[1]廖怀庆,刘东,黄玉辉,等.考虑新能源发电与储能装置接入的智能电网转供能力分析[J].中国电机工程学报,2012,32(16):9-16.
LIAO Huaiqing,LIU Dong,HUANG Yuhui,et al.Smart grid power transfer capability analysis considering integrated renewable energy resources and energy storage systems[J].Proceedings of the CSEE,2012,32(16):9-16.
[2]苏小林,李丹丹,阎晓霞,等.储能技术在电力系统中的应用分析[J].电力建设,2016,37(8):24-32.
SU Xiaolin,LI Dandan,YAN Xiaoxia,et al.Application analysis of energy storage technology in power system[J].Electric Power Construction, 2016,37(8):24-32.
[3]李丹丹,苏小林,阎晓霞,等.储能优化配置关键问题分析[J].电力建设,2016,37(9):70-78.
LI Dandan,SU Xiaolin,YAN Xiaoxia,et al.Principal problems of energy storage optimization allocation[J].Electric Power Construction, 2016,37(9):70-78.
[4]王宁,张建成.基于能量协调控制的混合储能系统容量配置方法[J].电力建设,2016,37(8):72-77.
WANG Ning,ZHANG Jiancheng.Capacity allocation method of hybrid energy storage systembased on energy coordination control[J].Electric Power Construction,2016,37(8):72-77.
[5]向育鹏,卫志农,孙国强,等.基于全寿命周期成本的配电网蓄电池储能系统的优化配置[J].电网技术,2015,39(1):264-270.
XIANG Yupeng,WEI Zhinong,SUN Guoqiang,et al.Life cycle cost based optimal configuration of battery energy storage system in distribution network[J].Power System Technology,2015,39(1):264-270.
[6]丁明,王波,赵波,等.独立风光柴储微网系统容量优化配置[J].电网技术,2013,37(3):575-581.
DING Ming,WANG Bo,ZHAO Bo,et al.Configuration optimization of capacity of standalone PV-wind-diesel-battery hybrid microgrid[J].Power System Technology,2013,37(3):575-581.
[7]李成,杨秀,张美霞,等.基于成本分析的超级电容器和蓄电池混合储能优化配置方案[J].电力系统自动化,2013,37(18):20-24.
LI Cheng,YANG Xiu,ZHANG Meixia,et al.Optimal configuration scheme for hybrid energy storage system of super-capacitors and batteries based on cost analysis[J].Automation of Electric Power Systems,2013,37(18):20-24.
[8]王成山,于波,肖俊,等,平滑微电网联络线功率波动的储能系统容量优化方法[J].电力系统自动化,2013,37(3):12-17.
WANG Chengshan,YU Bo,XIAO Jun,et al.An energy storage system capacity optimization method for microgrid tie-line power flow stabilization[J].Automation of Electric Power Systems,2013,37(3):12-17.
[9]刘文霞,牛淑娅,石道桂,等.考虑运行策略及投资主体利益的主动配电系统储能优化配置[J].电网技术,2015,39(10):2697-2704.
LIU Wenxia,NIU Shuya,SHI Daogui,et al.Optimal allocation of ADS battery energy storage considering operation strategy and investment subject benefit[J].Power System Technology,2015,39(10):2697-2704.
[10]章美丹,宋晓喆,辛焕海,等.计及网损的配电网电池储能站优化运行策略[J].电网技术,2013,37(8):2123-2128.
ZHANG Meidan,SONG Xiaozhe,XIN Huanhai,et al.Optimal operation strategy of battery energy storage system in distribution networks with consideration of power losses[J].Power System Technology,2013,37(8):2123-2128.
[11]国宗,韦钢,郭运城,等.面向供电能力提升的配电网储能功率动态优化[J].电力系统保护与控制, 2015,43(19):1-8.
GUO Zong,WEI Gang,GUO Yuncheng,et al.Dynamic optimization of energy storage power in distribution network based on power supply capacity[J].Power System Protection and Control,2015,43(19):1-8.
[12]鲍冠南,陆超,袁志昌,等.基于动态规划的电池储能系统削峰填谷实时优化[J].电力系统自动化,2012,36(12):11-16.
BAO Guannan,LU Chao,YUAN Zhichang,et al.Load shift real-time optimization strategy of battery energy stoyage system based on dynamic programming[J].Automation of Electric Power Systems,2012,36(12):11-16.
[13]杨玉青,牛利勇,田立亭,等.考虑负荷优化控制的区域配电网储能配置[J].电网技术,2015,39(4):1019-1025.
YANG Yuqing,NIU Liyong,TIAN Liting,et al.Configuration of energy storage devices in regional distribution network considering optimal load control[J].Power System Technology,2015,39(4):1019-1025.
[14]阮文骏,王蓓蓓,李扬,等.峰谷分时电价下的用户响应行为研究[J].电网技术,2012,36(7):86-93.
RUAN Wenjun,WANG Beibei,LI Yang,et al.Customer response behavior in time-of-use price[J],Power System Technology,2012,36(7):86-93.
[15]王守相,王成山.现代配电系统分析[M].北京:高等教育出版社,2007:196-202.
WANG Shouxiang,WANG Chengshan.Modern distribution system analysis[M].Beijing:Higher Education Press,2007:196-202.
[16]刘公博,颜文涛,张文斌,等.含分布式电源的配电网动态无功优化调度方法[J].电力系统自动化,2015,39(15):49-54.
LIU Gongbo,YAN Wentao,ZHANG Wenbin,et al.Optimization and dispatching method of dynamic reactive power in distribution network with distributed generators[J].Automation of Electric Power Systems,2015,39(15):49-54.
[17]段开锋.电池储能系统在配电网中的应用研究[D].北京:北京交通大学,2014.
DUAN Kaifeng,The application of battery energy storage system in the distribution network[D].Beijing:Beijing Jiaotong University,2014.
[18]陈沧杨,胡博,谢开贵,等.计入电力系统可靠性与购电风险的峰谷分时电价模型[J].电网技术,2014,38(8):2141-2148.
CHEN Cangyang,HU Bo,XIE Kaigui,et al.A peak-valley TOU price model considering power system reliability andpower purchase risk[J].Power System Technology,2014,38(8):2141-2148. |