摘要

发电企业的多种电源的协调安排能够达到企业运营效益的整体优化,而这种协调安排在市场条件下则更强调其风险和效益双重目标的实现。基于提高发电企业自主发电计划安排能力和实现企业增收避险的企业价值目标,该文对风、水、燃气三源互补发电的中长期发电计划进行了风险效益评估研究。首先,借助混合整数规划和随机规划理论,构建了发电计划中长期随机规划模型的目标函数,以及各机组运行约束,在其中重点构建了风-功、水-功转换约束;其次,基于双边合约市场和金融风险的市场规制条件,对发电企业的机组协调和风险规避策略进行了模型约束设计;再次,设计了基于拉格朗日乘数的模型算法流程和解决方案;最后,设计了3类电源机组的联合运营发电计划算例,利用蒙特卡洛设计情景模拟,实现了对不同发电安排的运营模拟和测算。算例验证了随机规划模型的可行性,该模型能够在不确定性环境和市场化条件下优化发电企业计划安排和机组协调能力,并能够帮助企业制定合理的收益预期并有效规避风险。

Abstract

 The coordination of multiple power units for power generation companies could achieve the overall optimization of operational efficiency. Under market conditions, it is more important to achieve dual goals of risk and benefit for generation plan. Based on the goals of increasing the capacity of power generation schedule and increasing enterprise' value hedge, this paper studies the risk-benefit assessment for the medium and long-term plan of wind-hydro-gas complementary power generation. Firstly, with the mixed integer programming and stochastic programming theory, we construct the objective function of the stochastic programming model for medium and long-term power generation plan and unit operating constraints, in which the wind-power and water-power switch equation constraints are especially constructed. Secondly, based on the market rules conditions of bilateral contract market and financial risk, we design the model constraints for the coordination of power generation units and risk mitigation strategies. Then, we design the model algorithm process and solution based on Lagrange multiplier. Finally, with a cooperation-operation generation plan example of three types of power units, we simulate and calculate different power generation plans in Monte Carlo scenarios. The example verifies the feasibility of stochastic programming model, which can optimize the power generation schedule of and unit coordination ability in the uncertain environment and market conditions, and help companies develop reasonable benefit expectations and effectively avoid risks.

关键词

风险决策 / 效益评估 / 多源互补 / 双边合约

Key words

risk decision-making / benefit assessment / multi-source complementary / bilateral contract

引用本文

导出引用
毕平平. 考虑风、水、燃气互济的中长期发电计划风险效益评估[J]. 电力建设. 2016, 37(3): 105-111 https://doi.org/10.3969/j.issn.1000-7229.2016.03.016
BI Pingping. Risk-Benefit Assessment of Medium and Long-Term Power Generation Plan Considering Wind-Hydro-Gas Complementary[J]. Electric Power Construction. 2016, 37(3): 105-111 https://doi.org/10.3969/j.issn.1000-7229.2016.03.016
中图分类号: TM 71         

