1 000 MW超超临界机组汽轮机启动和试运问题分析

邓小文 崔振东

电力建设 ›› 2012, Vol. 33 ›› Issue (5) : 93-96.

PDF(503 KB)
PDF(503 KB)
电力建设 ›› 2012, Vol. 33 ›› Issue (5) : 93-96.
运行与管理

1 000 MW超超临界机组汽轮机启动和试运问题分析

  • 邓小文,崔振东
作者信息 +

Analysis of Problems in Starting-up and Commissioning Process of 1 000 MW Ultra-supercritical Steam Turbine

Author information +
文章历史 +

摘要

结合某电厂机组启动、试运实例,介绍引进西门子技术制造的1 000 MW超超临界机组汽轮机结构特点和启动过程控制技术;在分析启动、试运过程中出现问题的基础上,提出1 000 MW超超临界机组调试及锅炉蒸汽吹管的优化建议,为同类机组试运、调试提供参考。

Abstract

Base on the units starting-up and commissioning process in a power plant, this paper introduced the structure characteristics and starting-up processs control technologies of 1 000 MW steam turbine with SIEMENS technology. Problems in starting-up and commissioning process were analyzed, and some proposal were put forward for the commissioning of 1 000 MW ultra-supercritical unit and the optimization of boiler steam-blowing, which could provide references for other units commissioning.

引用本文

导出引用
邓小文 崔振东. 1 000 MW超超临界机组汽轮机启动和试运问题分析[J]. 电力建设. 2012, 33(5): 93-96
Analysis of Problems in Starting-up and Commissioning Process of 1 000 MW Ultra-supercritical Steam Turbine[J]. Electric Power Construction. 2012, 33(5): 93-96

PDF(503 KB)

Accesses

Citation

Detail

段落导航
相关文章
AI小编