[1]王勇.风电工程建设中的管理模式及风险因素分析[J].风能, 2010,(9):34-37.
[2]Tareghian H R, Taheri S H. On the discrete time, cost and quality trade-off problem[J]. Applied Mathematics and Computation, 2006, 181 (2):1305-1312.
[3]Chen C H, Chong Y T, Chang W C, et al. A quality–time–cost-oriented strategy for product conceptualization[J]. Advanced Engineering Informatics, 2012, 26(1):51-52.
[4]代逸生,刘媛. 基于MCCAA的工期成本质量的多目标优化分析[J]. 科学技术与工程, 2012, 12(19):4676-4680.
[5]Eshtehardian E, Afshar A, Abbasni R, et al. Fuzzy-based MOGA approach to stochastic time-cost trade-off problem[J].Automation in Construction, 2009, 18(5): 692-701.
[6]Yang. I T. Stochastic time-cost tradeoff analysis: A distribution-free approach with focus on correlation and stochastic dominance[J]. Automation in Construction, 2011, 20(7):916-926.
[7]Szmerekovsky J G, Venkateshan P. An integer programming formulation for the project scheduling problem with irregular time–cost tradeoffs[J]. Computers & Operations Research, 2012,39(7):1402-1410.
[8]Ghoddousi P, Eshtehardian E, Jooybanpour S, et al. Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm[J]. Automation in Construction, 2013,30(1):216-227.
[9]Janss G F E, Lucas M, Whitfield D P, et al. The precautionary principle and wind-farm planning in Andalucia[J]. Biological Conservation, 2010, 143(8): 1827-1828.
[10]Muthuselvan N B, Devesh R M, Somasundaram P. Cauchy-Gaussian Infused Particle Swarm Optimization for Economic Dispatch with Wind Power Generation[J]. International Review of Electrical Engineering-IREE, 2011, 6(1): 387-395.
[11]Xu R, Chen H P, Li X P. A bi-objective scheduling problem on batch machines via a Pareto-based ant colony system[J]. International Journal of Production Economics, 2013, 145 (1) :371-386.
[12]Doerner K F, Gutjahr W J, Hartl R F, et al. Pareto ant colony optimization with ILP preprocessing in multiobjective project portfolio selection[J]. European Journal of Operational Research, 2006, 171(3) :830-841.
[13]靳丹, 何世恩, 丁坤. 关于大规模风电基地建设的思考[J]. 电力建设, 2011, 32(10) :63-65.
[14]盛大凯, 仇卫东, 齐立忠. 实现风电发展“五个转变”的有效途径[J]. 电力建设, 2011, 32(11) :6-9. |