参考文献


[1]王永强,周建中,莫莉,等.基于机组综合状态评价策略的大型水电站精细化日发电计划编制方法[J].电网技术,2012,36(7):94-99.
WANG Yongqiang, ZHOU Jianzhong, MO Li,et al. Optimal power generation mix towards an emission target[J]. Power System Technology,2012,36(7):94-99.
[2]丁恰,李利利,汪洋,等.适应大规模风电接入的发电计划不确定性处理方法分析[J].中国电力,2015,48(3):127-132.
DING Qia, LI Lili, WANG Yang, et al. Analysis of uncertainty management technology for lager-scale wind power integration in generation scheduling [J].Electric Power,2015,48(3):127-132.
[3]KANG M C, SOHN J M, PARK J Y, et al. Development of algorithm for day ahead PV generation forecasting using data mining method[C]//2011 IEEE 54th International Midwest Symposium on Circuits and Systems (MWSCAS). Seoul :IEEE,2011:1-4.
[4]SCHAFER A, BAUMANNS P,MOSER A.Modeling heat pumps as combined heat and power plants in energy generation planning[C]//2012 IEEE Energytech. Cleveland :IEEE,2012:1-6.
[5]谢丽荣,张勇,王岗,等.中短期多周期发电计划的协调方式和闭环控制[J].电力系统自动化,2014,38(10):126-131.
XIE Lirong, ZHANG Yong, WANG Gang, et al. Coordination method and closed-loop control of medium-short term multi-cycle generation scheduling[J]. Automation of Electric Power Systems,2014,38(10):126-131.
[6]MA C F,ZHAO C H,LI Z,et al. Research on the influence of forecasting precision to the hydro-wind generation coordinated operation[C]//2011 4th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies(DRPT).Weihai :IEEE,2011:1803-1807.
[7]王彩霞,乔颖,鲁宗相,等.低碳经济下风火互济系统日前发电计划模式分析[J].电力系统自动化,2011,35(22):111-117.
WANG Caixi, QIAO Ying, LU Zongxiang, et al.Day-ahead dispatch mode for wind-thermal power system in low-carbon economy[J]. Automation of Electric Power Systems,2011,35(22):111-117.
[8]白杨,钟海旺,夏清,等.电量协调与成本控制的日内滚动发电计划[J].电网技术,2013,37(10):2965-2972.
BAI Yang, ZHONG Haiwang, XIA Qing, et al.An intraday rolling scheduling with unit energy coordination and operating cost control [J].Power System Technology,2013,37(10):2965-2972.
[9]施磊,耿照为,张晶,等.风险适应型的月度发电计划管理模式[J].电网技术,2014,38(12):3384-3389.
SHI Lei, GENG Zhaowei, ZHANG Jing, et al. Risk-adaptable monthly generation scheduling mode[J]. Power System Technology, 2014,38(12):3384-3389.
[10]HEREDIA F J,RIDER M J,CORCHERO C.A stochastic programming model for the optimal electricity market bid problem with bilateral contracts for thermal and combined cycle units[J].Annals of Operations Research,2012,193(1):107-127.
[11]YUAN C,LI F,KURI B.Optimal power generation mix towards an emission target[C]//Power & Energy Society General Meeting. San Diego: IEEE,2011:1-7.
[12]王彩霞,鲁宗相.风电功率预测信息在日前机组组合中的应用[J].电力系统自动化,2011,35(7):13-18.
WANG Caixi, LU Zongxiang.Unit commitment based on wind power forecast[J].Automation of Electric Power Systems,2011,35(7):13-18.
[13]张娜,吕泉,张显,等.含风电系统的多级机组组合协调制定策略[J].电力系统自动化,2013,37(11):39-45,98.
ZHANG Na, LV Quan, ZHANG Xian, et al. A realization solution of key links for merging unit in smart substation [J]. Automation of Electric Power Systems,2013,37(11):39-45,98.
[14]黎灿兵,吕素,曹一家,等.面向节能发电调度的日前机组组合优化方法[J].中国电机工程学报,2012,32(16):70-76.
LI Canbing, Lü Su, CAO Yijia, et al. A new method for day-ahead unit commitment based on energy-saving generation dispatching[J].Proceedings of the CSEE,2012,32(16):70-76.
[15]周明,夏澍,李琰,等.含风电的电力系统月度机组组合和检修计划联合优化调度[J].中国电机工程学报,2015,35(7):1586-1595.
ZHOU Ming, XIA Shu, LI Yan, et al. A joint optimization approach on monthly unit commitment and maintenance scheduling for wind power integrated power systems [J]. Proceedings of the CSEE, 2015,35(7):1586-1595.
[16]YANG L,JIAN J,WANG Y,et al.Projected mixed integer programming formulations for unit commitment problem[J].International Journal of Electrical Power & Energy Systems,2015,68:195-202.
[17]GOVARDHAN M,ROY R.Economic analysis of unit commitment with distributed energy resources[J]. International Journal of Electrical Power & Energy Systems,2015,71:1-14.
[18]DE JONGHE C,HOBBS B F,BELMANS R.Value of price responsive load for wind integration in unit commitment [J].IEEE Transactions on Power Systems, 2014,29(2):675-685.
[19]SOBER L.Simulation of wind speed forecast errors for operation planning of multiage power systems [C]//2004 International Conference on Probabilistic Methods Applied to Power Systems. Ames : IEEE, 2004:723-728

基金