±800kV特高压线路耐张塔边横担特殊吊装技术

景国明 陶春蓉 王建欣

电力建设 ›› 2011, Vol. 32 ›› Issue (5) : 114-117.

PDF(1381 KB)
PDF(1381 KB)
电力建设 ›› 2011, Vol. 32 ›› Issue (5) : 114-117.
施工技术

±800kV特高压线路耐张塔边横担特殊吊装技术

  • 景国明1,陶春蓉2,王建欣1
作者信息 +

Hoisting Technology of Edge Cross Arms of Tension Tower for ±800 kV UHV Transmission Line

Author information +
文章历史 +

摘要

±800 kV特高压直流线路工程中采用的耐张转角塔具有高、重、横担长特点,在现场特殊环境条件下,常规施工方法无法完成耐张塔边横担吊装。介绍了采用内悬浮主抱杆配合塔上人字抱杆顺利完成吊装边横担的特殊施工技术。

Abstract

The tension towers used in ± 800 kV ultra-high voltage transmission line, tall and heavy, have long cross arms. As a result of the special environment in the field installation, it is difficult to hoist the edge cross arms of tension tower by conventional methods. Therefore, a special construction method is provided to hoist the edge cross arms successfully that the main gin pole suspended in inner tower is assisted by the herringbone pole.

关键词

特高压 / 耐张塔 / 特殊环境 / 边横担 / 吊装

引用本文

导出引用
景国明 陶春蓉 王建欣. ±800kV特高压线路耐张塔边横担特殊吊装技术[J]. 电力建设. 2011, 32(5): 114-117
Hoisting Technology of Edge Cross Arms of Tension Tower for ±800 kV UHV Transmission Line[J]. Electric Power Construction. 2011, 32(5): 114-117

PDF(1381 KB)

Accesses

Citation

Detail

段落导航
相关文章
AI小编
你好!我是《电力建设》AI小编,有什么可以帮您的吗?

/