主变压器与GIS的GIL连接方案分析

刘盛 周志超 钱锋 况骄庭

电力建设 ›› 2012, Vol. 33 ›› Issue (6) : 27-29.

PDF(485 KB)
PDF(485 KB)
电力建设 ›› 2012, Vol. 33 ›› Issue (6) : 27-29.
输配电技术

主变压器与GIS的GIL连接方案分析

  • 刘盛1,周志超1,钱锋1,2,况骄庭1
作者信息 +

Analysis on GIL Connection for Main Transformer and GIS

Author information +
文章历史 +

摘要

为优化户外气体绝缘开关设备(gas insulated switchgear, GIS)变电站的布置,采用了气体绝缘母线(gas insulated line, GIL)连接主变和GIS设备。通过技术、经济比较,此方案能节省变电站占地和投资,并能提高连接的可靠性,促进两型一化智能变电站的建设。同时,从出厂、交接、预防性试验及检修等角度分析了应用GIL连接带来的问题,提出相应的建议方案。

Abstract

The application of gas-insulated line (GIL) connection was analyzed through techno-economic comparison, for the layout optimization of outdoor gas-insulated switchgear (GIS) substation. The result shows that this method has some advantages, such as economic in investment, little in occupy floor, reliable in connection, and it can promote the “resource conserving, environmental friendly and industrialized” substation construction. This paper put forward some proposals for the application of GIL connection, based on the deep analysis on the problems of using GIL connection during factory, handover preventive testing or maintenance.

关键词

变电站 / 油-SF6套管 / GIL连接

Key words

substation / SF6 oil bushing / GIL connection

引用本文

导出引用
刘盛 周志超 钱锋 况骄庭. 主变压器与GIS的GIL连接方案分析[J]. 电力建设. 2012, 33(6): 27-29
Analysis on GIL Connection for Main Transformer and GIS[J]. Electric Power Construction. 2012, 33(6): 27-29

PDF(485 KB)

Accesses

Citation

Detail

段落导航
相关文章
AI小编
你好!我是《电力建设》AI小编,有什么可以帮您的吗?

/