基于强夯与强夯置换法的电厂地基处理

郑卫锋 吴尚林 张伟 冯自霞

电力建设 ›› 2011, Vol. 32 ›› Issue (11) : 55-58.

PDF(1009 KB)
PDF(1009 KB)
电力建设 ›› 2011, Vol. 32 ›› Issue (11) : 55-58.
发电技术

基于强夯与强夯置换法的电厂地基处理

  • 郑卫锋1,吴尚林2,张伟1,冯自霞1
作者信息 +

Dynamic Compaction and Dynamic Replacement for Ground Treatment in Electric Power Plant

Author information +
文章历史 +

摘要

针对某电厂饱和软粘土的特殊地质条件,分别采用强夯与强夯置换法进行了地基加固处理。详细介绍了设计方案,通过平板载荷试验、超重型动力触探试验、密实度试验等检测方法对地基加固效果进行综合评价分析,进一步验证了强夯与强夯置换法的适用条件,对此类工程的地基加固处理具有一定的参考意义。

Abstract

Focusing on the saturated soft soil foundation in electric power plant, the dynamic compaction and dynamic replacement method are adopted. The design and execution process are introduced in detail. The reinforcing effects are comprehensively evaluated based on the results of plate loading test, super-heavy dynamic penetration test and density test. In addition, the applicable conditions for the dynamic compaction and dynamic replacement method are presented, that should be helpful to the design of similar projects.

关键词

地基处理 / 强夯 / 强夯置换 / 加固机制

引用本文

导出引用
郑卫锋 吴尚林 张伟 冯自霞. 基于强夯与强夯置换法的电厂地基处理[J]. 电力建设. 2011, 32(11): 55-58
Dynamic Compaction and Dynamic Replacement for Ground Treatment in Electric Power Plant[J]. Electric Power Construction. 2011, 32(11): 55-58
中图分类号: TU47   