[1] 张冬霞,姚良忠,马文媛.中外智能电网发展战略[J].中国电机工程学报,2013,33(31):1-15.
ZHANG Dongxia,YAO Liangzhong,MA Wenyuan,et al.Development strategies of smart grid in China and abroad[J].Proceedings of the CSEE,2013,33(31):1-15.
[2]赵军.解读生物能源:新能源产业及对环境、生态与社会经济发展的影响[J].中国科学院院刊,2012,27(2):219-225.
ZHAO Jun.Bioenergy as a new energy industry: insights into its impact on environmental, ecological, social and economic future[J].Bulletin of the Chinese Academy of Sciences,2012,27(2):219-225.
[3]董福贵,张也,尚美美.分布式能源系统多指标综合评价研究[J].中国电机工程学报,2016,36(12):3214-3223.
DONG Fugui,ZHANG Ye,SHANG Meimei.Multi-criteria comprehensive evaluation of distributed energy system[J].Proceedings of the CSEE,2016,36(12):3214-3223.
[4]邱威,张建华,刘念.含大型风电场的环境经济调度模型与解法[J].中国电机工程学报,2011,31(19):8-16.
QIU Wei,ZHANG Jianhua,LIU Nian.Model and solution for environmental/economic dispatch considering large-scale wind power penetration[J].Proceedings of the CSEE,2011,31(19):8-16.
[5]刘旭,杨德友,孟涛,等.计及需求响应的含风电场日前两阶段动态环境经济调度[J].电力建设,2016,37(9):146-154.
LIU Xu,YANG Deyou,MENG Tao,et al.Day-ahead tow-stage dynamic economic emission dispatching in wind power integrated system incorporating demand response[J].Electric Power Construction,2016,37(9):146-154.
[6]文旭,王俊梅,郭琳,等.计及污染气体排放风险的多目标随机动态环境经济调度模型[J].电力自动化设备,2015,35(5):131-138.
WEN Xu,WANG Junmei,GUO Lin,et al.Multi-objective stochastic and dynamic model of environmental and economic dispatch considering gas pollution emission risk[J].Electric Power Automation Equipment,2015,35(5):131-138.
[7]GHOLAMI A, ANSARI J, JAMEI M, et al. Environmental/economic dispatch incorporating renewable energy sources and plug-in vehicles[J]. IET Generation, Transmission & Distribution, 2014, 8(12): 2183-2198.
[8]刘扬洋,蒋传文,谭胜敏,等.考虑风险调整资本收益率阈值约束的虚拟电厂优化调度策略[J].中国电机工程学报,2016,36(17):4617-4627.
LIU Yangyang,JIANG Chuanwen,TAN Shengmin,et al.Optimal dispatch of virtual power plant considering risk adjusted return on capital constraints[J].Proceedings of the CSEE,2016,36(17):4617-4627.
[9]乐键,柳永妍,叶曦,等.含高渗透率分布式电能资源的区域电网市场化运营模式[J].中国电机工程学报,2016,36(12):3343-3353.
LE Jian,LIU Yongyan,YE Xi,et al.Market-oriented operation pattern of regional power network integration with high penetration level of distributed energy resources[J].Proceedings of the CSEE,2016,36(12):3343-3353.
[10]PUDJIANTO D, RAMSAY C, STRBAC G. Virtual power plant and system integration of distributed energy resources[J]. IET Renewable Power Generation, 2007, 1(1): 10-16.
[11]PANDZIC H, MORALES J M, CONEJO A J, et al. Offering model for a virtual power plant based on stochastic programming[J]. Applied Energy, 2013, 105: 282-292.
[12]王海冰,王简,王承民,等.计及风险约束的虚拟电厂能量管理建模[J/OL].中国电机工程学报,2017,http://www.cnki.net/kcms/detail/11.2107.TM.20170217.1049.005.html. DOI: 10.13334/j.0258-8013.pcsee.161533.
WANG Haibing,WANG Jian,WANG Chengmin,et al.Risk-constrained energy management modeling of virtual power plant[J/OL].Proceedings of the CSEE,2017,http://www.cnki.net/kcms/detail/11.2107.TM.20170217.1049.005.html. DOI: 10.13334/j.0258-8013.pcsee.161533.
[13]DIVENYI D, DAN A M. Agent-based modeling of distributed generation in power system control[J]. IEEE Transactions on Sustainable Energy, 2013, 4(4): 886-893.
[14]范松丽, 艾芊, 贺兴. 基于机会约束规划的虚拟电厂调度风险分析[J]. 中国电机工程学报,2015,35(16): 4025-4034.
FAN Songli,AI Qian,HE Xing.Risk analysis on dispatch of virtual power plant based on chance constrained programming[J].Proceedings of the CSEE,2015,35(16):4025-4034.
[15]刘继春,唐虎,向月,等.考虑多个虚拟发电厂参与的多阶段市场交易方法[J].电力建设,2017,38(3):137-144.
LIU Jichun,TANG Hu,XIANG Yue.Multi-stage market transaction method with participation of virtual power plants[J].Electric Power Construction,2017,38(3):137-144.
[16]SKARVELIS-KAZAKOS S, PAPADOPOULOS P, GRAU I, et al. Carbon optimized virtual power plant with electric vehicles[C]// 2010 45th International Universities Power Engineering Conference (UPEC). Cardiff, United Kingdom: IEEE, 2010: 1-6.
[17]XIA Y, LIU J, HUANG Z, et al. Carbon emission impact on the operation of virtual power plant with combined heat and power system[J]. Frontiers of Information Technology & Electronic Engineering, 2016, 17(5): 479-488.
[18]HUANG C, YUE D, XIE J, et al. Economic dispatch of power systems with virtual power plant based interval optimization method[J]. CSEE Journal of Power and Energy Systems, 2016, 2(1): 74-80.
[19]KOLTER Z. Convex optimization overview[EB/OL].(2007-10-19)[2017-04-14]. https://see.stanford.edu/materials/aimlcs229/cs229-cvxopt.pdf.
[20]孙晚华,等.ILOG CPLEX与铁道运输优化[M]. 北京:中国铁道出版社,2014:10-15.
[21]LOFBERG J.YALMIP:A toolbox for modeling and optimization in MATLAB[C]//2004 IEEE International Symposium on Computer Aided Control Systems Design. Taiwan: IEEE,2004:284-289.
|