摘要

 摘要:随着分布式电源(distributed generation,DG)渗透率在主动配电网(active distribution network,ADN)中不断增加,配电网运行规划难度也不断提高。尤其是故障时配电网形成孤岛运行后,DG出力与负荷需求分配不均,供电效率下降的情况居多。该文针对以上问题对主动配电网故障后孤岛运行展开研究,考虑DG的间歇性出力对其建立概率模型,同时对需求侧负荷进行时序性建模,提出一种基于多时段DG-负荷有功功率平衡的孤岛划分方法。在DG出力不足的情况下,根据负荷优先级和可控度采用遗传算法进行最优切负荷,精准切除优先级低的负荷,保证多负荷、重要负荷供电。最后通过PG&E 69配电网算例验证所提方法的有效性和可行性,结果显示,该方法能在一定程度上有效增加孤岛供电范围。 
 

Abstract

 摘要:随着分布式电源(distributed generation,DG)渗透率在主动配电网(active distribution network,ADN)中不断增加,配电网运行规划难度也不断提高。尤其是故障时配电网形成孤岛运行后,DG出力与负荷需求分配不均,供电效率下降的情况居多。该文针对以上问题对主动配电网故障后孤岛运行展开研究,考虑DG的间歇性出力对其建立概率模型,同时对需求侧负荷进行时序性建模,提出一种基于多时段DG-负荷有功功率平衡的孤岛划分方法。在DG出力不足的情况下,根据负荷优先级和可控度采用遗传算法进行最优切负荷,精准切除优先级低的负荷,保证多负荷、重要负荷供电。最后通过PG&E 69配电网算例验证所提方法的有效性和可行性,结果显示,该方法能在一定程度上有效增加孤岛供电范围。 
 

关键词

  / 关键词:主动配电网 / 孤岛划分 / 多时段 / 最优切负荷 / 分布式电源 / 负荷时序  /

 
/

Key words

 关键词:主动配电网 / 孤岛划分 / 多时段 / 最优切负荷 / 分布式电源 / 负荷时序 

引用本文

导出引用
刘会家,程璐瑶,黄景光,吴巍,管鑫,黄泰相.  考虑间歇性DG与负荷响应的多时段主动配电网孤岛划分 [J]. 电力建设. 2018, 39(2): 50 https://doi.org/10.3969/j.issn.1000-7229.2018.02.007
LIU Huijia, CHENG Luyao, HUANG Jingguang, WU Wei, GUAN Xin, HUANG Taixiang.
Islanding of Multi Period Active Distribution  Network Considering   Intermittent DG and Load Response  
[J]. Electric Power Construction. 2018, 39(2): 50 https://doi.org/10.3969/j.issn.1000-7229.2018.02.007
中图分类号:      TM 712   

