
  • 出版日期:2015-10-01
  • 作者简介:陈为化(1978),男,博士,主要研究方向为电力系统分析与规划; 刘连光(1954),男,教授,博士生导师,主要研究方向为电力系统分析与规划,电网安全防御与灾变控制; 陈艳伟(1988),男,硕士研究生,主要研究方向为电力系统分析与规划。
  • 基金资助:

    国家自然科学基金项目(51577058);国家电网公司大电网重大专项课题(SGCC-MPLG019-2012)。

Selection Method of Transmission Network Development Scheme Based on Fitness Index

CHEN Weihua1,LIU Lianguang1,CHEN Yanwei2   

  1. 1. State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources ,North China Electric Power University, Beijing 102206, China;2. Taiyuan Power Supply Company, State Grid Shanxi Electric Power Company,Taiyuan 030012, China
  • Online:2015-10-01
  • Supported by:

    Project Supported by National Natural Science Foundation of China(NSFC)(51577058).

摘要:

在输电网发展方案选取方面,电网的发展、调度等部门往往侧重点不同,采取的评价指标与方法也不同,难以形成客观、全面、统一的发展方案,造成电网规划、建设、运行等环节出现矛盾。针对上述问题,提出了一种基于适应度和证据理论的输电网发展方案选取方法。建立适应度概念来定量评价电网发展的程度,用证据理论整合了安全性、经济性等各方面电网适应度,得到的可选性参数为输电网发展方案的选取提供了依据。该方法能够解决输电网发展方案选取上各部门难以协调一致的问题,对实际电网发展方案选取的模拟表明了该方法的可行性和有效性。

关键词: 输电网, 规划, 方案选取, 适应度, 证据理论

Abstract:

There are different evaluation indexes and methods for the development scheme selection of transmission network between development department and dispatch department of power grid based on different emphasis points. So it is difficult to form an objective, comprehensive, unified development scheme, which will cause contradiction among transmission networks planning, construction, operation and other aspects. In view of the above problems, this paper presented a selection method for transmission network development scheme based on fitness and evidence theory. The concept of fitness was established to quantitatively evaluate the development degree of power grid, and the evidence theory was used to integrate the aspects of safety, economy and other fitness indexes;the obtained parameters could provide the basis for the development scheme selection of transmission network. The proposed method can solve the coordinate problem of transmission network development scheme selection in different developments. The simulation of actual power grid development scheme selection shows the feasibility and validity of this method.

Key words:  transmission network, planning, scheme selection, ;evidence theory