[1]崔巍, 都秀文, 杨海峰. 供电公司投资规模模型研究[J].电力建设,2013, 34(8): 27-33.
CUI Wei, DU Xiuwen, YANG Haifeng. Investment scale model of power supply company[J]. Electric Power Construction, 2013, 34(8): 27-33.
[2]郑琳. 电网建设项目投资优化管理方法与应用[J]. 电力建设, 2011, 32(1): 104-107.
ZHENG Lin. Optimal management method and its application in grid project portfolio[J]. Electric Power Construction, 2011, 32(1): 104-107.
[3]赵俊光, 雷波, 聂崇峡,等. 投资效益分析法在电网规划中的应用推广[J]. 电力建设, 2008, 29(10): 83-86.
ZHAO Junguang, LEI Bo, NIE Chongxia, et al. Promotion of application of investment-benefit analysis in grid planning[J]. Electric Power Construction, 2008, 29(10): 83-86.
[4]曾鸣, 韩蕊, 刘宏志,等. 无电地区电网投资风险识别及投资模式[J]. 电力建设, 2014, 35(02): 23-27.
ZENG Ming , HAN Rui, LIU Hongzhi, et al. Risk identification and model of power grid investment in regions without electricity[J]. Electric Power Construction, 2014, 35(02): 23-27.
[5]崔巍, 崔莹莹, 杨海峰. 电网专项领域投资决策模型[J]. 电力建设, 2013, 34(10): 112-117.
CUI Wei, CUI Yingying, YANG Haifeng. Investment decision model in special fields for power grid[J]. Electric Power Construction, 2013, 34(10): 112-117.
[6]张铁峰, 苑津莎, 郭伟. 基于数据包络分析的配电网投资项目经济评价[J]. 电力建设, 2005, 26(7): 68-70.
ZHANG Tiefeng, YUAN Jinsha, GUO Wei. Economic Evaluation on distribution investment project by DEA[J]. Electric Power Construction, 2005, 26(7): 68-70.
[7]曾鸣, 王致杰, 刘珊珊,等. 无电地区电网建设项目投资效益后评价[J]. 电力建设, 2014, 35(5): 108-112.
ZENG Ming, WANG Zhijie, LIU Shanshan, et al. Post-evaluation of investment benefit for grid construction project in regions without electricity[J]. Electric Power Construction, 2014, 35(5): 108-112.
[8]方略, 程浩忠, 柳璐,等. 基于多指标体系的10 kV配电网投资分配评价[J]. 华东电力, 2014, 42(6): 1092-1097.
FANG Lue, CHENG Haozhong, LIU Lu, et al. evaluation of 10 kV distribution Network investment allocation based on multi-index system[J]. East China Electric Power, 2014, 42(6): 1092-1097.
[9]董军, 马博. 考虑社会效益的电网最优投资组合模型研究[J]. 运筹与管理, 2010, 19(4): 131-135.
DONG Jun, MA Bo. Study of optimal portfolio model for electric grid projects with social benefits[J]. Operation Research and Management Science, 2010, 19(4): 131-135.
[10]李如忠, 舒琨. 基于基尼系数的水污染负荷分配模糊优化决策模型[J].环境科学学报, 2010, 30(7): 1518-1526.
LI Ruzhong, SHU Kun. Fuzzy optimization model for waste load allocations based on the Gini coefficient[J]. Acta Scientiae Circumstantiae, 2010, 30(7): 1518-1526.
[11]张琳, 陈逸, 张群, 等. 基于基尼系数的耕地保有量分配优化模型[J]. 经济地理, 2012, 32(6): 132-137.
ZHANG Lin, CHEN Yi, ZHANG Qun, et al. Optimization model for cultivated land allocations based on the Gini coefficient[J]. Economic Geography, 2012, 32(6): 132-137.
[12]戴俊良, 王鹏, 王轩, 等. 基于基尼系数的电力调度公平性指标探讨[J]. 电力系统自动化, 2008, 32(2): 26-29.
DAI Junliang, WANG Peng, WANG Xuan, et al. Discussion on impartiality index of power dispatching based on Gini coefficient[J]. Automation of Electric Power Systems, 2008, 32(2): 26-29.
[13]BURN D H, LENCE B J. Comparison of optimization formulations for waste-load allocations[J]. Journal of Environmental Engineering, 1992, 118(4): 597-612.
[14]王丽琼. 基于公平性的水污染物总量分配基尼系数分析[J]. 生态环境, 2008, 17(5): 1796-1801.
WANG Liqiong. Analysis of total pollutant load allocation for water bodies Gini coefficient based on equity[J]. Ecology and Environment, 2008, 17(5): 1796-1801.
[15]BURN D H, MCBEAN E A. Optimization modeling of water quality in an uncertain environment[J]. Water Resources Research, 1985, 21(7): 934-940. |