参考文献

 [1]钟清.主动配电网知识读本[M].北京:中国电力出版社,2014. 
[2]赵波,王财胜,周金辉,等.主动配电网现状与未来发展[J].电力系统自动化,2014,38(18):125-135.  ZHAO Bo, WANG Caisheng, ZHOU Jinhui, et al. Present and future development trend of active distribution network [J]. Automation of Electric Power Systems , 2014, 38 (18):125-135. 
[3]陈汝斯,林涛,余光正,等.计及电能质量影响的智能配电网孤岛划分策略[J].电工技术学报,2016,31(S2):150-158.  CHEN Rusi, LIN Tao, YU Guangzheng, et al. Island separation strategy of smart distribution grid considering the effects of power quality factors [J]. Transactions of China Electrotechnical Society, 2016, 31 (S2):150-158.  
[4]王旭东,林济铿.基于分支定界的含分布式发电配电网孤岛划分[J].中国电机工程学报,2011,31(7):16-20.  WANG Xudong, LIN Jikeng. Island partition of the distribution system with distributed generation based on branch and bound algorithm [J]. Proceedings of the CESS, 2011, 31 (7): 16-20. 
[5]李滨,祝靖,李佩杰,等.含非可靠分布式电源的配电网孤岛划分[J].电力系统自动化,2015,39(8):59-65.  LI Bin, ZHU Jing, LI Peijie, et al. Island partition of distribution network with unreliable distribution generators [J]. Automation of Electric Power Systems, 2015,39(8): 59-65. 
[6]李振坤,周伟杰,王坚敏,等.基于风光荷功率曲线的有源配电网动态孤岛划分方法[J].电力系统自动化,2016,40(14):58-64.  LI Zhenkun, ZHOU Weijie, WANG Jianmin, et al. Dynamic islanding method of active distribution network based on wind-photovoltaic-load curve [J]. Automation of Electric Power Systems, 2016, 40 (14): 58-64. 
[7]胡哲晟,郭瑞鹏,蓝海波,等.基于有向图的含分布式电源配电网孤岛划分模型[J].电力系统自动化,2015,39(14):97-104.  HU Zhecheng, GUO Ruipeng, LAN Haibo, et al. Islanding model of distribution systems with distributed generators based on directed graph [J]. Automation of Electric Power Systems, 2015, 39(14): 97-104. 
[8]刘舒,张益飞,程浩忠,等.考虑负荷响应的主动配电网孤岛划分[J].现代电力,2015,32(6):23-29.  LIU Shu, ZHANG Yifei, CHENG Haozhong, et al. Islanding partition in active distribution network by considering load response [J]. Modern Electric Power, 2015, 32 (6): 23-29. 
[9]高红均,刘俊勇.考虑不同类型DG和负荷建模的主动配电网协同规划[J].中国电机工程学报,2016,36(18):4911-4922.  GAO Hongjun, LIU Junyong. Coordinated planning considering different types of DG and load in active distribution network [J]. Proceedings of the CESS, 2016, 36 (18): 4911-4922. 
[10]钟清,余南华,孙闻,等.主动配电网分布式电源规划及经济性分析[J].电力系统及其自动化学报,2014,26(11):82-86.  ZHONG Qing, YU Nanhua, SUN Wen, et al. Distribution generation programming and economical analysis of active distribution network [J]. Proceedings of the CSU-EPSA , 2014, 26 (11): 82-86. 
[11]杨天,王京波,宋少帅,等.考虑风速相关性的电力系统动态经济调度[J].电工技术学报,2016,31(16):189-197.  YANG Tian, WANG Jingbo, SONG Shaoshuai, et al. Dynamic economic dispatch of power systems considering correlation of the wind speed [J]. Transactions of China Electrotechnical Society, 2016, 31 (16):189-197.  
[12]于乐.含分布式能源的配电系统可靠性分析研究[D].南京:东南大学,2015.  YU Le. Reliability analysis of distribution network with distributed energy resources[D]. Nanjing: Southeast University, 2015. 
[13]朱兰,严正,杨秀,等.计及需求侧响应的微网综合资源规划方法[J].中国电机工程学报,2014,34(16):2621-2628.  ZHU Lan, YAN Zheng, YANG Xiu, et al. Integrated resource planning in microgrid based on modeling demand response [J]. Proceedings of the CESS, 2014, 34 (16): 2621-2628. 
[14]朱星阳,张建华,刘文霞,等.考虑负荷电压静特性的含分布式电源的配电网潮流计算[J].电网技术,2012,36(2):217-223.  ZHU Xingyang, ZHANG Jianhua, LIU Wenxia, et al. Power flow calculation of distribution systems with distributed generation considering static load characteristics [J]. Power System Technology, 2012, 36 (2): 217-223. 
[15]丁明,林玉娟,潘浩.考虑负荷与新能源时序特性的随机生产模拟[J].中国电机工程学报,2016,36(23):6305-6314.  DING Ming, LIN Yujuan, PAN Hao. Probabilistic production simulation considering time sequence characteristics of load and new energy[J]. Proceedings of the CESS, 2016, 36(23):6305-6314. 
[16]钟清,孙闻,余南华,等.主动配电网规划中的负荷预测与发电预测[J].中国电机工程学报,2014,34(19):3050-3056.  ZHONG Qing, SUN Wen, YU Nanhua, et al. Load and power forecasting in active distribution network planning [J]. Proceedings of the CESS, 2014, 34 (19): 3050-3056. 
[17]王成山,孙充勃,李鹏.主动配电网优化技术研究现状及展望[J].电力建设,2015,36(1):8-15.  WANG Chengshan, SUN Chongbo, LI Peng. Review and perspective on the optimization of active distribution network[J]. Electric Power Construction, 2015, 36 (1): 8-15. 
[18]邢海军,程浩忠,张沈习,等.主动配电网规划研究综述[J].电网技术,2015,39(10):2705-2711.  XING Haijun, CHENG Haozhong, ZHANG Shenxi, et al. Review of active distribution network planning [J]. Power System Technology, 2015, 39 (10): 2705-2711. 
[19]CALDON R, STOCCO A, TURRI R. Feasibility of adaptive intentional islanding operation of electric utility systems with distributed generation[J]. Electric Power Systems Research, 2008, 78(12):2017-2023.   
 