大跨度钢网架安装工艺和质量关键点防控

张学刚 韩志永

电力建设 ›› 2011, Vol. 32 ›› Issue (11) : 96-98.

PDF(720 KB)
PDF(720 KB)
电力建设 ›› 2011, Vol. 32 ›› Issue (11) : 96-98.
施工技术

大跨度钢网架安装工艺和质量关键点防控

  • 张学刚,韩志永
作者信息 +

Installation Technique of Large-crossing Steel Frame and Key Points Prevention of Quality

Author information +
文章历史 +

摘要

钢网架架设安装系高危施工作业,对施工质量要求高。越南海防一期燃煤热电厂储煤棚屋面钢网架采用高空拼装法安装,从网架安装支撑平台搭设、网架安装工艺、质量关键点防控等方面对网架施工进行了总结,可为相关工程提供参考。

Abstract

The installation of steel frame is a kind of highly dangerous work, requiring high-quality construction. In the first stage project of Haiphong coal-fired power plant of Vietnamese, the steel frame on the roof of the coal bunker is installed by the assembly technology at high altitude. In this paper, the establishment of supporting platform, installation technique of steel frame and key points prevention of quality are summarized, providing references for similar projects.

关键词

大跨度 / 钢网架 / 安装工艺 / 防控措施

引用本文

导出引用
张学刚 韩志永. 大跨度钢网架安装工艺和质量关键点防控[J]. 电力建设. 2011, 32(11): 96-98
Installation Technique of Large-crossing Steel Frame and Key Points Prevention of Quality[J]. Electric Power Construction. 2011, 32(11): 96-98

PDF(720 KB)

Accesses

Citation

Detail

段落导航
相关文章
AI小编
你好!我是《电力建设》AI小编,有什么可以帮您的吗?

/