[1] 刘振亚.全球能源互联网[M].北京:中国电力出版社,2015:271-278.
[2] 杜至刚,牛林,赵建国.发展特高压交流输电,建设坚强的国家电网[J].电力自动化设备, 2007, 27(5): 1-5.
Du Zhigang, Niu Lin, Zhao Jianguo. Developing UHV AC transmission and constructing strong state power grid[J]. Electric Power Automation Equipment, 2007, 27(5):1-5.
[3] 贾宏杰, 穆云飞, 余晓丹. 对我国综合能源系统发展的思考[J]. 电力建设, 2015,36(1):1-10.
Jia Hongjie, Mu Yunfei, Yu Xiaodan.Thought about the integrated energy in China[J]. Electric Power Construction, 2015, 36(1): 1-10.
[4]郭媛媛,崔博源,王承玉,等. 1 100 kV/63 kA 气体绝缘金属封闭开关设备的研制[J]. 电网技术, 2011, 35(12): 20-25.
GuoYuanyuan, Cui Boyuan, Wang Chengyu, et al. Development and implementation of gas-insulated metal-enclosed switchgear with breaking capability of 63 kA for 1 100 kV AC power transmission project[J]. Power System Technology, 2011, 35(12): 20-25.
[5] 刘振亚. 特高压交直流电网[M]. 北京: 中国电力出版社, 2013: 331-339.
[6] 冯庆东, 韩先第. 1 000 kV气体绝缘金属封闭开关设备[J].电力设备, 2005, 6(4):23-25.
Feng Qingdong, Han Xiandi.1 000 kV gas insulation switchgear[J].Electric Equipment, 2005,6(4):23-25.
[7] 钱家骊,袁大陆,徐国政. 对1 000 kV 电网操作过电压及相位控制高压断路器的讨论[J]. 电网技术, 2005, 29(10): 1-4.
Qian Jiali, Yuan Dalu, Xu Guozheng. Discussion on switching overvoltage in 1 000 kV power networks and phase controlled circuit breaker[J]. Power System Technology, 2005, 29(10): 1-4.
[8] 董新洲,苏斌,薄志谦,等.特高压输电线路继电保护特殊问题的研究[J].电力系统自动化, 2004, 28(24): 19-22.
Dong Xinzhou, Su Bin, Bo Zhiqian,et al. Study of special problems on protective relaying of UHV transmission line[J]. Automation of Electric Power Systems, 2004, 28(24): 19-22.
[9] 邬雄. 1 000 kV级交流输电线路电磁环境的研究[J].电力设备, 2005, 12(6):24- 27.
Wu Xiong. Study on electromagnetic environment for 1 000 kV AC power transmission line [J]. Electrical Equipment, 2005, 12(6): 24-27.
[10] 李扬, 李永丽. 750 kV及特高压输电线路的暂态电流研究[J]. 电力系统及其自动化学报, 2006, 18(3):18-23.
Li Yang, Li Yongli. Research on transient current of 750 kV and UHV transmission line[J].Proceedings of the CSU-EPSA, 2006, 18(3): 18-23.
[11] 周浩.特高压交直流输电技术[M].杭州:浙江大学出版社,2014:91-104.
[12] 索南加乐,梁振锋,宋国兵. 自适应熄弧时刻的单相重合闸的研究[J]. 电力系统保护与控制, 2012, 40(5): 37-41.
Suonan Jiale, Liang Zhenfeng, Song Guobing. Study of single-phase reclosure with adaptive secondary arc extinction[J]. Power System Protection and Control, 2012, 40(5): 37-41.
[13] 赵丽华,郭相国,高进强. 1 000 kV电气主接线设计[J]. 电力建设, 2010, 31(4): 13-16.
Zhao Lihua, Guo Xiangguo, Gao Jinqiang. 1 000 kV main electrical connection design [J]. Electric Power Construction, 2010, 31(4): 13-16.
[14] 徐国丰,黄民翔,韩辉,等. 基于RAMSES的特高压电网可靠性充裕度评估[J]. 电力自动化设备, 2012, 32(6): 99-102.
Xu Guofeng, Huang Minxiang, Han Hui,et al. Reliability adequacy evaluation based on RAMSES for UHV power grid [J]. Electric Power Automation Equipment, 2012, 32(6): 99-102.
[15] 张广顺,赵巍巍. 断路器失灵保护的技术探讨[J]. 电力设备, 2007, 8(2): 73-75.
Zhang Guangshun, Zhao Weiwei. Technical discussion of out of order protection for circuit breaker[J].Electrical Equipment, 2007, 8(2): 73-75.
[16] 秦川. 高压断路器非全相保护浅析[J]. 四川电力技术,2011, 34(4): 79-82.
Qin Chuan.Analysis on open-phase protection for high-voltage circuit breaker[J]. Sichuan Electric Power Technology, 2011, 34(4): 79-82.
[17] GB/T 29323—2012 1 000 kV断路器保护装置技术要求[S]. 北京: 中国标准出版社, 2012. |