为研究输电线路杆塔水平档距的折算方法,从杆塔规划入手,通过分析悬垂型杆塔及耐张型杆塔的受力特点,分析了杆塔的主要控制工况及其对选材和杆塔综合指标的影响,得出了悬垂型杆塔及耐张型杆塔设计时是否考虑档距折算的原因,并给出了悬垂型杆塔折算档距的计算原则和工程中的折算方法。

Abstract

In order to study the conversion method for horizontal span of power transmission tower, the force features of suspension and tension tower are considered by starting from the tower design. The main control conditions and their influences on material selection and composite indicators of tower are analyzed. The reason is provided that the span conversion should be considered or not for designing the suspension and tension tower. In addition, the calculation principle and method of span conversion are presented for suspension tower.

关键词

档距折算 / 风荷载 / 悬垂杆塔 / 耐张杆塔 / 控制工况 / 计算方法

Key words

span conversion / wind loading / suspension tower / tension tower / control condition / calculating method

引用本文

导出引用
任宗栋,刘泉 默增禄 苏京伟,林振联. 输电线路杆塔水平档距折算方法[J]. 电力建设. 2011, 32(5): 39-41
Conversion Method for Horizontal Span of Power Transmission Tower[J]. Electric Power Construction. 2011, 32(5): 39-41

PDF(904 KB)

Accesses

Citation

Detail

段落导航
相关文章
AI小编
你好!我是《电力建设》AI小编,有什么可以帮您的吗?

/