35 kV变电站作为智能电网变电的最后1个环节,其建设量大、分布广泛,故不但要考虑其智能、可靠、安全、高效地运行,还要考虑其经济性;目前该电压等级的智能变电站建设仍然没有可依照的设计规范和建设模式。提出了一种35 kV智能变电站的集成化建设模式,从各个方面对智能变电站不同类型的建设模式进行了对比分析。

Abstract

The 35 kV smart substation, the last link of smart substation, is widely distributed with large number of construction projects, of which the economic operation is very important except for smart, reliable, safe and high efficient operation. However, there is still no design specifications and construction modes for the construction of the smart substation with this voltage level at present. Therefore, a integrated construction mode is presented for 35 kV smart substation, and different construction modes of the smart substation are compared from all aspects.

关键词

智能变电站 / 集成 / IEC 61850 / 智能终端

引用本文

导出引用
宋祺鹏,盛万兴,王金宇,王金丽,杨红磊. 35 kV智能变电站的集成化建设模式[J]. 电力建设. 2011, 32(11): 45-47
A Integrated Construction Mode of 35 kV Smart Substation[J]. Electric Power Construction. 2011, 32(11): 45-47