• CSCD核心库收录期刊
  • 中文核心期刊
  • 中国科技核心期刊

电力建设 ›› 2017, Vol. 38 ›› Issue (2): 129-.doi: 10.3969/j.issn.1000-7229.2017.02.018

• 新能源发电 • 上一篇    下一篇

考虑风电不确定性及柔性负荷的安全约束机组组合问题研究

李禹鹏1,2,冯楠2,崔勇2,杨增辉2,王晗1,徐潇源1,严正1#br#   

  1. 1.电力传输与功率变换控制教育部重点实验室(上海交通大学),上海市 200240;
    2.国网上海市电力公司,上海市 200122
  • 出版日期:2017-02-01
  • 作者简介:李禹鹏(1986),男,硕士,主要研究方向为电力系统稳定分析、电网建设和规划;冯楠(1989),女,硕士,主要研究方向为电力系统仿真分析、电力系统优化运行;崔勇(1985),男,硕士,主要研究方向为电力系统稳定分析、电网运行仿真分析;杨增辉(1976),男,硕士,高级工程师,主要研究方向为电力系统运行分析与控制;王晗(1993),男,硕士研究生,本文通信作者,主要研究方向为电力系统优化、电力系统稳定及概率潮流;徐潇源(1989),男,博士后,主要研究方向为概率潮流,电力系统优化与稳定分析;严正(1964),男,教授,博士生导师,主要研究方向为电力系统优化运行、电力系统稳定分析及智能电网。
  • 基金资助:
    国网上海市电力公司科技项目(52094015001S)

Security Constrained Unit Commitment Problem Considering Wind Power Uncertainty and Flexible Load#br#

LI Yupeng1,2,FENG Nan2,CUI Yong2,YANG Zenghui2,WANG Han1,XU Xiaoyuan1,YAN Zheng1#br#   

  1. 1. Key Laboratory of Power Transmission and Conversion, Ministry of Education
    (Shanghai Jiao Tong University), Shanghai 200240, China; 2. State Grid Shanghai
     Municipal Electric Power Company, Shanghai 200122, China
  • Online:2017-02-01
  • Supported by:
     

摘要: 针对风电出力的不确定性,采用基于拟蒙特卡洛(quasi-Monte Carlo,QMC)模拟的场景分析法生成风电出力初始场景,选取考虑风电预测误差较大的极限场景实现场景缩减。在不同的风电出力场景下,兼顾发电侧与需求侧柔性负荷的双侧协调配合,提出了计及柔性负荷的安全约束机组组合模型,实现了可削减负荷、可平移负荷以及可转移负荷3类柔性负荷的分类调度。通过对不同场景下10机系统的仿真计算,对比分析了需求侧柔性负荷调度对系统的经济成本、负荷峰谷差以及弃风量的影响。在考虑风电不确定性时,需求侧柔性负荷调度对提高系统经济性、缓解负荷高峰期用电压力具有重要作用,并且有利于增加风电的消纳,降低弃风电量。

关键词:  风电, 不确定性, 柔性负荷, 机组组合, 拟蒙特卡洛(QMC)模拟

Abstract: In view of the uncertainty of wind power output, based on quasi-Monte Carlo (QMC) simulation method, this paper uses the scenario analysis method to generate initial scenario of wind power output, and selects the extreme scenario including larger wind power prediction error to achieve the reduction of scenario. With different wind power output scenarios, taking into account the bilateral coordination of generation side and demand side with flexible load, this paper proposes the security constrained unit commitment model with flexible load, which can schedule three types of flexible load including curtailable load, shiftable load and transferable load. Through the simulation of different scenarios of 10 units, the influence of the demand side flexible load dispatch on the economic cost, the load peak valley difference and the exhaust air volume are analyzed and compared. Considering the uncertainty of wind power, the demand side of the flexible load scheduling plays an important role in improving the economy of the system and alleviating the peak load, and is beneficial to increase the consumption of wind power and reduce the abandoned wind power.

Key words: wind power, uncertainty, flexible load, unit commitment, quasi-Monte Carlo (QMC) simulation