[1]国家电网公司“十三五电网发展规划”[R].北京:国家电网公司,2015.
[2]白建华,闫晓卿,程路.“十三五”电力流及电源规划方案研究[J].中国电力,2015,48(1):15-20.
BAI Jianhua,YAN Xiaoqing,CHENG Lu.Research on power flow and power source installation planning scheme during the 13th Five-Year Period[J].Electric Power,2015,48(1):15-20.
[3]贾俊川,赵兵,罗煦之,等. 青藏直流投运后藏中电网稳定特性研究[J]. 电力系统保护与控制,2014,42(6):104-109.
JIA Junchuan,ZHAO Bing,LUO Xuzhi,et al.Research on the security and stability characteristics of Central Tibet power grid after Qinghai-Tibet HVDC putting into operation [J].Power System Protection and Control,2014,42(6):104-109.
[4]周保荣,柳勇军,陈建斌,等. 核电机组停运对南方电网运行影响研究[J]. 南方电网技术,2011,5(3):27-30.
ZHOU Baorong,LIU Yongjun,CHEN Jianbin,et al.Study on the impact of nuclear power plant outage on the CSG operation [J].Southern Power System Technology,2011,5(3):27-30.
[5]徐其春. 对日本核危机及中国电力发展的思考[J]. 能源技术经济,2011,23(11):21-25.
Xu Qichun.On Japan’s nuclear crisis and its impact on China’s electric power development[J].Energy Technology and Economics,2011,23(11):21-25.
[6]印永华,郭剑波,赵建军,等. 美加“8.14”大停电事故初步分析以及应吸取的教训[J]. 电网技术,2003,27(10):8-11.
YIN Yonghua,GUO Jianbo,ZHAO Jianjun,et al.Preliminary analysis of large scale blackout in interconnected north America power grid on August 14 and lessons to be drawn[J].Power System Technology,2003,27(10):8-11.
[7]汤涌,卜广全,易俊. 印度“7.30”、“7.31”大停电事故分析及启示[J]. 中国电机工程学报,2012,32(25):167-174.
TANG Yong,BU Guangquan,YI Jun.Analysis and lessons of the blackout in Indian power grid on July 30 and 31,2012[J].Proceedings of the CSEE,2012,32(25):167-174.
[8]刘振亚,舒印彪,张运洲,等.直流输电电压等级序列研究[R].北京:国网北京经济技术研究院,2008.
[9]张运洲,韩丰,赵彪,等. 直流电压等级序列的经济比较[J]. 电网技术,2008,32(9):37-41.
ZHANG Yunzhou,HAN Feng,ZHAO Biao,et al.Economic comparison of HVDC voltage class sequence[J].Power System Technology,2008,32(9):37-41.
[10]覃琴,郭强,周勤勇,等.国网“十三五”规划电网面临的安全稳定问题及对策[J].中国电力,2015,48(1):25-32.
QIN Qin,GUO Qiang,ZHOU Qinyong,et al.The security and stability of power grids in 13th Five-Year Planning and countermeasures[J].Electric Power,2015,48(1):25-32.
[11]林伟芳,汤涌,郭小江. 多馈入交直流系统短路比影响因素分析[J]. 电网技术,2011,35(8):64-68.
LIN Weifang,TANG Yong,GUO Xiaojiang.Analysis of influencing factors of short circuit ratio of multi-infeed AC/DC power systems[J].Power System Technology,2011,35(8):64-68.
[12]吴萍,林伟芳,孙华东,等. 多馈入直流输电系统换相失败机制及特性[J]. 电网技术,2012,36(5):269-274.
WU Ping,LIN Weifang,SUN Huadong,et al.Research and electromechanical transient simulation on mechanism of commutation failure in multi-infeed HVDC power transmission system[J].Power System Technology,2012,36(5):269-274.
[13]ZHANG Lidong,DOFNAS L.A novel method to mitigate commutation failures in HVDC systems[C]// International Conference on Power System Technology Proceedings.Kunming:IEEE Power Engineering Society(IEEE PES) and Chinese Society for Electrical Engineering(CSEE),2002:51-56.
[14]林伟芳,孙华东,汤涌,等. 巴西“11·10”大停电事故分析及启示[J]. 电力系统自动化,2010,34(7):1-5.
LIN Weifang,SUN Huadong,TANG Yong,et al.Analysis and lessons of the blackout in Brazil power grid on November 10,2009[J].Automation of Electric Power Systems,2010,34(7):1-5.
[15]汤涌,郭强,周勤勇,等.特高压同步电网安全性论证[J].电网技术,2016,40(1):97-104.
TANG Yong,GUO Qiang,ZHOU Qinyong,et al.Security evaluation for UHV synchronized power grid[J].Power System Technology,2016,40(1):97-104.
|