[1]〖HJ*3〗陆佳政,蒋正龙,雷红才,等.湖南电网2008年冰灾事故分析[J].电力系统自动化,2008,32(11):16-19.
LU Jiazheng,JIANG Zhenglong,LEI Hongcai,et al.Analysis of Hunan power grid ice disaster accident in 2008 [J].Automation of Electric Power Systems,2008,32(11):16-19.
[2]林伟芳,孙华东,汤涌,等.巴西“11·10”大停电事故分析及启示[J].电力系统自动化,2010,34(7):1-5.
LIN Weifang,SUN Huadong,TANG Yong,et al.Analysis and lessons of the blackout in Brazil power grid on November 10,2009 [J].Automation of Electric Power Systems,2010,34(7):1-5.
[3]薛禹胜,肖世杰.综合防御高风险的小概率事件—对日本相继天灾引发大停电及核泄漏事件的思考[J].电力系统自动化,2011,35(8):1-11.
XUE Yusheng,XIAO Shijie.Comprehensively defending high risk events with low probability [J].Automation of Electric Power Systems,2011,35(8):1-11.
[4]陈丽娟,胡小正.2010年全国输变电设施可靠性分析[J].中国电力,2011,44(6):71-77.
CHEN Lijuan,HU Xiaozheng.Statistic analysis on reliability of power transmission and transformation facilities in China in 2010 [J].Electric Power,2011,44(6):71-77.
[5]陈丽娟,李霞.2011年全国输变电设施可靠性分析[J].中国电力,2012,45(7):89-93.
CHEN Lijuan,LI Xia.Statistic analysis on reliability of power transmission and transformation facilities in China in 2011[J].Electric Power,2012,45(7):89-93.
[6]甘霖,刘育权,文福拴,等.弹性电力系统及其恢复策略研究的理论与实践[M].北京:科学出版社,2016.
GAN Lin,LIU Yuquan,WEN Fushuan,et al.Theory and applications of resilient power systems and associated restoration strategies [M].Beijing:Science Press,2016.
[7]别朝红,林燕翎,邱爱慈.弹性电网及其恢复力的基本概念与研究展望[J].电力系统自动化,2015,39(22):1-9.
BIE Zhaohong,LIN Yanling,QIU Aici.Concept and research prospects of power system resilience[J].Automation of Electric Power Systems,2015,39(22):1-9.
[8]黄裕春,文福拴,杨甲甲,等.含高渗透率间歇性电源的电力网络规划评价体系初探[J].电力建设,2015,36(10):144-153.
HUANG Yuchun,WEN Fushuan,YANG Jiajia,et al.A preliminary investigation on power network planning evaluation system with high-penetration intermittent generation [J].Electric Power Construction,2015,36(10):144-153.
[9]ZHU Y,YAN J,TANG Y,et al.Resilience analysis of power grids under the sequential attack [J].IEEE Transactions on Information Forensics and Security,2014,9(12):2340-2354.
[10]ALGUACIL N,DELGADILLO A,ARROYO J M.A trilevel programming approach for electric grid defense planning [J].Computers and Operations Research,2014,41(1):282-290.
[11]于晗,钟志勇,黄杰波,等.考虑负荷和风电出力不确定性的输电系统机会约束规划[J].电力系统自动化,2009,33(2):20-24.
YU Han,CHONG C Y,WONG K P,et al.A chance constrained transmission network expansion planning method associated with load and wind farm variations [J].Automation of Electric Power Systems,2009,33(2):20-24.
[12]黄裕春,杨甲甲,文福拴,等.计及接纳间歇性电源能力的输电系统规划方法[J].电力系统自动化,2013,37(4):28-34.
HUANG Yuchun,YANG Jiajia,WEN Fushuan,et al.Transmission system planning considering capability of accommodating intermittent generation sources [J].Automation of Electric Power Systems,2013,37(4):28-34.
[13]郑静,文福拴,周明磊,等.计及可用输电能力的含大规模风电的输电系统规划[J].电力建设,2015,36(10):73-81.
ZHENG Jing,WEN Fushuan,ZHOU Minglei,et al.Transmission system planning in power systems with wind generators considering available transfer capability [J].Electric Power Construction,2015,36(10):73-81.
[14]ZHAO J H,DONG Z Y,LINDSAY P,et al.Flexible transmission expansion planning with uncertainties in an electricity market[J].IEEE Transactions on Power Systems,2009,24(1):479-488.
[15]陈皓勇,胡斌,叶荣.计及气象灾害因素的电网规划方法[J].电网技术,2009,33(20):82-87.
CHEN Haoyong,HU Bin,YE Rong.Transmission network planning considering weather disaster[J].Power System Technology,2009,33(20):82-87.
[16]徐国新,夏清,康重庆.抗灾型电网规划模式与模型[J].电力系统自动化,2010,34(3):17-21.
XU Guoxin,XIA Qing,KANG Chongqing.Research on mode and model of anti-disaster transmission network expansion planning [J].Automation of Electric Power Systems,2010,34(3):17-21.
[17]肖峻,钟华赞,于波.含微网城市配电网的抗灾型多场景规划[J].电力系统保护与控制,2012,40(1):101-106,114.
XIAO Jun,ZHONG Huazan,YU Bo.Multi-scenario anti-disaster planning for urban distribution networks containing microgrid [J].Power System Protection and Control,2012,40(1):101-106,114.
[18]王秀丽,张凯,曾平良.基于多场景的风电场接入与输电网协调规划[J].电力建设,2015,36(10):46-52.
WANG Xiuli,ZHANG Kai,ZENG Pingliang.Coordinated planning of wind farm integration and transmission network based on multi-scenario [J].Electric Power Construction,2015,36(10):46-52.
[19]王永杰,吴文传,张伯明.考虑负荷量测和光伏不确定性的主动配电网鲁棒电压控制[J].电力系统自动化,2015,39(9):138-144.
WANG Yongjie,WU Wenchuan,ZHANG Boming.Robust voltage control model for active distribution network considering load and photovoltaic uncertainties[J].Automation of Electric Power Systems,2015,39(9):138-144.
[20]王彬,何光宇,卢建刚,等.考虑电网运行状态不确定性的最优潮流研究[J].电力建设,2014,35(10):1-6.
WANG Bin,HE Guangyu,LU Jiangang,et al.Optimal power flow considering operation state uncertainty of power system [J].Electric Power Construction,2014,35(10):1-6.
[21]薛禹胜,吴勇军,谢云云,等.复合自然灾害下的电力系统稳定性分析[J].电力系统自动化,2016,40(4):10-18.
XUE Yusheng,WU Yongjun,XIE Yunyun,et al.Power system stability analysis for intercurrent natural disasters [J].Automation of Electric Power Systems,2016,40(4):10-18.
[22]黄江宁,郭瑞鹏,赵舫,等.基于故障集分类的电力系统可靠性评估方法[J].中国电机工程学报,2013,33(16):112-121.
HUANG Jiangning,GUO Ruipeng,ZHAO Fang,et al.Fault set classification method for power system reliability evaluation [J].Proceedings of the CSEE,2013,33(16):112-121.
[23]程浩忠,高赐威,马则良,等.多目标电网规划的分层最优化方法[J].中国电机工程学报,2003,23(10):11-16.
CHENG Haozhong,GAO Ciwei,MA Zeliang,et al.The lexicographically stratified method for multi-objective optimal electric power network planning [J].Proceedings of the CSEE,2003,23(10):11-16.
[24]王锡凡.电力系统优化规划[M].北京:水利电力出版社,1990.
WANG Xifan.Power system optimal planning [M].Beijing:China Water and Power Press,1990. |